CONSTRUCTION OF THE SANITARY SEWERAGE IN THE BLACK SEA — STAGE IV (Q105606): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Removed claim: summary (P836): By increasing the number of people who are connected to the extended health and sanitation network, it will increase the availability and efficiency of the wastewater collection system and improve the quality of service in the Gm environment, improve and protect the natural status of water and soil, protect human health in the site and bring the wastewater into line with the environmental requirements of Poland and the EU. A larger number of t...)
Property / summary
By increasing the number of people who are connected to the extended health and sanitation network, it will increase the availability and efficiency of the wastewater collection system and improve the quality of service in the Gm environment, improve and protect the natural status of water and soil, protect human health in the site and bring the wastewater into line with the environmental requirements of Poland and the EU. A larger number of the home will be available from the constructed network and the services provided will be increased and extended (eBOK, purchase of water meters with a radio reading function, purchase of equipment to measure the quantity and quality of wastewater treatment.). The proportion of population using wastewater treatment will increase from 27.2 % to around 37.2 %. The increase in connections to the network and sanitary networks on the site will provide better access to these services and will therefore help to bridge the gaps in access to infrastructure. The construction of a network of sandeels and sanit for gravity — pressure combined in m. Sz. will be constructed of the techn of narrow spatial trenches with the exception of the sections performed, and will include the following: Hand, bod and Sadov on a section of 3 736.5 m. Clinker, Gorjska, Forrapolska, Sas Jaworska, Upper Solar, on a section of 1 617.0 m. Lubelska, over a distance of 1 070 m. Hamlet, Nadzeczna on a section of 3 266.0 m. Product: Debt constructed kaniosnit.-9.68 km. Result: Anticipated number of people with improved sewage treatment — 1100 persons. Number of additional applications of improved treatment of waste water (CI19) -1050. Heads of staff: staff of UMSz, staff of the ZMSz in Sana’a; WML, Dep. The implementation of the ERDF in the Woj. And/or., contractor inCs., Insp. monitoring., Advisory Bodies. Secondary Interest: inhabitants benefiting from the solutions by Proj, the other inhabitants of GSZ; persons not covered by the Gm WWTP; other functional rooms in Gm. Context: Competing for the measures in the context of the contest, local media. (English)
 
Property / summary: By increasing the number of people who are connected to the extended health and sanitation network, it will increase the availability and efficiency of the wastewater collection system and improve the quality of service in the Gm environment, improve and protect the natural status of water and soil, protect human health in the site and bring the wastewater into line with the environmental requirements of Poland and the EU. A larger number of the home will be available from the constructed network and the services provided will be increased and extended (eBOK, purchase of water meters with a radio reading function, purchase of equipment to measure the quantity and quality of wastewater treatment.). The proportion of population using wastewater treatment will increase from 27.2 % to around 37.2 %. The increase in connections to the network and sanitary networks on the site will provide better access to these services and will therefore help to bridge the gaps in access to infrastructure. The construction of a network of sandeels and sanit for gravity — pressure combined in m. Sz. will be constructed of the techn of narrow spatial trenches with the exception of the sections performed, and will include the following: Hand, bod and Sadov on a section of 3 736.5 m. Clinker, Gorjska, Forrapolska, Sas Jaworska, Upper Solar, on a section of 1 617.0 m. Lubelska, over a distance of 1 070 m. Hamlet, Nadzeczna on a section of 3 266.0 m. Product: Debt constructed kaniosnit.-9.68 km. Result: Anticipated number of people with improved sewage treatment — 1100 persons. Number of additional applications of improved treatment of waste water (CI19) -1050. Heads of staff: staff of UMSz, staff of the ZMSz in Sana’a; WML, Dep. The implementation of the ERDF in the Woj. And/or., contractor inCs., Insp. monitoring., Advisory Bodies. Secondary Interest: inhabitants benefiting from the solutions by Proj, the other inhabitants of GSZ; persons not covered by the Gm WWTP; other functional rooms in Gm. Context: Competing for the measures in the context of the contest, local media. (English) / rank
Normal rank
 

Revision as of 16:43, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
CONSTRUCTION OF THE SANITARY SEWERAGE IN THE BLACK SEA — STAGE IV
Project in Poland financed by DG Regio

    Statements

    0 references
    3,694,898.5 zloty
    0 references
    886,775.64 Euro
    13 January 2020
    0 references
    5,795,919.23 zloty
    0 references
    1,391,020.62 Euro
    13 January 2020
    0 references
    63.75 percent
    0 references
    16 April 2018
    0 references
    30 September 2019
    0 references
    GMINA SZCZEBRZESZYN
    0 references
    P. poprzez zwiększenie ilości osób podłączonych do rozbudowanej sieci kan. sanitarnej spowoduje zwiększenie dostępności i wydajności systemu odbioru ścieków oraz poprawę jakości obsługi w ramach gosp. ściekowej na terenie Gm., poprawę i ochronę stanu środ. natur. czystości wód i gleby, ochrony zdrowia ludzkiego na terenie gm. i dostosowanie gosp. ściekowej do wymagań środowiskowych Polski i UE. Z wybudowanej sieci będzie mogła skorzystać większa liczba gospod. dom., zaś poziom świadczonych usług zostanie zwiększony i rozszerzony (eBOK, zakup wodomierzy z funkcją radiowego odczytu, zakup urządzeń do pomiaru ilości i jakości ścieków oczyszcz.). Odsetek ludności korzystającej z oczysz. ścieków zwiększy się z 27,2% do ok. 37,2%. Wzrost il. podłączeń do sieci kana. sanitarnej na terenie gm. zapewni lepszy dostęp do tych usług, a tym samym doprowadzi do wyrównania różnic w dostępie do infrastruktury techn.. Budowa sieci kana. sanit. systemu mieszanego grawitacyjno - ciśnieniowego w m. Sz. zostanie wykonana techn. wykopów wąsko przestrzennych z wyjątkiem odcinków wykonywanych przewiertem i obejmie następujące ul.: Błonie, Boczna i Sadowa na odcinku 3736,5m. Klinowa, Gorajska, Frampolska, Sas Jaworskiej, Górna, Słoneczna na odcinku 1617,0m. Lubelska na odcinku 1070m. Zamojska, Nadrzeczna na odcinku 3266,0m . Wsk. produktu: Dług. wybudowanej kana. sanit.-9,68 km. Wsk. rezultatu: Przewidywana liczba os. korzystających z ulepszonego oczyszczania ścieków-1100 osób. Liczba dodatkowych os. korzystających z ulepszonego oczyszczania ścieków (CI19)-1050 os. Interesariusze głów.: pracownicy UMSz, pracownicy ZGK w Sz.; ZWL., Dep. Wdrażania EFRR UM Woj. Lub., wykonawcy inwes., Insp. nadzoru bud., Podmioty doradcze. Interes. drugorzędni: mieszkańcy bezpośr. korzystający z rozwiązań ramach proj., pozostali mieszkańcy GSz; osoby nie objęte systemem gosp. ściekowej Gm.; podm. gosp. funkcj. w Gm.. Interes. kontekstowi: Gm. konkurujące o środki w ramach przedm. konkursu, lokalne media. (Polish)
    0 references

    Identifiers

    RPLU.06.04.00-06-0019/17
    0 references