Expansion and modernisation of the water supply system in the municipality of Podeze and Jabłoń (Q105673): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The extension and modernisation of the water supply system in the municipality of Podeze and Jabłoń assumes: (1) The modernisation of the water intake of the Pdeze water to the water station in Opole — the scope for modernisation of the water intake of “Podedwójniak” — parcels 40/1 and 41/1 covers the modernisation of the station building (renovation of interior and interior fittings, floor coverings, changes in internal and external installat...)
(‎Created claim: summary (P836): The expansion and modernisation of the water supply system in the municipality of Podedwór and Jabłoń assumes: (1) Modernisation of water intake The yard with a water supply station in Opole – scope of modernisation of water intake “Podedwórze” – plot 40/1 and 41/1 includes modernisation of the station building (renovation of linings and interior plasters, flooring, changes of internal and external installations, modernisation of the chlorine pl...)
Property / summary
 
The expansion and modernisation of the water supply system in the municipality of Podedwór and Jabłoń assumes: (1) Modernisation of water intake The yard with a water supply station in Opole – scope of modernisation of water intake “Podedwórze” – plot 40/1 and 41/1 includes modernisation of the station building (renovation of linings and interior plasters, flooring, changes of internal and external installations, modernisation of the chlorine plant) and the construction of water wells and access roads, as well as modernisation of technology with the replacement of technological pipelines and changing the management of plots and associated facilities. 2/2, 3, 4/1, 4/2, 27, 28, 29, 30.25, 152, (evid. The bridges). (3) Refurbishment and reconstruction of water intake and treatment stations in Jabłoń – the project includes the construction of a well, renovation of the water intake and treatment stations in Jabłoń on Dz. 2027, with a capacity of 48 m³/h. As part of the task, a set of photovoltaic cells at the water capture and treatment station in Jabłoń will be carried out, which will allow savings in operating costs (electric energy cost) (4) Water loss control system – measurement of pressure in the water network in Jabłoń – to reduce water loss on the grid – detection of failures as soon as possible, uncontrolled outflow will be made telemetry i.e. signalling of flow meters and sensors. (5) The water meter reading system in m. Jabłoń – in order to improve the readings from water meters of the amount of water taken, by customers with sanitary sewer connections, the installation of water meters together with modular overlays for radio reading of used water is provided. (English)
Property / summary: The expansion and modernisation of the water supply system in the municipality of Podedwór and Jabłoń assumes: (1) Modernisation of water intake The yard with a water supply station in Opole – scope of modernisation of water intake “Podedwórze” – plot 40/1 and 41/1 includes modernisation of the station building (renovation of linings and interior plasters, flooring, changes of internal and external installations, modernisation of the chlorine plant) and the construction of water wells and access roads, as well as modernisation of technology with the replacement of technological pipelines and changing the management of plots and associated facilities. 2/2, 3, 4/1, 4/2, 27, 28, 29, 30.25, 152, (evid. The bridges). (3) Refurbishment and reconstruction of water intake and treatment stations in Jabłoń – the project includes the construction of a well, renovation of the water intake and treatment stations in Jabłoń on Dz. 2027, with a capacity of 48 m³/h. As part of the task, a set of photovoltaic cells at the water capture and treatment station in Jabłoń will be carried out, which will allow savings in operating costs (electric energy cost) (4) Water loss control system – measurement of pressure in the water network in Jabłoń – to reduce water loss on the grid – detection of failures as soon as possible, uncontrolled outflow will be made telemetry i.e. signalling of flow meters and sensors. (5) The water meter reading system in m. Jabłoń – in order to improve the readings from water meters of the amount of water taken, by customers with sanitary sewer connections, the installation of water meters together with modular overlays for radio reading of used water is provided. (English) / rank
 
Normal rank
Property / summary: The expansion and modernisation of the water supply system in the municipality of Podedwór and Jabłoń assumes: (1) Modernisation of water intake The yard with a water supply station in Opole – scope of modernisation of water intake “Podedwórze” – plot 40/1 and 41/1 includes modernisation of the station building (renovation of linings and interior plasters, flooring, changes of internal and external installations, modernisation of the chlorine plant) and the construction of water wells and access roads, as well as modernisation of technology with the replacement of technological pipelines and changing the management of plots and associated facilities. 2/2, 3, 4/1, 4/2, 27, 28, 29, 30.25, 152, (evid. The bridges). (3) Refurbishment and reconstruction of water intake and treatment stations in Jabłoń – the project includes the construction of a well, renovation of the water intake and treatment stations in Jabłoń on Dz. 2027, with a capacity of 48 m³/h. As part of the task, a set of photovoltaic cells at the water capture and treatment station in Jabłoń will be carried out, which will allow savings in operating costs (electric energy cost) (4) Water loss control system – measurement of pressure in the water network in Jabłoń – to reduce water loss on the grid – detection of failures as soon as possible, uncontrolled outflow will be made telemetry i.e. signalling of flow meters and sensors. (5) The water meter reading system in m. Jabłoń – in order to improve the readings from water meters of the amount of water taken, by customers with sanitary sewer connections, the installation of water meters together with modular overlays for radio reading of used water is provided. (English) / qualifier
 
point in time: 17 October 2020
Timestamp+2020-10-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:54, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Expansion and modernisation of the water supply system in the municipality of Podeze and Jabłoń
Project in Poland financed by DG Regio

