COMPREHENSIVE RENOVATION OF PUBLIC BUILDINGS FOR SPORT INFRASTRUCTURE (Q101889): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): THE PROJECT CONCERNS THE THERMO-MODERNISATION OF THE 2 PUBLIC BUILDINGS IN THE VICINITY OF A SWIMMING POOL AND A SPORTS HALL. THE PLANNED SCOPE OF WORK INCLUDES A SWIMMING POOL FOR THE MODERNISATION OF THE HOT WATER HEATING SYSTEM FOR THE SWIMMING POOL. THE PROJECT WILL CONTRIBUTE TO THE COST SAVINGS OF THE THERMAL ENERGY IN THE POOL, THE COST SAVINGS OF THE HEAT IN THE ARENA, ANNUAL SAVINGS OF DEMAND FOR NON-RENEWABLE PRIMARY ENERGY IN THE BA...)
(‎Created claim: summary (P836): THE PROJECT CONCERNS THE THERMAL MODERNISATION OF 2 PUBLIC BUILDINGS IN THE OZORKÓW AREA OF THE SWIMMING POOL AND SPORTS HALL. THE PLANNED SCOPE OF WORKS INCLUDES A SWIMMING POOL MODERNISATION OF THE C.W.U. PREPARATION SYSTEM FOR HEATING POOL WATER REPLACEMENT OF OUTDOOR CARPENTRY. THE PROJECT WILL CONTRIBUTE TO SAVING THE COSTS OF THERMAL ENERGY IN THE POOL FACILITY, SAVING THE COSTS OF THERMAL ENERGY IN THE HALL, ANNUAL SAVING OF THE NEED FOR...)
Property / summary
 
THE PROJECT CONCERNS THE THERMAL MODERNISATION OF 2 PUBLIC BUILDINGS IN THE OZORKÓW AREA OF THE SWIMMING POOL AND SPORTS HALL. THE PLANNED SCOPE OF WORKS INCLUDES A SWIMMING POOL MODERNISATION OF THE C.W.U. PREPARATION SYSTEM FOR HEATING POOL WATER REPLACEMENT OF OUTDOOR CARPENTRY. THE PROJECT WILL CONTRIBUTE TO SAVING THE COSTS OF THERMAL ENERGY IN THE POOL FACILITY, SAVING THE COSTS OF THERMAL ENERGY IN THE HALL, ANNUAL SAVING OF THE NEED FOR NON-RENEWABLE PRIMARY ENERGY IN THE POOL FACILITY OF MORE THAN 25 %, ANNUAL SAVING OF THE NEED FOR NON-RENEWABLE PRIMARY ENERGY IN THE HALL OF OVER 25 %. SPORTS HALL MODERNISATION OF HEATING SYSTEM, MODERNISATION OF THE C.W.U. PREPARATION SYSTEM, MECHANICAL VENTILATION SYSTEM WITH RECUPERATION, REPLACEMENT OF ROOF STRUCTURE WITH THERMAL INSULATION ASSEMBLY, INSULATION OF EXTERNAL WALLS, MODERNISATION OF INTERNAL ELECTRICAL SYSTEM, LIGHTNING INSTALLATION, INSTALLATION OF PHOTOVOLTAIC PANELS, TRANSPORT AND DISPOSAL OF ASBESTOS PANELS FROM THE ROOF OF THE BUILDING. THE TASKS ENVISAGED: 1 PROJECT PREPARATION 2 CONSTRUCTION WORKS 3 PROJECT MANAGEMENT AND ITS USER SUPPORT ARE MAINLY RESIDENTS OF THE TOWN OF OZORKÓW, THE MUNICIPALITY OF OZORKÓW. THE MAIN OBJECTIVE