Extension of the sewerage network in the agglomeration of the Nedrzawka River agglomeration (Q105683): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The main aim of the planned project is to improve the quality of the environment in the municipality of Bear England through the construction of a sewerage system. In the context of the project ‘Extension of the sewerage network in the agglomeration of Noedrzawka Duża’, the municipality of Bear Island is planning to implement a sewerage project involving the construction of a sewerage system in conjunction with the sewerage system in the town...)
(‎Created claim: summary (P836): The main objective of the planned project is to improve the quality of the environment in the Non-Door Big Town thanks to the construction of sewage drainage. As part of the project “Expansion of the sewage network in the Niedzwica Duża agglomeration” the municipality plans to implement a project consisting of the construction of sanitary sewage and sewage systems in Niedrzwica Duża. The task will include: construction of sanitary sewage system...)
Property / summary
 
The main objective of the planned project is to improve the quality of the environment in the Non-Door Big Town thanks to the construction of sewage drainage. As part of the project “Expansion of the sewage network in the Niedzwica Duża agglomeration” the municipality plans to implement a project consisting of the construction of sanitary sewage and sewage systems in Niedrzwica Duża. The task will include: construction of sanitary sewage system in ul. A frog, a hive. The new one, ul. The field, ul. Kraśnicka, ul. Dworcowa and in the area of ul. Lubelska, along the river Nędznica and the passage under the above mentioned river, cross passages under the national, county roads, municipal and internal roads, construction of a press canal, construction of sewage canals to private plots, implementation of incorporation into the existing sewage network. The total length of the network planned to be made will be 8762 m, of which the gravitational drainage network is 4691.5 m, the drainage drainage network is 164.5 m, and the gravitational channel is 3924 m, while the pressure canals are 18.0 m. The project is also beneficial due to the environmental objectives of reducing pollution of surface and underground water and improving the quality of life of residents. The sewage will be discharged to the existing sewage treatment plant at ul. Downhills in the Big Door. Due to the terrain and to avoid significant drainage of the sanitary system, 3 sewage pumping plants were used at the street. It’s a frog. The project will also modernise the water supply network through the replacement of 130 water meters, for water meters with radio reading pads, as well as a mobile device to measure the quality of sewage. (English)
Property / summary: The main objective of the planned project is to improve the quality of the environment in the Non-Door Big Town thanks to the construction of sewage drainage. As part of the project “Expansion of the sewage network in the Niedzwica Duża agglomeration” the municipality plans to implement a project consisting of the construction of sanitary sewage and sewage systems in Niedrzwica Duża. The task will include: construction of sanitary sewage system in ul. A frog, a hive. The new one, ul. The field, ul. Kraśnicka, ul. Dworcowa and in the area of ul. Lubelska, along the river Nędznica and the passage under the above mentioned river, cross passages under the national, county roads, municipal and internal roads, construction of a press canal, construction of sewage canals to private plots, implementation of incorporation into the existing sewage network. The total length of the network planned to be made will be 8762 m, of which the gravitational drainage network is 4691.5 m, the drainage drainage network is 164.5 m, and the gravitational channel is 3924 m, while the pressure canals are 18.0 m. The project is also beneficial due to the environmental objectives of reducing pollution of surface and underground water and improving the quality of life of residents. The sewage will be discharged to the existing sewage treatment plant at ul. Downhills in the Big Door. Due to the terrain and to avoid significant drainage of the sanitary system, 3 sewage pumping plants were used at the street. It’s a frog. The project will also modernise the water supply network through the replacement of 130 water meters, for water meters with radio reading pads, as well as a mobile device to measure the quality of sewage. (English) / rank
 
Normal rank
Property / summary: The main objective of the planned project is to improve the quality of the environment in the Non-Door Big Town thanks to the construction of sewage drainage. As part of the project “Expansion of the sewage network in the Niedzwica Duża agglomeration” the municipality plans to implement a project consisting of the construction of sanitary sewage and sewage systems in Niedrzwica Duża. The task will include: construction of sanitary sewage system in ul. A frog, a hive. The new one, ul. The field, ul. Kraśnicka, ul. Dworcowa and in the area of ul. Lubelska, along the river Nędznica and the passage under the above mentioned river, cross passages under the national, county roads, municipal and internal roads, construction of a press canal, construction of sewage canals to private plots, implementation of incorporation into the existing sewage network. The total length of the network planned to be made will be 8762 m, of which the gravitational drainage network is 4691.5 m, the drainage drainage network is 164.5 m, and the gravitational channel is 3924 m, while the pressure canals are 18.0 m. The project is also beneficial due to the environmental objectives of reducing pollution of surface and underground water and improving the quality of life of residents. The sewage will be discharged to the existing sewage treatment plant at ul. Downhills in the Big Door. Due to the terrain and to avoid significant drainage of the sanitary system, 3 sewage pumping plants were used at the street. It’s a frog. The project will also modernise the water supply network through the replacement of 130 water meters, for water meters with radio reading pads, as well as a mobile device to measure the quality of sewage. (English) / qualifier
 
point in time: 17 October 2020
Timestamp+2020-10-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:54, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Extension of the sewerage network in the agglomeration of the Nedrzawka River agglomeration
Project in Poland financed by DG Regio

