CONSTRUCTION OF 2 PHOTOVOLTAIC INSTALLATIONS OF 39,61 KWP FOR THE PRODUCTION OF ELECTRICITY BY P.P.H.U. “KOLASIŃSKI” KRZYSZTOF KOLASIŃSKI IN WILCZKOWICE LOWER (Q101750): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
(‎Changed label, description and/or aliases in 1 language: translated_label)
label / enlabel / en
 
CONSTRUCTION OF 2 PHOTOVOLTAIC INSTALLATIONS OF 39,61 KWP FOR THE PRODUCTION OF ELECTRICITY BY P.P.H.U. “KOLASIŃSKI” KRZYSZTOF KOLASIŃSKI IN WILCZKOWICE LOWER

Revision as of 15:41, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
CONSTRUCTION OF 2 PHOTOVOLTAIC INSTALLATIONS OF 39,61 KWP FOR THE PRODUCTION OF ELECTRICITY BY P.P.H.U. “KOLASIŃSKI” KRZYSZTOF KOLASIŃSKI IN WILCZKOWICE LOWER
Project in Poland financed by DG Regio

    Statements

    0 references
    252,491.33 zloty
    0 references
    60,597.92 Euro
    13 January 2020
    0 references
    336,700.0 zloty
    0 references
    80,808.0 Euro
    13 January 2020
    0 references
    74.99 percent
    0 references
    1 October 2017
    0 references
    30 June 2018
    0 references
    P.P.H.U. "KOLASIŃSKI" KRZYSZTOF KOLASIŃSKI
    0 references
    0 references