    Statements

    0 references
    1,637,011.02 zloty
    0 references
    392,882.64 Euro
    13 January 2020
    0 references
    1,925,895.34 zloty
    0 references
    462,214.88 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 October 2015
    0 references
    31 December 2018
    0 references
    GMINA PODEDWÓRZE
    0 references
    Rozbudowa i modernizacja sytemu zaopatrzenia w wodę w gminie Podedwórze i Jabłoń zakłada: (1) modernizację ujęcia wody Podedwórze ze stacją wodociągową w miejscowości Opole - zakres modernizacji ujęcia wody "PODEDWÓRZE" - działki 40/1 i 41/1 obejmuje modernizację budynku stacji (remont okładzin i tynków wewnętrznych, posadzek, zmiany instalacji wewnętrznych i zewnętrznych, modernizację chlorowni) oraz studni ujmujących wodę i drogi dojazdowej oraz modernizację technologii wraz z wymianą rurociągów technologicznych oraz zmianę zagospodarowania działki i obiektów towarzyszących.W ramach zadania wykonany zostanie zestaw ogniw fotowoltaicznych na stacji ujęcia i uzdatniania wody w miejscowości Podedwórze o mocy 2,0 kW, (2) budowę sieci wodociągowej w miejscowości Mosty - budowa sieci wodociągowej projektowana jest na odcinkach o łącznej długości 941,9 m , na działkach nr ewid. 2/2, 3, 4/1, 4/2, 27, 28, 29, 30,25,152, ( ewid. Mosty). (3) remont i przebudowa stacji ujęcia i uzdatniania wody w miejscowości Jabłoń - przedsięwzięcie obejmuje budowę studni, remont stacji ujęcia i uzdatniania wody w Jabłoniu na dz. nr ewid. 2027, o wydajności 48m3/h. W ramach zadania wykonany zostanie zestaw ogniw fotowoltaicznych na stacji ujęcia i uzdatniania wody w miejscowości Jabłoń które pozwolą na oszczędności w kosztach eksploatacyjnych ( koszt energii elektrycznej) (4) System kontroli strat wody - pomiaru ciśnienia w sieci wodociągowej w m. Jabłoń - do zmniejszenia strat wody na sieci - wykrycia jak najszybciej awarii, niekontrolowanego wypływu zostanie wykonana telemetria tj. zamontowane przepływomierze oraz czujniki ciśnienia z przekazaniem sygnału do stacji dyspozytorskiej w budynku SUW. (5) System odczytu wodomierzy w m. Jabłoń - dla usprawnienia odczytów z wodomierzy ilości pobranej wody, przez odbiorców posiadających przyłącza kanalizacji sanitarnej przewidziano montaż wodomierzy wraz z nakładkami modułowymi umożliwiający radiowy odczyt zużytej wody. (Polish)
    0 references
    The expansion and modernisation of the water supply system in the municipality of Podedwór and Jabłoń assumes: (1) Modernisation of water intake The yard with a water supply station in Opole – scope of modernisation of water intake “Podedwórze” – plot 40/1 and 41/1 includes modernisation of the station building (renovation of linings and interior plasters, flooring, changes of internal and external installations, modernisation of the chlorine plant) and the construction of water wells and access roads, as well as modernisation of technology with the replacement of technological pipelines and changing the management of plots and associated facilities. 2/2, 3, 4/1, 4/2, 27, 28, 29, 30.25, 152, (evid. The bridges). (3) Refurbishment and reconstruction of water intake and treatment stations in Jabłoń – the project includes the construction of a well, renovation of the water intake and treatment stations in Jabłoń on Dz. 2027, with a capacity of 48 m³/h. As part of the task, a set of photovoltaic cells at the water capture and treatment station in Jabłoń will be carried out, which will allow savings in operating costs (electric energy cost) (4) Water loss control system – measurement of pressure in the water network in Jabłoń – to reduce water loss on the grid – detection of failures as soon as possible, uncontrolled outflow will be made telemetry i.e. signalling of flow meters and sensors. (5) The water meter reading system in m. Jabłoń – in order to improve the readings from water meters of the amount of water taken, by customers with sanitary sewer connections, the installation of water meters together with modular overlays for radio reading of used water is provided. (English)
    17 October 2020
    0 references

    Identifiers

    RPLU.06.04.00-06-0056/15
    0 references