OF THE PROJECT IS TO IMPROVE ENERGY EFFICIENCY IN THE MUNICIPALITY THROUGH THERMO-MODERNISATION MEASURES AIMED AT PROTECTING, REDUCING GREENHOUSE GAS EMISSIONS AND INCREASING THE USE OF RENEWABLE ENERGY SOURCES THANKS TO ITS IMPLEMENTATION, THE NUMBER OF ENERGY-MODERNISED BUILDINGS OF 2 PIECES WILL BE ACHIEVED. USABLE AREA OF BUILDINGS UNDERGOING THERMAL UPGRADES 2 782.40 M2 REDUCES ANNUAL PRIMARY ENERGY CONSUMPTION IN PUBLIC BUILDINGS (CO32) 743 734,09 KWH/YEAR ESTIMATED ANNUAL DECREASE IN GREENHOUSE GAS EMISSIONS (CO34) 101.28 T CO2/ROK EQUIVALENT AMOUNT OF THERMAL ENERGY SAVINGS 703.19 GJ/YEAR DECREASE IN FINAL ENERGY CONSUMPTION AS A RESULT OF PROJECTS 1029.27 GJ/YEAR (English)
Property / summary: THE PROJECT CONCERNS THE THERMAL MODERNISATION OF 2 PUBLIC BUILDINGS IN THE OZORKÓW AREA OF THE SWIMMING POOL AND SPORTS HALL. THE PLANNED SCOPE OF WORKS INCLUDES A SWIMMING POOL MODERNISATION OF THE C.W.U. PREPARATION SYSTEM FOR HEATING POOL WATER REPLACEMENT OF OUTDOOR CARPENTRY. THE PROJECT WILL CONTRIBUTE TO SAVING THE COSTS OF THERMAL ENERGY IN THE POOL FACILITY, SAVING THE COSTS OF THERMAL ENERGY IN THE HALL, ANNUAL SAVING OF THE NEED FOR NON-RENEWABLE PRIMARY ENERGY IN THE POOL FACILITY OF MORE THAN 25 %, ANNUAL SAVING OF THE NEED FOR NON-RENEWABLE PRIMARY ENERGY IN THE HALL OF OVER 25 %. SPORTS HALL MODERNISATION OF HEATING SYSTEM, MODERNISATION OF THE C.W.U. PREPARATION SYSTEM, MECHANICAL VENTILATION SYSTEM WITH RECUPERATION, REPLACEMENT OF ROOF STRUCTURE WITH THERMAL INSULATION ASSEMBLY, INSULATION OF EXTERNAL WALLS, MODERNISATION OF INTERNAL ELECTRICAL SYSTEM, LIGHTNING INSTALLATION, INSTALLATION OF PHOTOVOLTAIC PANELS, TRANSPORT AND DISPOSAL OF ASBESTOS PANELS FROM THE ROOF OF THE BUILDING. THE TASKS ENVISAGED: 1 PROJECT PREPARATION 2 CONSTRUCTION WORKS 3 PROJECT MANAGEMENT AND ITS USER SUPPORT ARE MAINLY RESIDENTS OF THE TOWN OF OZORKÓW, THE MUNICIPALITY OF OZORKÓW. THE MAIN OBJECTIVE OF THE PROJECT IS TO IMPROVE ENERGY EFFICIENCY IN THE MUNICIPALITY THROUGH THERMO-MODERNISATION MEASURES AIMED AT PROTECTING, REDUCING GREENHOUSE GAS EMISSIONS AND INCREASING THE USE OF RENEWABLE ENERGY SOURCES THANKS TO ITS IMPLEMENTATION, THE NUMBER OF ENERGY-MODERNISED BUILDINGS OF 2 PIECES WILL BE ACHIEVED. USABLE AREA OF BUILDINGS UNDERGOING THERMAL UPGRADES 2 782.40 M2 REDUCES ANNUAL PRIMARY ENERGY CONSUMPTION IN PUBLIC BUILDINGS (CO32) 743 734,09 KWH/YEAR ESTIMATED ANNUAL DECREASE IN GREENHOUSE GAS EMISSIONS (CO34) 101.28 T CO2/ROK EQUIVALENT AMOUNT OF THERMAL ENERGY SAVINGS 703.19 GJ/YEAR DECREASE IN FINAL ENERGY CONSUMPTION AS A RESULT OF PROJECTS 1029.27 GJ/YEAR (English) / rank
 