    52°3'16.2"N, 19°11'53.9"E
    0 references
    PROJEKT REALIZOWANY PRZEZ WNIOSKODAWCĘ ZWIĄZANY JEST Z BUDOWĄ DWÓCH INSTALACJI FOTOWOLTAICZNYCH (PV) O MOCY 2X39,60 KWP I INSTALACJI WIATROWEJ O MOCY 1KWP. GŁÓWNYM CELEM PROJEKTU JEST ZWIĘKSZENIE PRODUKCJI ENERGII ELEKTRYCZNEJ Z OZE. PROJEKT BĘDZIE WZMACNIAĆ BEZPIECZEŃSTWO ENERGETYCZNE WOJ. ŁÓDZKIEGO. REALIZACJA PROJEKTU ZNACZĄCO WPISUJE SIĘ W STRATEGICZNE ZAŁOŻENIA I CELE ZAWARTE W WIELU DOKUMENTACH ZARÓWNO NA POZIOMIE KRAJOWYM I REGIONALNYM. JEST ZGODNA Z POLITYKAMI HORYZONTALNYMI UE. W PROJEKCIE ZASTOSOWANO KONCEPCJĘ PROJEKTOWANIA UNIWERSALNEGO- PRODUKTY, ŚRODOWISKO I USŁUGI ZAPROJEKTOWANO TAK, BY BYŁY UŻYTECZNE DLA WSZYSTKICH, MAKSYMALNIE OGRANICZAJĄC KONIECZNOŚĆ ADAPTACJI/SPECJALISTYCZNEGO PROJEKTOWANIA. PROJEKT BĘDZIE REALIZOWANY W OPARCIU O KONCEPCJĘ TECHNICZNĄ Z POSZANOWANIEM OBOWIĄZUJĄCYCH PRZEPISÓW PRAWA, WEDLE NAJLEPSZEJ WIEDZY I DOŚWIADCZENIA I NOWOCZESNYCH ROZWIĄZAŃ TECHNICZNYCH. ZAKRES PRAC OBEJMUJE: I PRACE ZWIĄZANE Z PV: 1. WYKONANIE SZCZEGÓŁOWEGO PROJEKTÓW TECHNICZNYCH PV, 2. ZAKUP I MONTAŻ: a. KONSTRUKCJI WSPORCZYCH, b. MODUŁÓW POLIKRYSTALICZNYCH, c. FALOWNIKÓW, d. OKABLOWANIA, 3. URUCHOMIENIE PV. II PRACE ZWIĄZANE Z INSTALACJĄ WIATROWĄ: 1. WYKONANIE SZCZEGÓŁOWEGO PROJEKTU TECHNICZNEGO INSTALACJI WIATROWEJ, 2. ZAKUP I MONTAŻ: a. MASZTU, b. TURBINY WIATROWEJ, c. INWERTERA, 3. URUCHOMIENIE INSTALACJI WIATROWEJ. W WYNIKU REALIZACJI PROJEKTU ŁĄCZNIE ZOSTANĄ OSIĄGNIĘTE NASTĘPUJĄCE PARAMETRY: • OSZCZĘDNOŚĆ CO2 61,59 T/ROK, • PRODUKCJA ENERGII 75,85 MWH/ROK, PROJEKT BĘDZIE REALIZOWANY OD 01.10.2017 DO 30.06.2018 R. JAKO PRZEDSIĘWZIĘCIE O DŁUGOTERMINOWEJ ŻYWOTNOŚCI POZWOLI UTRZYMAĆ TRWAŁOŚĆ PROJEKTU NA POZIOMIE PRODUKTU ORAZ REZULTATU PRZEZ OKRES DŁUŻSZY NIŻ 3 LATA. BENEFICJENTAMI POŚREDNIMI PROJEKTU BĘDĄ PRZEDE WSZYSTKIM OKOLICZNI MIESZKAŃCY ORAZ INSTYTUCJE I PRZEDSIĘBIORSTWA ZNAJDUJĄCE SIĘ W SFERZE ODDZIAŁYWANIA PROJEKTU ORAZ KORZYSTAJĄCY Z WYGENEROWANYCH KORZYŚCI SPOŁECZNO – EKONOMICZNYCH (Polish)
    0 references
    THE PROJECT IMPLEMENTED BY THE APPLICANT IS RELATED TO THE CONSTRUCTION OF TWO PHOTOVOLTAIC INSTALLATIONS (PV) WITH A CAPACITY OF 2X39,60 KWP AND WIND INSTALLATION WITH A CAPACITY OF 1KWP. THE MAIN OBJECTIVE OF THE PROJECT IS TO INCREASE THE PRODUCTION OF ELECTRICITY FROM RES. THE PROJECT WILL STRENGTHEN THE ENERGY SECURITY OF THE WARS. I'M FROM LODZ. THE IMPLEMENTATION OF THE PROJECT IS SIGNIFICANTLY IN LINE WITH THE STRATEGIC OBJECTIVES AND OBJECTIVES CONTAINED IN MANY DOCUMENTS AT BOTH NATIONAL AND REGIONAL LEVEL. IT IS IN LINE WITH EU HORIZONTAL POLICIES. THE PROJECT USES THE UNIWERSAL DESIGN CONCEPT – PRODUCTS, ENVIRONMENT AND SERVICES ARE DESIGNED TO BE USEFUL FOR ALL, LIMITING THE NEED FOR ADAPTATION/SPECIAL DESIGN. THE PROJECT WILL BE IMPLEMENTED ON THE BASIS OF A TECHNICAL CONCEPT RESPECTING THE APPLICABLE LEGAL REGULATIONS, ACCORDING TO THE BEST KNOWLEDGE AND EXPERIENCE AND MODERN TECHNICAL SOLUTIONS. THE SCOPE OF WORK SHALL INCLUDE: AND PV-RELATED WORK: 1. IMPLEMENTATION OF DETAILED TECHNICAL PROJECTS PV, 2. PURCHASE AND ASSEMBLY: a. CONSTRUCTIONS of support, b. Polycrystalline modulus, c. inverters, d. wiring, 3. LAUNCHING THE PV. WIND INSTALLATION WORK II: 1. DETAILED TECHNICAL DESIGN OF THE WIND INSTALLATION, 2. PURCHASE AND ASSEMBLY: a. mast, b. wind turbines, c. inverter, 3. START THE WIND SYSTEM. AS A RESULT OF THE PROJECT, THE FOLLOWING PARAMETERS WILL BE ACHIEVED TOGETHER: • SAVING CO2 61.59 T/YEAR, • ENERGY PRODUCTION OF 75.85 MWH/YEAR, THE PROJECT WILL BE IMPLEMENTED FROM 01.10.2017 TO 30.06.2018 R. AS A LONG-TERM VIABILITY PROJECT WILL KEEP THE PROJECT AT PRODUCT LEVEL AND RESULT FOR LONGER THAN 3 YEARS. THE INDIRECT BENEFICIARIES OF THE PROJECT WILL BE MAINLY LOCAL RESIDENTS, INSTITUTIONS AND ENTERPRISES LOCATED IN THE SPHERE OF IMPACT OF THE PROJECT AND BENEFITING FROM THE SOCIO-ECONOMIC BENEFITS GENERATED (English)
    17 October 2020
    0 references

    Identifiers

    RPLD.04.01.02-10-0050/16
    0 references