Thermal modernisation of public buildings in the Municipality of Szaniec. (Q100302): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The subject of the project is the deep renovation of the construction of put. used in pul. the TSO’s return building, a building used for social activities, a kindergarten building. The project includes: the warming of the partitions of the compartment and the division; replacement of windows and/or doors; distracting heaters and/or hot service hot water equipment; the use of exhaust ventilation with thermal recovery and cooling of passive hea...) |
(Created claim: summary (P836): The subject of the project is a deep thermal modernisation of the building. use. publ. in m. Szczaniec: building of the OSP firehouse, building used for social activities, kindergarten and clinic building. The project shall include: warming of partitions and vertical partitions; replacement of windows and/or doors; modern heating and/or hot water installations with heat exchange; application of ventilating and exhaust ventilation with heat recov...) |
||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is a deep thermal modernisation of the building. use. publ. in m. Szczaniec: building of the OSP firehouse, building used for social activities, kindergarten and clinic building. The project shall include: warming of partitions and vertical partitions; replacement of windows and/or doors; modern heating and/or hot water installations with heat exchange; application of ventilating and exhaust ventilation with heat recovery and passive cooling, modern LED descent; installation of photovoltaic inst. and RES heating (heat pump in each building and additionally a biomass boiler in kindergarten); equipment and electronics of the energy management system. Target: inhabitants of G. Szczaniec; users of buildings: social, CSR, kindergartens; the authorities of Mr Szczaniec; the intentions of the protection system on Wednesdays. Improving energy efficiency in public buildings in the area of G. Szczaniec by optimising the energy economy in public buildings in Szczaniec. Specific objectives: Reducing primary energy demand; Reduction of CO emissions; Optimisation of electric e.g. consumption; Increase the use of RES. W. product: L. zmodern. energy building: 3 pcs Dod. ability to produce heat from the source: 0,05 MWt Dod. capacity of electrical e.g. source: 0,02 MWe L. subm. using information and communication technology: 3 pcs L. ex. heat e. with RES: 3 pcs L. n. one electric e. e. from RES: 3 pcs L. zmodern. fodder of heat: 3 Piet. Used building materials subjected to thermomodern.: 1291.98 sqm of the project in the area covered by the revitalisation programme: 0,69 % W. of the result: Estimated annual decrease in emissions of g. heat. (CI 34): 220,59 tonnes of CO2 equivalent/year of annual e. primary consumption in publ.(CI 32): 711975,98 kWh/year Il. heat e. e.: 2136,00 GJ/year Il. e. electrical: 5,87 MWh/year Related to final e. consumption as a result of real. project: 2136,00 GJ/year 1 FTE WORK-women: 0 FTE WORK- males: 1 FTE[...] (English) | |||||||||||||||
Property / summary: The subject of the project is a deep thermal modernisation of the building. use. publ. in m. Szczaniec: building of the OSP firehouse, building used for social activities, kindergarten and clinic building. The project shall include: warming of partitions and vertical partitions; replacement of windows and/or doors; modern heating and/or hot water installations with heat exchange; application of ventilating and exhaust ventilation with heat recovery and passive cooling, modern LED descent; installation of photovoltaic inst. and RES heating (heat pump in each building and additionally a biomass boiler in kindergarten); equipment and electronics of the energy management system. Target: inhabitants of G. Szczaniec; users of buildings: