Q101988 (Q101988): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): THE DIRECT OBJECTIVE OF THE PROJECT IS TO BUILD STREET LIGHTING IN BUKOWC USING ENERGY-SAVING AND ECOLOGICAL EQUIPMENT (LED STREET LUMINAIRES). THE CONSTRUCTION OF THE ABOVEMENTIONED INFRASTRUCTURE WILL CONTRIBUTE TO THE IMPROVEMENT OF AIR QUALITY IN THE MUNICIPALITY AND THE ENTIRE ŁÓDZK REGION, AND WILL ALSO CONTRIBUTE TO THE REDUCTION OF PUBLIC SECTOR ENERGY DEMAND. THE INDIRECT (SPECIFIC) OBJECTIVES OF THE PROJECT WILL BE: • INCREASING THE AR...)
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
label / enlabel / en
Construction of street lighting in Bukowcu

Revision as of 16:07, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Poland financed by DG Regio

    Statements

    0 references
    408,900.45 zloty
    0 references
    98,136.11 Euro
    13 January 2020
    0 references
    528,500.0 zloty
    0 references
    126,840.0 Euro
    13 January 2020
    0 references
    77.37 percent
    0 references
    1 October 2017
    0 references
    30 September 2018
    0 references
    GMINA BRÓJCE
    0 references
    0 references

