INVESTMENT IN INFRASTRUCTURE FOR THE PRODUCTION OF ELECTRICITY FROM RENEWABLE ENERGY SOURCES IN BRENEN POLSKA (Q101849): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claim: summary (P836): The project entitled: “Investment in the infrastructure for the production of electricity from renewable sources at the firm Brenen Poland” refers to the investment in the construction of a solar installation, the total maximum installed capacity of which will be 39,48 kWp. The task will be carried out in the period from 01.02.2018 to 31.12.2018. In order to carry out the investment, an acquisition under Task 1 [Construction of a 39,48 kWp pho...) |
||
Property / summary | |||
Property / summary: The project entitled: “Investment in the infrastructure for the production of electricity from renewable sources at the firm Brenen Poland” refers to the investment in the construction of a solar installation, the total maximum installed capacity of which will be 39,48 kWp. The task will be carried out in the period from 01.02.2018 to 31.12.2018. In order to carry out the investment, an acquisition under Task 1 [Construction of a 39,48 kWp photovoltaic micro-installation “on-gird”, resulting in a durable medium, ‘on-grid’ photovoltaic installation, i.e. up to an electricity grid with a capacity of approximately 39,48 kWp. The installation will be installed on the roof of a building located at ul. 45 in Warta, in Warta, consisting of 141 mono-crystalline and wave panels, and outfitting and construction infrastructure, security features and cables. Installations and operations shall be composed of: configuration and Assembly. A complete and autonomous solar installation should ensure that the Applicant achieves at least the following benefits from the implementation of the investment: A PV generator (AC network) — achieving at least 36 755.88 kWh/year forecast annual profit — min. 931 kWh/kWp The performance ratio (PR) — min. 87 % CO2 emissions avoided — min. 22 582.56 kg/year Group target: Employees, counterparties and Firma BRENEN [direct users — energy for own account] and National electricity network [user with medium -average customer — recipient of surplus electricity]. (English) / rank | |||
Revision as of 15:51, 17 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | INVESTMENT IN INFRASTRUCTURE FOR THE PRODUCTION OF ELECTRICITY FROM RENEWABLE ENERGY SOURCES IN BRENEN POLSKA |
Project in Poland financed by DG Regio |
Statements
197,100.0 zloty
0 references
262,800.0 zloty
0 references
75.0 percent
0 references
1 February 2018
0 references
31 December 2018
0 references
BRENEN POLSKA HENRYK WŁODARCZYK
0 references
Projekt pn. „Inwestycja w infrastrukturę służącą do produkcji energii elektrycznej ze źródeł odnawialnych w firmie Brenen Polska” dotyczy inwestycji w zakresie budowy instalacji wykorzystującej energię słoneczną, której łączna maksymalna moc zainstalowana wynosiła będzie 39,48 kWp . Zadanie realizowane będzie w okresie od dnia 01.02.2018r. do dnia 31.12.2018r. W celu realizacji inwestycji koniecznej jest nabycie w ramach Zadania 1 [Budowa mikroinstalacji fotowoltaicznej „on-gird” o mocy 39,48 kWp usługi na roboty budowlane, w wyniku których powstanie środek trwały - instalacja fotowoltaiczna typu „on-grid”, tzn. wpięta do sieci elektroenergetycznej o mocy ok. 39,48 kWp. Instalacja będzie zamonto-wana na dachu budynku zlokalizowanego przy ul. Kaliskiej 45 w miejscowości Warta i składała się będzie ze 141 paneli monokrystalicznych i falowników oraz infrastruktury montażowo-konstrukcyjnej, zabezpieczeń i okablowania. Na instalacje i uruchomienie złożą się: konfiguracja oraz montaż. Kompletna i autonomiczna instalacja fotowoltaiczna zagwarantować powinna Wnioskodawcy osiągnięcie co najmniej następujących korzyści z wdrożenia inwestycji: Generator energii fotowoltaicznej (sieć AC) – osiągnięcie wydajności na poziomie min. 36.755,88 kWh/ rocznie Prognozowany zysk roczny – min. 931 kWh/kWp Stosunek wydajności (PR) – min. 87% Emisja CO2, której dało się uniknąć – min. 22.582,56kg/rok Grupy docelowe: Pracownicy, kontrahenci i Firma BRENEN [użytkownicy bezpośredni - energia na potrzeby własne] oraz Krajowa Sieć Elektroenergetyczna [użytkownik po-średni – odbiorca nadwyżek prądu]. (Polish)
0 references
Identifiers
RPLD.04.01.02-10-0214/16
0 references