social, CSR, kindergartens; the authorities of Mr Szczaniec; the intentions of the protection system on Wednesdays. Improving energy efficiency in public buildings in the area of G. Szczaniec by optimising the energy economy in public buildings in Szczaniec. Specific objectives: Reducing primary energy demand; Reduction of CO emissions; Optimisation of electric e.g. consumption; Increase the use of RES. W. product: L. zmodern. energy building: 3 pcs Dod. ability to produce heat from the source: 0,05 MWt Dod. capacity of electrical e.g. source: 0,02 MWe L. subm. using information and communication technology: 3 pcs L. ex. heat e. with RES: 3 pcs L. n. one electric e. e. from RES: 3 pcs L. zmodern. fodder of heat: 3 Piet. Used building materials subjected to thermomodern.: 1291.98 sqm of the project in the area covered by the revitalisation programme: 0,69 % W. of the result: Estimated annual decrease in emissions of g. heat. (CI 34): 220,59 tonnes of CO2 equivalent/year of annual e. primary consumption in publ.(CI 32): 711975,98 kWh/year Il. heat e. e.: 2136,00 GJ/year Il. e. electrical: 5,87 MWh/year Related to final e. consumption as a result of real. project: 2136,00 GJ/year 1 FTE WORK-women: 0 FTE WORK- males: 1 FTE[...] (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is a deep thermal modernisation of the building. use. publ. in m. Szczaniec: building of the OSP firehouse, building used for social activities, kindergarten and clinic building. The project shall include: warming of partitions and vertical partitions; replacement of windows and/or doors; modern heating and/or hot water installations with heat exchange; application of ventilating and exhaust ventilation with heat recovery and passive cooling, modern LED descent; installation of photovoltaic inst. and RES heating (heat pump in each building and additionally a biomass boiler in kindergarten); equipment and electronics of the energy management system. Target: inhabitants of G. Szczaniec; users of buildings: social, CSR, kindergartens; the authorities of Mr Szczaniec; the intentions of the protection system on Wednesdays. Improving energy efficiency in public buildings in the area of G. Szczaniec by optimising the energy economy in public buildings in Szczaniec. Specific objectives: Reducing primary energy demand; Reduction of CO emissions; Optimisation of electric e.g. consumption; Increase the use of RES. W. product: L. zmodern. energy building: 3 pcs Dod. ability to produce heat from the source: 0,05 MWt Dod. capacity of electrical e.g. source: 0,02 MWe L. subm. using information and communication technology: 3 pcs L. ex. heat e. with RES: 3 pcs L. n. one electric e. e. from RES: 3 pcs L. zmodern. fodder of heat: 3 Piet. Used building materials subjected to thermomodern.: 1291.98 sqm of the project in the area covered by the revitalisation programme: 0,69 % W. of the result: Estimated annual decrease in emissions of g. heat. (CI 34): 220,59 tonnes of CO2 equivalent/year of annual e. primary consumption in publ.(CI 32): 711975,98 kWh/year Il. heat e. e.: 2136,00 GJ/year Il. e. electrical: 5,87 MWh/year Related to final e. consumption as a result of real. project: 2136,00 GJ/year 1 FTE WORK-women: 0 FTE WORK- males: 1 FTE[...] (English) / qualifier | |||||||||||||||
point in time: 16 October 2020
|
Revision as of 00:40, 16 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of public buildings in the Municipality of Szaniec. |
Project in Poland financed by DG Regio |
Statements
1,794,401.2 zloty
0 references
2,111,060.28 zloty
0 references
85.0 percent
0 references
10 April 2017
0 references
31 December 2019
0 references
GMINA SZCZANIEC
0 references
