Collectors and biomass – “Renewable Energy Sources in Tarnogród Municipality – Stage II” (Q104741): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 1 language: remove_english_label) |
(Changed label, description and/or aliases in 1 language: translated_label) |
||
label / en | label / en | ||
Collectors and biomass – “Renewable Energy Sources in Tarnogród Municipality – Stage II” |
Revision as of 16:41, 17 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Collectors and biomass – “Renewable Energy Sources in Tarnogród Municipality – Stage II” |
Project in Poland financed by DG Regio |
Statements
2,373,573.14 zloty
0 references
2,792,439.0 zloty
0 references
85.0 percent
0 references
5 May 2016
0 references
15 December 2018
0 references
GMINA TARNOGRÓD
0 references
Celem głównym projektu jest ochrona środ natur poprzez zwiększenie wykorzystania energii ze źródeł odnawialnych (OZE). Rezult proj jest "Szacowany roczny spadek emisji gazów cieplarnianych (CI34)" - 519,11 tony ekwiwalentu CO2 / rok. Gł grupami docelowymi są mieszkańcy i turyści z terenu gminy (szczegółowy opis znajduje się w sw). Projekt przewiduje wykonanie 273 inst kolektorów słonecznych(łączna moc 1,28MW) (montowanych na budynkach oraz na posesjach) oraz 14 kotłów na biomasę(łączna moc 0,33MW). Dodatkowo w proj zaplanowano zadania towarzyszące (opracowanie sw, opracowanie dokument projekt i kosztorysu inwestor, wykonanie platformy internetowej zarządzającej energią w oparciu o technologię TIK oraz przeprowadz promocji poprzez ustawienie tablic, wykonanie broszur i informacje na stronie www. Analiza wybranego wariantu proj potwierdza trafność wyboru: - wariant przyczyniający się do realizacji celów proj- wariant przedstawiający najniższe nakłady - wariant najszybciej wykonalny z uwagi na najmniej skomplikowany charakter i ograniczenie spraw procedural do min - nieskomplikowany charakter war nie wymagania angażowania lub zatrudniania nowych osób - realizacja wariantu nie powoduje konieczności uzyskania dodatk pozwoleń - wariant najbardziej akceptowalny przez społeczność lokalną i władze gminy - Realwariantu na obszarze (OSI): 4. Obszary gosp wykorzystania walorów przyr i kult - proj wpisujący się w cele wszystkich dokument strateg. W Programie Ochrony Powietrza dla strefy lubel stwierdzone zostały ponadnormatywne poziomy szkodliwego pyłu zawieszonego w powietrzu (PM10). W skład pyłu zawieszonego mogą wchodzić substancje toksyczne m.in. benzo(a)piren. W związku z powyższym planowana inwest polegająca na zmniejszeniu emisji szkodliw substan do środ zgodna jest z POP. (Polish)
0 references
The main objective of the project is to protect nature by increasing the use of renewable energies (RES). The result of the project is “An estimated annual reduction in greenhouse gas emissions (CI34)” – 519.11 tonnes of CO2 equivalent/year. The main target groups are residents and tourists from the commune (detailed description can be found in sw). The project envisages the production of 273 inst solar collectors (total power of 1.28 MW) (mounted on buildings and on premises) and 14 biomass boilers (total power of 0.33 MW). In addition, the project includes accompanying tasks (developing sw, drafting a project document and costing the investor, creating an online platform managing energy based on ICT technology and carrying out promotions by setting up tables, making brochures and information on the website. Analysis of the selected project option confirms the accuracy of the choice: — Option contributing to the project objectives – the lowest effort option – the fastest feasible option due to the least complicated nature and the limitation of procedural cases to mines – the simple nature of the war not requiring the involvement or hiring of new people – implementation of the option does not result in the need for additional permits – the option most acceptable by the local community and the local authorities – Realvariant in the area (OSI): 4. Areas of gossip using the value of voodoo and cult – a project that fits into the objectives of all the strategist document. The Air Protection Programme for the Lubel zone identified supranormative levels of harmful particulate matter in the air (PM10). Particulate matter may include toxic substances such as benzo(a)pyrene. Therefore, the planned investment to reduce emissions of the harmful substance by Wednesday is in line with the POP. (English)
17 October 2020
0 references
Identifiers
RPLU.04.01.00-06-0144/16
0 references