Demolition and construction of a new bridge along with a mobile bridge by government. I value in m. Skwierina in Provincial Road 159, Nowe Policho-Skwierina in km 13 + 423 (Q100447): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project consists of the demolition and construction of a new bridge, along with the road bridge over the book. The overarching objective is to improve accessibility to motorways and expressways by increasing the standard and quality of the province’s road network and of BRD. The implementation of the project will help to strengthen the coherence of the Polish cross-border network with those of EU Member States, to ensure that the country a...)
(‎Created claim: summary (P836): The project includes demolition and construction of a new bridge, along with a touring bridge through the district of Skwierzyna in the area of demolition and construction of spans, intermediate supports and bridgeheads, planned support and construction of the building of the building in the field of construction, construction of the bridge and construction of the bridge in the field of works. The overarching aim of the project is to improve acc...)
Property / summary
 
The project includes demolition and construction of a new bridge, along with a touring bridge through the district of Skwierzyna in the area of demolition and construction of spans, intermediate supports and bridgeheads, planned support and construction of the building of the building in the field of construction, construction of the bridge and construction of the bridge in the field of works. The overarching aim of the project is to improve accessibility to motorways and expressways by increasing the standard and quality of the road network of voivodships and BRDs. The implementation of the project will contribute to strengthening the coherence of the Polish transp. network with the transp. systems of the EU countries, ensuring the geographical cohesion of the country and individual regions with the European space. As a result of the investment, it is planned to achieve the following objectives: • facilitated accessibility to the main transport routes, especially to the A2 motorway and the S3 express road • good technical condition of the bridge in m.Skwierzyn during road No. 159, • b. good technical condition of the road, reducing excessive fuel consumption, noise and exhaust emissions, • improvement of pedestrian safety by securing pedestrian traffic by railing on the edge of the pavement and slopes on the bridge, • adequate transverse decreases and equality in the transverse and equatorial direction. 159 – b. Good condition of the nave on the bridge – shortening of the journey time. The project’s stakeholders are: residents of the support area – G. Skwierzyna, Miedzyrzeckiego Pow., Woj. Lubuski; the traders; public bodies; non-governmental organisations; State and local authorities; users of public roads (English)
Property / summary: The project includes demolition and construction of a new bridge, along with a touring bridge through the district of Skwierzyna in the area of demolition and construction of spans, intermediate supports and bridgeheads, planned support and construction of the building of the building in the field of construction, construction of the bridge and construction of the bridge in the field of works. The overarching aim of the project is to improve accessibility to motorways and expressways by increasing the standard and quality of the road network of voivodships and BRDs. The implementation of the project will contribute to strengthening the coherence of the Polish transp. network with the transp. systems of the EU countries, ensuring the geographical cohesion of the country and individual regions with the European space. As a result of the investment, it is planned to achieve the following objectives: • facilitated accessibility to the main transport routes, especially to the A2 motorway and the S3 express road • good technical condition of the bridge in m.Skwierzyn during road No. 159, • b. good technical condition of the road, reducing excessive fuel consumption, noise and exhaust emissions, • improvement of pedestrian safety by securing pedestrian traffic by railing on the edge of the pavement and slopes on the bridge, • adequate transverse decreases and equality in the transverse and equatorial direction. 159 – b. Good condition of the nave on the bridge – shortening of the journey time. The project’s stakeholders are: residents of the support area – G. Skwierzyna, Miedzyrzeckiego Pow., Woj. Lubuski; the traders; public bodies; non-governmental organisations; State and local authorities; users of public roads (English) / rank
 
Normal rank
Property / summary: The project includes demolition and construction of a new bridge, along with a touring bridge through the district of Skwierzyna in the area of demolition and construction of spans, intermediate supports and bridgeheads, planned support and construction of the building of the building in the field of construction, construction of the bridge and construction of the bridge in the field of works. The overarching aim of the project is to improve accessibility to motorways and expressways by increasing the standard and quality of the road network of voivodships and BRDs. The implementation of the project will contribute to strengthening the coherence of the Polish transp. network with the transp. systems of the EU countries, ensuring the geographical cohesion of the country and individual regions with the European space. As a result of the investment, it is planned to achieve the following objectives: • facilitated accessibility to the main transport routes, especially to the A2 motorway and the S3 express road • good technical condition of the bridge in m.Skwierzyn during road No. 159, • b. good technical condition of the road, reducing excessive fuel consumption, noise and exhaust emissions, • improvement of pedestrian safety by securing pedestrian traffic by railing on the edge of the pavement and slopes on the bridge, • adequate transverse decreases and equality in the transverse and equatorial direction. 159 – b. Good condition of the nave on the bridge – shortening of the journey time. The project’s stakeholders are: residents of the support area – G. Skwierzyna, Miedzyrzeckiego Pow., Woj. Lubuski; the traders; public bodies; non-governmental organisations; State and local authorities; users of public roads (English) / qualifier
 
point in time: 17 October 2020
Timestamp+2020-10-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:35, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Demolition and construction of a new bridge along with a mobile bridge by government. I value in m. Skwierina in Provincial Road 159, Nowe Policho-Skwierina in km 13 + 423
Project in Poland financed by DG Regio