Normal rank
Property / summary: THE PROJECT CONCERNS THE THERMAL MODERNISATION OF 2 PUBLIC BUILDINGS IN THE OZORKÓW AREA OF THE SWIMMING POOL AND SPORTS HALL. THE PLANNED SCOPE OF WORKS INCLUDES A SWIMMING POOL MODERNISATION OF THE C.W.U. PREPARATION SYSTEM FOR HEATING POOL WATER REPLACEMENT OF OUTDOOR CARPENTRY. THE PROJECT WILL CONTRIBUTE TO SAVING THE COSTS OF THERMAL ENERGY IN THE POOL FACILITY, SAVING THE COSTS OF THERMAL ENERGY IN THE HALL, ANNUAL SAVING OF THE NEED FOR NON-RENEWABLE PRIMARY ENERGY IN THE POOL FACILITY OF MORE THAN 25 %, ANNUAL SAVING OF THE NEED FOR NON-RENEWABLE PRIMARY ENERGY IN THE HALL OF OVER 25 %. SPORTS HALL MODERNISATION OF HEATING SYSTEM, MODERNISATION OF THE C.W.U. PREPARATION SYSTEM, MECHANICAL VENTILATION SYSTEM WITH RECUPERATION, REPLACEMENT OF ROOF STRUCTURE WITH THERMAL INSULATION ASSEMBLY, INSULATION OF EXTERNAL WALLS, MODERNISATION OF INTERNAL ELECTRICAL SYSTEM, LIGHTNING INSTALLATION, INSTALLATION OF PHOTOVOLTAIC PANELS, TRANSPORT AND DISPOSAL OF ASBESTOS PANELS FROM THE ROOF OF THE BUILDING. THE TASKS ENVISAGED: 1 PROJECT PREPARATION 2 CONSTRUCTION WORKS 3 PROJECT MANAGEMENT AND ITS USER SUPPORT ARE MAINLY RESIDENTS OF THE TOWN OF OZORKÓW, THE MUNICIPALITY OF OZORKÓW. THE MAIN OBJECTIVE OF THE PROJECT IS TO IMPROVE ENERGY EFFICIENCY IN THE MUNICIPALITY THROUGH THERMO-MODERNISATION MEASURES AIMED AT PROTECTING, REDUCING GREENHOUSE GAS EMISSIONS AND INCREASING THE USE OF RENEWABLE ENERGY SOURCES THANKS TO ITS IMPLEMENTATION, THE NUMBER OF ENERGY-MODERNISED BUILDINGS OF 2 PIECES WILL BE ACHIEVED. USABLE AREA OF BUILDINGS UNDERGOING THERMAL UPGRADES 2 782.40 M2 REDUCES ANNUAL PRIMARY ENERGY CONSUMPTION IN PUBLIC BUILDINGS (CO32) 743 734,09 KWH/YEAR ESTIMATED ANNUAL DECREASE IN GREENHOUSE GAS EMISSIONS (CO34) 101.28 T CO2/ROK EQUIVALENT AMOUNT OF THERMAL ENERGY SAVINGS 703.19 GJ/YEAR DECREASE IN FINAL ENERGY CONSUMPTION AS A RESULT OF PROJECTS 1029.27 GJ/YEAR (English) / qualifier
 
point in time: 17 October 2020
