Thermal renovation of a multi-family building at ul. Guerrilla 8 in Zamość (Q105500): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The scope of the work in question is the thermo-modernisation of a multi-family building at ul. Partisans 8 in Zamość — scope of work: — modernisation of the heating system — replacement of thermostatic valves, hydraulic adjustment of the installation (with regard to the number of radiators) — installation of cost allocators assembly, — implementation of a system for measuring, monitoring and managing the use of energy in the building, — insul...)
(‎Created claim: summary (P836): The scope of the project’s work includes – Thermomodernisation of the multi-family building at ul. Partisans 8 in Zamość – scope of work: — modernisation of central heating installations – replacement of thermostatic valves, hydraulic regulation of the installation (in relation to the number of radiators) – installation of cost-sharing, – implementation of a system of measurement, monitoring and management of energy use in the building, – warmin...)
Property / summary
 
The scope of the project’s work includes – Thermomodernisation of the multi-family building at ul. Partisans 8 in Zamość – scope of work: — modernisation of central heating installations – replacement of thermostatic valves, hydraulic regulation of the installation (in relation to the number of radiators) – installation of cost-sharing, – implementation of a system of measurement, monitoring and management of energy use in the building, – warming of ceilings – inflating mineral wool granules – d = 25 cm; is it L? 0,043 W/m×K – wall warming – ETICS system – Styrofoam d = 14 cm; is it L? 0,033 W/m×K, – additional works: insulation of cellar walls, replacement of windows in the basement, modernisation of balconies and roofs, – photovoltaic installation The following indicators will be achieved within p. Of the product: Number of energy-upgraded buildings – 1; Usable area of thermally upgraded buildings – 822,38 m²; Result: The amount of thermal energy saved – 444,40GJ/year; Additional generation capacity from renewable sources (CI30) – 0,001 MW; Estimated annual reduction in greenhouse gas emissions (CI34) – 34.05 tonnes/year. The target group is the residents of the property. The project concerns only the residential part. The planned photovoltaic installation is fully dedicated to the energy needs of the facility, and only the unused part of the electricity will be transferred to the distribution network. The project tackles energy poverty (includes elderly and single people, reduces the cost of housing (energy bills) in relation to the income received, and increases funds for other basic needs). This facility is not included in the register of monuments. The building is located in the area covered by MPZP. (English)
Property / summary: The scope of the project’s work includes – Thermomodernisation of the multi-family building at ul. Partisans 8 in Zamość – scope of work: — modernisation of central heating installations – replacement of thermostatic valves, hydraulic regulation of the installation (in relation to the number of radiators) – installation of cost-sharing, – implementation of a system of measurement, monitoring and management of energy use in the building, – warming of ceilings – inflating mineral wool granules – d = 25 cm; is it L? 0,043 W/m×K – wall warming – ETICS system – Styrofoam d = 14 cm; is it L? 0,033 W/m×K, – additional works: insulation of cellar walls, replacement of windows in the basement, modernisation of balconies and roofs, – photovoltaic installation The following indicators will be achieved within p. Of the product: Number of energy-upgraded buildings – 1; Usable area of thermally upgraded buildings – 822,38 m²; Result: The amount of thermal energy saved – 444,40GJ/year; Additional generation capacity from renewable sources (CI30) – 0,001 MW; Estimated annual reduction in greenhouse gas emissions (CI34) – 34.05 tonnes/year. The target group is the residents of the property. The project concerns only the residential part. The planned photovoltaic installation is fully dedicated to the energy needs of the facility, and only the unused part of the electricity will be transferred to the distribution network. The project tackles energy poverty (includes elderly and single people, reduces the cost of housing (energy bills) in relation to the income received, and increases funds for other basic needs). This facility is not included in the register of monuments. The building is located in the area covered by MPZP. (English) / rank
 
Normal rank
Property / summary: The scope of the project’s work includes – Thermomodernisation of the multi-family building at ul. Partisans 8 in Zamość – scope of work: — modernisation of central heating installations – replacement of thermostatic valves, hydraulic regulation of the installation (in relation to the number of radiators) – installation of cost-sharing, – implementation of a system of measurement, monitoring and management of energy use in the building, – warming of ceilings – inflating mineral wool granules – d = 25 cm; is it L? 0,043 W/m×K – wall warming – ETICS system – Styrofoam d = 14 cm; is it L? 0,033 W/m×K, – additional works: insulation of cellar walls, replacement of windows in the basement, modernisation of balconies and roofs, – photovoltaic installation The following indicators will be achieved within p. Of the product: Number of energy-upgraded buildings – 1; Usable area of thermally upgraded buildings – 822,38 m²; Result: The amount of thermal energy saved – 444,40GJ/year; Additional generation capacity from renewable sources (CI30) – 0,001 MW; Estimated annual reduction in greenhouse gas emissions (CI34) – 34.05 tonnes/year. The target group is the residents of the property. The project concerns only the residential part. The planned photovoltaic installation is fully dedicated to the energy needs of the facility, and only the unused part of the electricity will be transferred to the distribution network. The project tackles energy poverty (includes elderly and single people, reduces the cost of housing (energy bills) in relation to the income received, and increases funds for other basic needs). This facility is not included in the register of monuments. The building is located in the area covered by MPZP. (English) / qualifier
 
point in time: 17 October 2020
Timestamp+2020-10-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:38, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal renovation of a multi-family building at ul. Guerrilla 8 in Zamość
Project in Poland financed by DG Regio