    Statements

    0 references
    3,116,508.22 zloty
    0 references
    747,961.97 Euro
    13 January 2020
    0 references
    3,666,480.27 zloty
    0 references
    879,955.26 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    8 May 2017
    0 references
    31 December 2021
    0 references
    GMINA NIEDRZWICA DUŻA
    0 references
    Celem głównym planowanego projektu jest poprawa jakości środowiska naturalnego w Gminie Niedrzwica Duża dzięki budowie kanalizacji ściekowej. Gmina Niedrzwica Duża planuje w ramach projektu "Rozbudowa sieci kanalizacyjnej na terenie aglomeracji Niedrzwica Duża" zrealizować przedsięwzięcie polegające na budowie kanalizacji sanitarnej wraz z przykanalikami w miejscowości Niedrzwica Duża. Zadanie będzie obejmowało: budowę sieci kanalizacji sanitarnej w ul. Żabiej, ul. Nowej, ul. Polnej, ul. Kraśnickiej, ul. Dworcowej oraz w rejonie ul. Lubelskiej, wzdłuż rzeki Nędznicy oraz przejście pod w/w rzeką, przejścia poprzeczne pod drogą krajową, powiatową, drogami gminnymi i wewnętrznymi, budowę kanału tłocznego, budowę przykanalików do działek prywatnych, wykonanie włączenia do istniejącej sieci kanalizacyjnej. Łączna długość sieci planowanej do wykonania wyniesie 8762 m, z czego sieć kanalizacji grawitacyjnej to 4691,5 m, sieć kanalizacji tłocznej to 164,5 m, a przykanaliki grawitacyjne to 3924 m natomiast przykanalików tłocznych 18,0 m. Projekt jest również korzystny ze względu na realizację celów środowiskowych jakimi są obniżenie zanieczyszczeń wód powierzchniowych i podziemnych oraz podniesienie jakości życia mieszkańców. Ścieki odprowadzane będą do istniejącej oczyszczalni ścieków przy ul. Górki w Niedrzwicy Dużej. Ze względu na ukształtowanie terenu i celem uniknięcia znacznego zagłębienia sieci kanalizacji sanitarnej zastosowano 3 przepompownie ścieków przy ul. Żabiej. W ramach projektu nastąpi również modernizacja sieci wodociągowej poprzez wymianę 130 wodomierzy, na wodomierze z nakładką do odczytu radiowego, zakupione zostanie także mobilne urzadzenie do pomiaru jakości ścieków. (Polish)
    0 references
    The main objective of the planned project is to improve the quality of the environment in the Non-Door Big Town thanks to the construction of sewage drainage. As part of the project “Expansion of the sewage network in the Niedzwica Duża agglomeration” the municipality plans to implement a project consisting of the construction of sanitary sewage and sewage systems in Niedrzwica Duża. The task will include: construction of sanitary sewage system in ul. A frog, a hive. The new one, ul. The field, ul. Kraśnicka, ul. Dworcowa and in the area of ul. Lubelska, along the river Nędznica and the passage under the above mentioned river, cross passages under the national, county roads, municipal and internal roads, construction of a press canal, construction of sewage canals to private plots, implementation of incorporation into the existing sewage network. The total length of the network planned to be made will be 8762 m, of which the gravitational drainage network is 4691.5 m, the drainage drainage network is 164.5 m, and the gravitational channel is 3924 m, while the pressure canals are 18.0 m. The project is also beneficial due to the environmental objectives of reducing pollution of surface and underground water and improving the quality of life of residents. The sewage will be discharged to the existing sewage treatment plant at ul. Downhills in the Big Door. Due to the terrain and to avoid significant drainage of the sanitary system, 3 sewage pumping plants were used at the street. It’s a frog. The project will also modernise the water supply network through the replacement of 130 water meters, for water meters with radio reading pads, as well as a mobile device to measure the quality of sewage. (English)
    17 October 2020
    0 references

    Identifiers

    RPLU.06.04.00-06-0062/17
    0 references