Timestamp+2020-10-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:53, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
COMPREHENSIVE RENOVATION OF PUBLIC BUILDINGS FOR SPORT INFRASTRUCTURE
Project in Poland financed by DG Regio

    Statements

    0 references
    1,424,975.09 zloty
    0 references
    341,994.02 Euro
    13 January 2020
    0 references
    1,697,611.5 zloty
    0 references
    407,426.76 Euro
    13 January 2020
    0 references
    83.94 percent
    0 references
    14 June 2017
    0 references
    31 December 2020
    0 references
    GMINA MIASTO OZORKÓW
    0 references
    0 references

    51°57'31.7"N, 19°17'21.5"E
    0 references
    PROJEKT DOTYCZY TERMOMODERNIZACJI 2 BUDYNKÓW UŻYTECZNOŚCI PUBLICZNEJ NA TERENIE OZORKOWA BASENU I HALI SPORTOWEJ. PLANOWANY ZAKRES PRAC OBEJMUJE BASEN MODERNIZACJA SYSTEMU PRZYGOTOWANIA C.W.U. PODGRZEWU WODY BASENOWEJ WYMIANĘ STOLARKI ZEWNĘTRZNEJ. PROJEKT PRZYCZYNI SIĘ DO OSIĄGNIĘCIA OSZCZĘDNOŚCI KOSZTÓW ENERGII CIEPLNEJ W OBIEKCIE BASENU, OSZCZĘDNOŚCI KOSZTÓW ENERGII CIEPLNEJ W OBIEKCIE HALI, ROCZNE OSZCZĘDNOŚCI ZAPOTRZEBOWANIA NA NIEODNAWIALNĄ ENERGIĘ PIERWOTNĄ W OBIEKCIE BASENU POWYŻEJ 25%, ROCZNE OSZCZĘDNOŚCI ZAPOTRZEBOWANIA NA NIEODNAWIALNĄ ENERGIĘ PIERWOTNĄ W OBIEKCIE HALI POWYŻEJ 25%. HALA SPORTOWA MODERNIZACJA SYSTEMU GRZEWCZEGO, MODERNIZACJI SYSTEMU PRZYGOTOWANIA C.W.U., SYSTEM WENTYLACJI MECHANICZNEJ Z REKUPERACJĄ, WYMIANA KONSTRUKCJI DACHU WRAZ Z MONTAŻEM IZOLACJI TERMICZNEJ, DOCIEPLENIE ŚCIAN ZEWNĘTRZNYCH, MODERNIZACJĘ INSTALACJI ELEKTRYCZNEJ WEWNĘTRZNEJ, INSTALACJĘ ODGROMOWĄ, MONTAŻ PANELI FOTOWOLTAICZNYCH, TRANSPORT I UTYLIZACJA PŁYT AZBESTOWYCH Z DACHU BUDYNKU. PRZEWIDZIANE ZADANIA: 1 PRZYGOTOWANIE PROJEKTU 2 ROBOTY BUDOWLANE 3 ZARZĄDZANIE PROJEKTEM I JEGO OBSŁUGA UŻYTKOWNIKAMI SĄ GŁOWNIE MIESZKAŃCY MIASTA OZORÓW, GMINY OZORKÓW. GŁÓWNYM CELEM PROJEKTU JEST POPRAWA EFEKTYWNOŚCI ENERGETYCZNEJ NA TERENIE GMINY POPRZEZ DZIAŁANIA TERMOMODERNIZACYJNE ZMIERZAJĄCE DO OCHRONY, OGRANICZENIA EMISJI GAZÓW CIEPLARNIANYCH, WZROSTU WYKORZYSTANIA ODNAWIALNYCH ŹRÓDEŁ ENERGII DZIĘKI JEGO REALIZACJI ZOSTANĄ OSIĄGNIĘTE WSKAŹNIKI LICZBA ZMODERNIZOWANYCH ENERGETYCZNIE BUDYNKÓW 2 SZT. POWIERZCHNIA UŻYTKOWA BUDYNKÓW PODDANYCH TERMOMODERNIZACJI 2 782,40 M2 ZMNIEJSZENIE ROCZNEGO ZUŻYCIA ENERGII PIERWOTNEJ W BUDYNKACH PUBLICZNYCH (CO32) 743 734,09 KWH/ROK SZACOWANY ROCZNY SPADEK EMISJI GAZÓW CIEPLARNIANYCH (CO34) 101,28 T RÓWNOWAŻNIKA CO2/ROK ILOŚĆ ZAOSZCZĘDZONEJ ENERGII CIEPLNEJ 703,19 GJ/ROK ZMNIEJSZENIE ZUŻYCIA ENERGII KOŃCOWEJ W WYNIKU REALIZACJI PROJEKTÓW 1029,27 GJ/ROK (Polish)