Przedmiotem projektu jest głęboka termomodernizacja bud. użyt. publ. w m. Szczaniec: budynek remizy OSP, budynek wykorzystywany do działalności społecznej, budynek przedszkola-przychodni. Projekt obejmuje: ocieplenie przegród poz. i pion.; wymiana okien i/lub drzwi zew.; modern. instalacji c.o. i/lub c.w.u. z wymianą źr. ciepła; zastosowanie wentylacji nawiewno-wywiewnej z odzyskiem ciepła oraz chłodzenia pasywnego, modern. ośw. na LED; montaż inst. fotowoltaicznej i ogrzewania OZE (pomp ciepła w każdym z bud. i dodatkowo kotła na biomasę w Przedszkolu); urządzenia i elektronika systemu zarządzania energią. Gr. docelowe: mieszkańcy G. Szczaniec; użytkownicy budynków: społecznego, OSP, przedszkola; władze G. Szczaniec; intytucje systemu ochrony środ. Gł. cel proj.:Poprawa efektywności energetycznej w sektorze budynków użyteczności publicznej na obszarze G. Szczaniec poprzez optymalizację gospodarki energetycznej w obiektach publicznych w m. Szczaniec. Cele szczeg.:Zmniejszenie zapotrzebowania na energię pierwotną; Redukcja emisji CO; Optymalizacja zużycia e. elektrycznej; Zwiększenie wykorzystania OZE. W. produktu: L. zmodern. energetycznie bud.: 3 szt. Dod. zdolność wytw. e. cieplnej ze źr. odn.: 0,05 MWt Dod. zdolność wytw. e. elektrycznej ze źr. odn.: 0,02 MWe L. podm. wykorzystujących techn. informacyjno-komunikacyjne: 3 szt. L. wyb. jedn. wytw. e. cieplnej z OZE: 3 szt. L. wyb. jedn. wytw. e. elektrycznej z OZE: 3 szt. L. zmodern. źr. ciepła: 3 Szt. Pow. użytkowa bud. poddanych termomodern.: 1291,98 mkw Udz. proj. w odn. do obszaru objętego programem rewitalizacji: 0,69% W. rezultatu: Szac. roczny spadek emisji g. ciepl. (CI 34): 220,59 tony równoważnika CO2/rok Zmn. rocznego zużycia e. pierwotnej w bud. publ.(CI 32): 711 975,98 kWh/rok Il. zaoszcz. e. cieplnej: 2136,00 GJ/rok Il. zaoszcz. e. elektrycznej: 5,87 MWh/rok Zmn. zużycia e. końcowej w wyniku real. proj.: 2136,00 GJ/rok Wzr. zatr.: 1 EPC Wzr. zatr.– kobiety: 0 EPC Wzr. zatr.- mężczyźni: 1 EPC[...] (Polish)
0 references
The subject of the project is a deep thermal modernisation of the building. use. publ. in m. Szczaniec: building of the OSP firehouse, building used for social activities, kindergarten and clinic building. The project shall include: warming of partitions and vertical partitions; replacement of windows and/or doors; modern heating and/or hot water installations with heat exchange; application of ventilating and exhaust ventilation with heat recovery and passive cooling, modern LED descent; installation of photovoltaic inst. and RES heating (heat pump in each building and additionally a biomass boiler in kindergarten); equipment and electronics of the energy management system. Target: inhabitants of G. Szczaniec; users of buildings: social, CSR, kindergartens; the authorities of Mr Szczaniec; the intentions of the protection system on Wednesdays. Improving energy efficiency in public buildings in the area of G. Szczaniec by optimising the energy economy in public buildings in Szczaniec. Specific objectives: Reducing primary energy demand; Reduction of CO emissions; Optimisation of electric e.g. consumption; Increase the use of RES. W. product: L. zmodern. energy building: 3 pcs Dod. ability to produce heat from the source: 0,05 MWt Dod. capacity of electrical e.g. source: 0,02 MWe L. subm. using information and communication technology: 3 pcs L. ex. heat e. with RES: 3 pcs L. n. one electric e. e. from RES: 3 pcs L. zmodern. fodder of heat: 3 Piet. Used building materials subjected to thermomodern.: 1291.98 sqm of the project in the area covered by the revitalisation programme: 0,69 % W. of the result: Estimated annual decrease in emissions of g. heat. (CI 34): 220,59 tonnes of CO2 equivalent/year of annual e. primary consumption in publ.(CI 32): 711975,98 kWh/year Il. heat e. e.: 2136,00 GJ/year Il. e. electrical: 5,87 MWh/year Related to final e. consumption as a result of real. project: 2136,00 GJ/year 1 FTE WORK-women: 0 FTE WORK- males: 1 FTE[...] (English)
16 October 2020
0 references
Identifiers
RPLB.03.02.01-08-0017/18
0 references