    Statements

    0 references
    366,907.6 zloty
    0 references
    88,057.82 Euro
    13 January 2020
    0 references
    431,656.0 zloty
    0 references
    103,597.44 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 July 2020
    0 references
    31 October 2021
    0 references
    WSPÓLNOTA MIESZKANIOWA NIERUCHOMOŚCI UL.PARTYZANTÓW 8 W ZAMOŚCIU
    0 references
    0 references
    Zakres prac przedmiotowego projektu obejmuje - termomodernizację Budynku wielorodzinnego przy ul. Partyzantów 8 w Zamościu - zakres prac.: - modernizacja instalacji c.o. - wymiana zaworów termostatycznych, regulacja hydrauliczna instalacji (w odniesieniu do liczby grzejników) - montaż podzielników kosztów, - wdrożenie systemu pomiaru, monitoringu i zarządzania wykorzystaniem energii w budynku, - docieplenie stropodachu - wdmuchiwanie granulatu wełny mineralnej - d = 25 cm; l ? 0,043 W/m×K - docieplenie ścian - system ETICS - styropian d = 14 cm; l ? 0,033 W/m×K, - roboty dodatkowe: docieplenie ścian piwnic, wymiana okien w piwnicy, modernizacja balkonów i daszków, - instalacja fotowoltaiczna W ramach p. zostaną osiągnięte następujące wskaźniki: Produktu: Liczba zmodernizowanych energetycznie budynków - 1; Powierzchnia użytkowa budynków poddanych termomodernizacji - 822,38 m2; Rezultatu: Ilość zaoszczędzonej energii cieplnej - 444,40GJ/rok; Dodatkowa zdolność wytwarzania energii ze źródeł odnawialnych (CI30) - 0,001 MW; Szacowany roczny spadek emisji gazów cieplarnianych (CI34) - 34,05 ton/rok. GRUPĄ DOCELOWĄ są mieszkańcy przedmiotowej nieruchomości. Projekt dotyczy wyłącznie części mieszkaniowej. Planowana instalacja fotowoltaiczna jest w pełni dedykowana potrzebom energetycznym obiektu, a jedynie niewykorzystana część energii elektrycznej będzie oddawana do sieci dystrybucyjnej. Projekt przeciwdziała ubóstwu energetycznemu (obejmuje osoby starsze i samotne, zmniejsza nakłady na utrzymanie mieszkania (rachunki za energię) w stosunku do otrzymywanych dochodów ty samym zwiększa środki na inne potrzeby podstawowe). Przedmiotowy obiekt nie jest wpisany do rejestru zabytków. Budynek znajduje się na obszarze objętym MPZP. (Polish)
    0 references
    The scope of the project’s work includes – Thermomodernisation of the multi-family building at ul. Partisans 8 in Zamość – scope of work: — modernisation of central heating installations – replacement of thermostatic valves, hydraulic regulation of the installation (in relation to the number of radiators) – installation of cost-sharing, – implementation of a system of measurement, monitoring and management of energy use in the building, – warming of ceilings – inflating mineral wool granules – d = 25 cm; is it L? 0,043 W/m×K – wall warming – ETICS system – Styrofoam d = 14 cm; is it L? 0,033 W/m×K, – additional works: insulation of cellar walls, replacement of windows in the basement, modernisation of balconies and roofs, – photovoltaic installation The following indicators will be achieved within p. Of the product: Number of energy-upgraded buildings – 1; Usable area of thermally upgraded buildings – 822,38 m²; Result: The amount of thermal energy saved – 444,40GJ/year; Additional generation capacity from renewable sources (CI30) – 0,001 MW; Estimated annual reduction in greenhouse gas emissions (CI34) – 34.05 tonnes/year. The target group is the residents of the property. The project concerns only the residential part. The planned photovoltaic installation is fully dedicated to the energy needs of the facility, and only the unused part of the electricity will be transferred to the distribution network. The project tackles energy poverty (includes elderly and single people, reduces the cost of housing (energy bills) in relation to the income received, and increases funds for other basic needs). This facility is not included in the register of monuments. The building is located in the area covered by MPZP. (English)
    17 October 2020
    0 references

    Identifiers

    RPLU.05.03.00-06-0022/19
    0 references