    Statements

    0 references
    14,583,545.81 zloty
    0 references
    3,500,050.99 Euro
    13 January 2020
    0 references
    16,386,006.54 zloty
    0 references
    3,932,641.57 Euro
    13 January 2020
    0 references
    89.0 percent
    0 references
    1 January 2014
    0 references
    22 August 2017
    0 references
    WOJEWÓDZTWO LUBUSKIE / ZARZĄD DRÓG WOJEWÓDZKICH W ZIELONEJ GÓRZE
    0 references
    0 references

    52°35'48.1"N, 15°30'4.0"E
    0 references
    Przedsięwzięcie obejmuje rozbiórki i budowę nowego mostu wraz z mostem objazdowym przez rz.Wartę w m.Skwierzyna w ciągu drogi woj.nr 159 Nowe Polichno-Skwierzyna na odc.dł.0,21 km, w zakresie rozbiórki istn.konstrukcji przęseł, podpór pośrednich oraz przyczółków, Planowane wyk. podpór i konstrukcji nośnej obiektu w zakresie robót drog., mostowych wraz z elektr., teletech. oraz sanit.(przebud.sieci wodoc. i bud.kanalizacji). Celem nadrzędnym proj.jest poprawa dostępności do autostrad i dróg ekspresowych poprzez zwiększenie standardu i jakości sieci dróg woj. oraz BRD. Realizacja projektu przyczyni się do wzmocnienia spójności polskiej sieci transp.z systemami transp. krajów UE, zapewnienie gospod.i przestrzennej spójności kraju i poszczególnych regionów z przestrzenią europejską. W wyniku inwestycji planuje się osiągnięcie nw. celów: • ułatwiona dostępność do głównych szlaków komunikacyjnych, zwłaszcza do autostrady A2 oraz drogi ekspresowej S3, • b. dobry stan techniczny mostu w m.Skwierzyna w ciągu drogi woj. nr 159, • b. dobry stan techniczny drogi, redukujący nadmierne zużycie paliwa, hałas i emisje spalin, • poprawa bezpieczeństwa pieszych poprzez zabezpieczenie ruchu pieszego balustradą na krawędzi chodnika i skarpy na moście, • odpowiednie spadki poprzeczne i równości w kierunku poprzecznym i podłużnym – zwiększenie bezpieczeństwa i komfortu jazdy oraz poprawa warunków odwodnienia, • zwiększenie atrakcyjności inwestycyjnej oraz aktywizacji gospod.reg., • ułatwiony dostęp komunikacyjnych do Regionalnego Parku Przemysłowego w Skwierzynie wchodzącego w skład KSSSE, • wzrost mobilności mieszkańców, • ułatwiony przejazd przez Skwierzynę w ciągu drogi woj. 159 – b. dobry stan naw. drogowej na moście – skrócenie czasu przejazdu. Interesariuszami proj.są: mieszkańcy obszaru wsparcia – G. Skwierzyna, Pow.Międzyrzeckiego, Woj.Lubuskiego; przedsiębiorcy; instytucje publiczne; organizacje pozarządowe; władze państwowe i samorządowe; użytkownicy drogi publicznej (Polish)
    0 references
    The project includes demolition and construction of a new bridge, along with a touring bridge through the district of Skwierzyna in the area of demolition and construction of spans, intermediate supports and bridgeheads, planned support and construction of the building of the building in the field of construction, construction of the bridge and construction of the bridge in the field of works. The overarching aim of the project is to improve accessibility to motorways and expressways by increasing the standard and quality of the road network of voivodships and BRDs. The implementation of the project will contribute to strengthening the coherence of the Polish transp. network with the transp. systems of the EU countries, ensuring the geographical cohesion of the country and individual regions with the European space. As a result of the investment, it is planned to achieve the following objectives: • facilitated accessibility to the main transport routes, especially to the A2 motorway and the S3 express road • good technical condition of the bridge in m.Skwierzyn during road No. 159, • b. good technical condition of the road, reducing excessive fuel consumption, noise and exhaust emissions, • improvement of pedestrian safety by securing pedestrian traffic by railing on the edge of the pavement and slopes on the bridge, • adequate transverse decreases and equality in the transverse and equatorial direction. 159 – b. Good condition of the nave on the bridge – shortening of the journey time. The project’s stakeholders are: residents of the support area – G. Skwierzyna, Miedzyrzeckiego Pow., Woj. Lubuski; the traders; public bodies; non-governmental organisations; State and local authorities; users of public roads (English)
    17 October 2020
    0 references

    Identifiers

    RPLB.05.01.01-08-0003/16
    0 references