RENEWABLE ENERGY SOURCES IN THE MUNICIPALITY OF PAJĘCZNO (Q101766): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The beneficiary (Leader) of the project is the Local Government. The partner of the project is pańczański. The main aim of the project is: increasing the production of energy from renewable sources and reducing the use of conventional energy sources in the town of Pasachno, and in the district of pańczne, resulting in an improvement in the state of the environment as a result of the reduction of emissions of pollutants into the atmosphere. The...)
(‎Created claim: summary (P836): The beneficiary (leader) of the project is the Local Government Unit – Pajęczno Municipality. The partner of the project is the spider county. The main objective of the project is to: increasing the production of renewable energy sources and reducing the use of conventional energy sources in the municipality of Pajęczno and in the spider county, resulting in improvements in the environment as a result of reducing emissions of pollutants into the...)
Property / summary
 
The beneficiary (leader) of the project is the Local Government Unit – Pajęczno Municipality. The partner of the project is the spider county. The main objective of the project is to: increasing the production of renewable energy sources and reducing the use of conventional energy sources in the municipality of Pajęczno and in the spider county, resulting in improvements in the environment as a result of reducing emissions of pollutants into the atmosphere. The subject of the project is the construction of RES installations for residential buildings located in the municipality of Pajęczno and for public utility buildings located in the commune of Pajęczno. The project’s material scope includes: Installation on the side of LIDERA 1. PV PV installation of 6,0 KW, 5,1 KW, 4.2 KW, 3.0 KW and 2.1 KW – 304 locations 2. Biomass boiler with a capacity of 34 KW, 24 KW, 20 KW, 15 KW, 10 KW – 46 locations 3. Solar collectors (a set of two, three and four solar collectors with a water tank of 200 l or 300 l or 400 l) – 163 locations Installation on the PARTNER 1 side. Photovoltaic installation (PV) with a capacity of 30 KW, 12 KW and 4.2 KW on public utility buildings – 3 locations As a result of this project, the greenhouse gas emissions will decrease at 75.51 % or 1 867.58 tonnes of CO2/year. The applicant, as JST, fulfils the eligibility requirements arising from WŁ ROP for the years 2014-2020. The project is technically feasible; the technologies for the execution of works, the materials used will be generally available and known, and the technical solutions will be functionally correct and comply with applicable legal standards. The project uses mechanisms that take into account all users in accordance with the concept of universal design. (English)
Property / summary: The beneficiary (leader) of the project is the Local Government Unit – Pajęczno Municipality. The partner of the project is the spider county. The main objective of the project is to: increasing the production of renewable energy sources and reducing the use of conventional energy sources in the municipality of Pajęczno and in the spider county, resulting in improvements in the environment as a result of reducing emissions of pollutants into the atmosphere. The subject of the project is the construction of RES installations for residential buildings located in the municipality of Pajęczno and for public utility buildings located in the commune of Pajęczno. The project’s material scope includes: Installation on the side of LIDERA 1. PV PV installation of 6,0 KW, 5,1 KW, 4.2 KW, 3.0 KW and 2.1 KW – 304 locations 2. Biomass boiler with a capacity of 34 KW, 24 KW, 20 KW, 15 KW, 10 KW – 46 locations 3. Solar collectors (a set of two, three and four solar collectors with a water tank of 200 l or 300 l or 400 l) – 163 locations Installation on the PARTNER 1 side. Photovoltaic installation (PV) with a capacity of 30 KW, 12 KW and 4.2 KW on public utility buildings – 3 locations As a result of this project, the greenhouse gas emissions will decrease at 75.51 % or 1 867.58 tonnes of CO2/year. The applicant, as JST, fulfils the eligibility requirements arising from WŁ ROP for the years 2014-2020. The project is technically feasible; the technologies for the execution of works, the materials used will be generally available and known, and the technical solutions will be functionally correct and comply with applicable legal standards. The project uses mechanisms that take into account all users in accordance with the concept of universal design. (English) / rank
 
Normal rank
Property / summary: The beneficiary (leader) of the project is the Local Government Unit – Pajęczno Municipality. The partner of the project is the spider county. The main objective of the project is to: increasing the production of renewable energy sources and reducing the use of conventional energy sources in the municipality of Pajęczno and in the spider county, resulting in improvements in the environment as a result of reducing emissions of pollutants into the atmosphere. The subject of the project is the construction of RES installations for residential buildings located in the municipality of Pajęczno and for public utility buildings located in the commune of Pajęczno. The project’s material scope includes: Installation on the side of LIDERA 1. PV PV installation of 6,0 KW, 5,1 KW, 4.2 KW, 3.0 KW and 2.1 KW – 304 locations 2. Biomass boiler with a capacity of 34 KW, 24 KW, 20 KW, 15 KW, 10 KW – 46 locations 3. Solar collectors (a set of two, three and four solar collectors with a water tank of 200 l or 300 l or 400 l) – 163 locations Installation on the PARTNER 1 side. Photovoltaic installation (PV) with a capacity of 30 KW, 12 KW and 4.2 KW on public utility buildings – 3 locations As a result of this project, the greenhouse gas emissions will decrease at 75.51 % or 1 867.58 tonnes of CO2/year. The applicant, as JST, fulfils the eligibility requirements arising from WŁ ROP for the years 2014-2020. The project is technically feasible; the technologies for the execution of works, the materials used will be generally available and known, and the technical solutions will be functionally correct and comply with applicable legal standards. The project uses mechanisms that take into account all users in accordance with the concept of universal design. (English) / qualifier
 
point in time: 17 October 2020
Timestamp+2020-10-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:42, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
RENEWABLE ENERGY SOURCES IN THE MUNICIPALITY OF PAJĘCZNO
Project in Poland financed by DG Regio