    51°39'59.0"N, 19°38'13.6"E
    0 references
    CELEM BEZPOŚREDNIM PROJEKTU JEST BUDOWA OŚWIETLENIA ULICZNEGO W BUKOWCU Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH I EKOLOGICZNYCH (LEDOWE OPRAWY ULICZNE). BUDOWA W/W INFRASTRUKTURY PRZYCZYNI SIĘ DO POPRAWY JAKOŚCI POWIETRZA NA TERENIE GMINY ORAZ CAŁEGO REGIONU ŁÓDZK., A TAKŻE PRZYCZYNI SIĘ DO ZMNIEJSZENIA ZAPOTRZEBOWANIA NA ENERGIĘ SEKTORA PUBLICZNEGO. CELAMI POŚREDNIMI (SZCZEGÓŁOWYMI) PROJEKTU BĘDĄ: • ZWIĘKSZENIE OBSZARU WOJEW. I KRAJU, NA KTÓRYM POPRAWIE ULEGNIE STAN POWIETRZA, • ZWIĘKSZENIE ŚWIADOMOŚCI SPOŁECZ. W ZAKRESIE OCHRONY ŚROD. W TYM W SZCZEGÓLNOŚCI POWIETRZA, • ZMNIEJSZENIE KOSZTÓW EKSPLOATACYJNYCH OŚWIETLENIA ULICZNEGO W PORÓWNANIU DO BUDOWY W SYSTEMIE TRADYCYJNYM, • ZMNIEJSZENIE ENERGOCHŁONNOŚCI SEKTORA PUBLI., • ZWIĘKSZENIE KOMFORTU ŻYCIA MIESZKAŃCÓW GMINY, • ZWIĘKSZENIE BEZPIECZEŃSTWA MIESZKAŃCÓW GMINY, • POPRAWA WYPOSAŻENIA W INFRASTRUKTURĘ UŻYTECZNOŚCI PUBLI. GMINY, • ZMNIEJSZENIE EMISJI ZANIECZYSZCZEŃ (W TYM CO2). CELEM ZAPEWNIENIA BEZKOLIZYJNEGO PROWADZENIA BUDOWY, KOLEJNOŚĆ WYKONYWANIA ROBÓT BĘDZIE NASTĘPUJĄCA: 1. ZŁĄCZA KABLOWE-KOSZTY KWALIF. GMINA WYKONUJE 8 ZŁĄCZY W SZAFKACH OŚWIETLENIA ULICZNEGO. W RAMACH ODRĘBNEGO OPRACOWANIA - KOSZT REALIZACJI PONOSI PGE DYSTRYBUCJA SA, POZA PROJEKTEM GMINY BUDOWANE SĄ I WYMIENIANE ZŁĄCZA W STACJACH TRANSFORMATOROWYCH. GMINA PONOSI JEDYNIE KOSZT MONTAŻU KABLA OD ZŁĄCZA PGE DO SZAFEK OŚWIETLENIA ULICZNEGO. TAKI ZABIEG JEST KONIECZNY ABY WPIĄĆ PROJEKTOWANE OŚWIETLENIE W ISTNIEJĄCE I ZAPEWNIĆ PRZEPŁYW ENERGII, 2. BUDOWA ROZDZIELNI OŚWIETLENIA ULIC, 3. BUDOWA LINII KABLOWEJ, 4. BUDOWA SŁUPÓW OŚWIETLENIA, 5. MONTAŻ OPRAW OŚWIETLENIA, 6. PODŁĄCZENIE PRZEWODÓW, 7. WYKONANIE POMIARÓW, 8. UPORZĄDKOWANIE TERENU. POTENCJALNYMI UŻYTKOWNIKAMI PROJEKTU BĘDĄ WSZYSCY MIESZKAŃCY GMINY BRÓJCE (W ROKU 2015 R. - ZAMIESZKIWAŁO 6 390 OS) ZE SZCZEGÓLNYM WSKAZANIEM MIESZKAŃCÓW MIEJSCOWOŚCI BUKOWIEC ORAZ POTENCJALNI NOWI MIESZKAŃCY GMINY. (Polish)
    0 references
    THE DIRECT OBJECTIVE OF THE PROJECT IS TO BUILD STREET LIGHTING IN BUKOWC USING ENERGY-SAVING AND ECOLOGICAL EQUIPMENT (LED STREET LUMINAIRES). THE CONSTRUCTION OF THE ABOVEMENTIONED INFRASTRUCTURE WILL CONTRIBUTE TO THE IMPROVEMENT OF AIR QUALITY IN THE MUNICIPALITY AND THE ENTIRE ŁÓDZK REGION, AND WILL ALSO CONTRIBUTE TO THE REDUCTION OF PUBLIC SECTOR ENERGY DEMAND. THE INDIRECT (SPECIFIC) OBJECTIVES OF THE PROJECT WILL BE: • INCREASING THE AREA OF VOIVODSHIPS. AND THE COUNTRY WHERE THE AIR CONDITION WILL IMPROVE, • INCREASE PUBLIC AWARENESS. FOR THE PROTECTION OF WEDNESDAYS. IN PARTICULAR, AIR, • REDUCTION OF OPERATING COSTS OF STREET LIGHTING COMPARED TO CONSTRUCTION IN THE TRADITIONAL SYSTEM, • DECREASE THE ENERGY INTENSITY OF THE PUBLI SECTOR., • INCREASE THE COMFORT OF THE RESIDENTS OF THE COMMUNE, • INCREASE SAFETY OF RESIDENTS OF THE MUNICIPALITY, • IMPROVEMENT OF EQUIPMENT WITH THE INFRASTRUCTURE OF UTILITY PUBS. MUNICIPALITIES, • REDUCTION OF POLLUTANT EMISSIONS (INCLUDING CO2). IN ORDER TO ENSURE THAT CONSTRUCTION WORKS ARE CARRIED OUT WITHOUT COLLISION, THE ORDER OF EXECUTION OF THE WORKS SHALL BE AS FOLLOWS: 1. CABLE CONNECTORS-KWALIF COSTS. THE MUNICIPALITY MAKES 8 CONNECTORS IN STREET LIGHTING CABINETS. AS PART OF A SEPARATE STUDY – THE COST OF IMPLEMENTATION IS BORNE BY PGE DISTRIBUTION SA, APART FROM THE PROJECT OF THE COMMUNE, CONNECTORS ARE BUILT AND REPLACED IN TRANSFORMER STATIONS. THE MUNICIPALITY ONLY BEARS THE COST OF INSTALLING THE CABLE FROM THE PGE CONNECTOR TO THE STREET LIGHTING CABINETS. SUCH A TREATMENT IS NECESSARY TO PLUG THE DESIGNED LIGHTING INTO EXISTING AND ENSURE THE FLOW OF ENERGY, 2. CONSTRUCTION OF A STREET LIGHTING SWITCHBOARD, 3. CABLE LINE CONSTRUCTION, 4. CONSTRUCTION OF LIGHT POLES, 5. INSTALLATION OF LIGHTING LUMINAIRES, 6. WIRE CONNECTION, 7. TAKING MEASUREMENTS, 8. TIDY UP THE AREA. POTENTIAL USERS OF THE PROJECT WILL BE ALL RESIDENTS OF BRÓJCE COMMUNE (IN 2015 – HAD A POPULATION OF 6,390 OS) WITH A SPECIAL INDICATION OF THE INHABITANTS OF BUKOWIEC AND POTENTIAL NEW RESIDENTS OF THE COMMUNE. (English)
    17 October 2020
    0 references

    Identifiers

    RPLD.04.03.01-10-0002/17
    0 references