    0 references
    THE PROJECT CONCERNS THE THERMAL MODERNISATION OF 2 PUBLIC BUILDINGS IN THE OZORKÓW AREA OF THE SWIMMING POOL AND SPORTS HALL. THE PLANNED SCOPE OF WORKS INCLUDES A SWIMMING POOL MODERNISATION OF THE C.W.U. PREPARATION SYSTEM FOR HEATING POOL WATER REPLACEMENT OF OUTDOOR CARPENTRY. THE PROJECT WILL CONTRIBUTE TO SAVING THE COSTS OF THERMAL ENERGY IN THE POOL FACILITY, SAVING THE COSTS OF THERMAL ENERGY IN THE HALL, ANNUAL SAVING OF THE NEED FOR NON-RENEWABLE PRIMARY ENERGY IN THE POOL FACILITY OF MORE THAN 25 %, ANNUAL SAVING OF THE NEED FOR NON-RENEWABLE PRIMARY ENERGY IN THE HALL OF OVER 25 %. SPORTS HALL MODERNISATION OF HEATING SYSTEM, MODERNISATION OF THE C.W.U. PREPARATION SYSTEM, MECHANICAL VENTILATION SYSTEM WITH RECUPERATION, REPLACEMENT OF ROOF STRUCTURE WITH THERMAL INSULATION ASSEMBLY, INSULATION OF EXTERNAL WALLS, MODERNISATION OF INTERNAL ELECTRICAL SYSTEM, LIGHTNING INSTALLATION, INSTALLATION OF PHOTOVOLTAIC PANELS, TRANSPORT AND DISPOSAL OF ASBESTOS PANELS FROM THE ROOF OF THE BUILDING. THE TASKS ENVISAGED: 1 PROJECT PREPARATION 2 CONSTRUCTION WORKS 3 PROJECT MANAGEMENT AND ITS USER SUPPORT ARE MAINLY RESIDENTS OF THE TOWN OF OZORKÓW, THE MUNICIPALITY OF OZORKÓW. THE MAIN OBJECTIVE OF THE PROJECT IS TO IMPROVE ENERGY EFFICIENCY IN THE MUNICIPALITY THROUGH THERMO-MODERNISATION MEASURES AIMED AT PROTECTING, REDUCING GREENHOUSE GAS EMISSIONS AND INCREASING THE USE OF RENEWABLE ENERGY SOURCES THANKS TO ITS IMPLEMENTATION, THE NUMBER OF ENERGY-MODERNISED BUILDINGS OF 2 PIECES WILL BE ACHIEVED. USABLE AREA OF BUILDINGS UNDERGOING THERMAL UPGRADES 2 782.40 M2 REDUCES ANNUAL PRIMARY ENERGY CONSUMPTION IN PUBLIC BUILDINGS (CO32) 743 734,09 KWH/YEAR ESTIMATED ANNUAL DECREASE IN GREENHOUSE GAS EMISSIONS (CO34) 101.28 T CO2/ROK EQUIVALENT AMOUNT OF THERMAL ENERGY SAVINGS 703.19 GJ/YEAR DECREASE IN FINAL ENERGY CONSUMPTION AS A RESULT OF PROJECTS 1029.27 GJ/YEAR (English)
    17 October 2020
    0 references

    Identifiers

    RPLD.04.02.01-10-0020/17
    0 references