    Statements

    0 references
    6,963,874.98 zloty
    0 references
    1,671,330.00 Euro
    13 January 2020
    0 references
    8,759,591.17 zloty
    0 references
    2,102,301.88 Euro
    13 January 2020
    0 references
    79.5 percent
    0 references
    1 July 2019
    0 references
    31 December 2020
    0 references
    GMINA PAJĘCZNO
    0 references
    Beneficjentem (Liderem) projektu jest Jednostka Samorządu Terytorialnego – Gmina Pajęczno. Partnerem projektu jest Powiat Pajęczański. Celem głównym projektu jest: zwiększenie produkcji energii ze źródeł odnawialnych i zmniejszenie wykorzystania konwencjonalnych źródeł energii w gminie Pajęczno oraz w powiecie pajęczańskim, skutkujące poprawie stanu środowiska naturalnego w wyniku redukcji emisji zanieczyszczeń do atmosfery. Przedmiotem projektu jest wykonanie instalacji OZE dla budynków mieszkalnych zlokalizowanych w gminy Pajęczno oraz dla budynków użyteczności publicznej zlokalizowanych w gminie Pajęczno. Zakres rzeczowy projektu obejmuje: Instalacja po stronie LIDERA 1. Instalacja fotowoltaiczna PV mocy 6,0 KW, 5,1 KW, 4,2 KW, 3,0 KW oraz 2,1 KW – 304 lokalizacje 2. Kocioł na biomasę o mocy 34 KW, 24 KW, 20 KW, 15 KW, 10 KW – 46 lokalizacji 3. Kolektory słoneczne (zestaw dwóch, trzech i czterech kolektorów słonecznych wraz z zasobnikiem na wodę 200l lub 300l lub 400l) – 163 lokalizacje Instalacja po stronie PARTNERA 1. Instalacja fotowoltaiczna (PV) o mocy 30 KW, 12 KW oraz 4,2 KW na budynkach użyteczności publicznej – 3 lokalizacje W wyniku realizacji niniejszego projektu spadek emisji gazów cieplarnianych nastąpi na poziomie 75,51% czyli 1 867,58 tony równoważnika CO2/rok. Wnioskodawca, jako JST spełnia wymogi kwalifikowalności wynikające z RPO WŁ na lata 2014 – 2020. Przedsięwzięcie jest wykonalne pod względem technicznym; technologie wykonania robót, zastosowane materiały będą ogólnie dostępne i znane, a rozwiązania techniczne będą prawidłowe pod względem funkcjonalnym oraz zgodne z obowiązującymi normami prawnymi. W projekcie zastosowano mechanizmy uwzględniające wszystkich użytkowników zgodnie z koncepcją projektowania uniwersalnego. (Polish)
    0 references
    The beneficiary (leader) of the project is the Local Government Unit – Pajęczno Municipality. The partner of the project is the spider county. The main objective of the project is to: increasing the production of renewable energy sources and reducing the use of conventional energy sources in the municipality of Pajęczno and in the spider county, resulting in improvements in the environment as a result of reducing emissions of pollutants into the atmosphere. The subject of the project is the construction of RES installations for residential buildings located in the municipality of Pajęczno and for public utility buildings located in the commune of Pajęczno. The project’s material scope includes: Installation on the side of LIDERA 1. PV PV installation of 6,0 KW, 5,1 KW, 4.2 KW, 3.0 KW and 2.1 KW – 304 locations 2. Biomass boiler with a capacity of 34 KW, 24 KW, 20 KW, 15 KW, 10 KW – 46 locations 3. Solar collectors (a set of two, three and four solar collectors with a water tank of 200 l or 300 l or 400 l) – 163 locations Installation on the PARTNER 1 side. Photovoltaic installation (PV) with a capacity of 30 KW, 12 KW and 4.2 KW on public utility buildings – 3 locations As a result of this project, the greenhouse gas emissions will decrease at 75.51 % or 1 867.58 tonnes of CO2/year. The applicant, as JST, fulfils the eligibility requirements arising from WŁ ROP for the years 2014-2020. The project is technically feasible; the technologies for the execution of works, the materials used will be generally available and known, and the technical solutions will be functionally correct and comply with applicable legal standards. The project uses mechanisms that take into account all users in accordance with the concept of universal design. (English)
    17 October 2020
    0 references

    Identifiers

    RPLD.04.01.02-10-0065/18
    0 references