(Removed claim: summary (P836): The direct objective of the project is to limit the contamination of groundwater and surface water from the waste waters of the agglomeration of Andrepol by increasing the level of equipment of the area of the agglomeration into the basic technical infrastructure and improving the access of the inhabitants to the infrastructure. As a result of the project, a total of 13.41 km of sewerage network will be constructed to allow access to improved...) |
(Created claim: summary (P836): The direct objective of the project is to reduce the contamination of groundwater and surface water by effluents in the Andrespol Agglomeration by increasing the level of equipment of the agglomeration area with basic technical infrastructure and improving residents’ access to this infrastructure. As a result of the project, a total of 13.41 km of sewage network will be built, which will allow access to improved sewage treatment for 1 612 custom...) |
||||||||||||||
Property / summary | |||||||||||||||
The direct objective of the project is to reduce the contamination of groundwater and surface water by effluents in the Andrespol Agglomeration by increasing the level of equipment of the agglomeration area with basic technical infrastructure and improving residents’ access to this infrastructure. As a result of the project, a total of 13.41 km of sewage network will be built, which will allow access to improved sewage treatment for 1 612 customers: • In the town of Wiśniowa Góra with a length of 9144.80 m, • in the town of Justynów with a length of 4271.60 m. The planned project will be equipped with monitoring and visualisation systems. It is also planned to expand the water treatment plant in Justynów, serving the same users as the investment in sanitary sewage. Under ineligible costs, side ducts will be built (PVC. 160 mm and 200 mm) – 3384.20 m. The project also includes project management, including investor supervision, information and promotional activities and costs of staff involved in the project implementation process. The final beneficiaries are residents of the municipality of Andrespol, but in the context of environmental protection, also residents of the Łódzkie-East county and the Łódź Voivodeship. The implementation of the investment is planned for the years 2017-2020 and is fully ready for implementation. The project is of a lasting nature. The municipality will remain in the lifetime of the project owner of the modernised infrastructure. The total investment outlays on the implementation of the project amount to PLN 16 769 417.69, of which eligible expenditure after income is PLN 8 464 423,97. (English) | |||||||||||||||
Property / summary: The direct objective of the project is to reduce the contamination of groundwater and surface water by effluents in the Andrespol Agglomeration by increasing the level of equipment of the agglomeration area with basic technical infrastructure and improving residents’ access to this infrastructure. As a result of the project, a total of 13.41 km of sewage network will be built, which will allow access to improved sewage treatment for 1 612 customers: • In the town of Wiśniowa Góra with a length of 9144.80 m, • in the town of Justynów with a length of 4271.60 m. The planned project will be equipped with monitoring and visualisation systems. It is also planned to expand the water treatment plant in Justynów, serving the same users as the investment in sanitary sewage. Under ineligible costs, side ducts will be built (PVC. 160 mm and 200 mm) – 3384.20 m. The project also includes project management, including investor supervision, information and promotional activities and costs of staff involved in the project implementation process. The final beneficiaries are residents of the municipality of Andrespol, but in the context of environmental protection, also residents of the Łódzkie-East county and the Łódź Voivodeship. The implementation of the investment is planned for the years 2017-2020 and is fully ready for implementation. The project is of a lasting nature. The municipality will remain in the lifetime of the project owner of the modernised infrastructure. The total investment outlays on the implementation of the project amount to PLN 16 769 417.69, of which eligible expenditure after income is PLN 8 464 423,97. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The direct objective of the project is to reduce the contamination of groundwater and surface water by effluents in the Andrespol Agglomeration by increasing the level of equipment of the agglomeration area with basic technical infrastructure and improving residents’ access to this infrastructure. As a result of the project, a total of 13.41 km of sewage network will be built, which will allow access to improved sewage treatment for 1 612 customers: • In the town of Wiśniowa Góra with a length of 9144.80 m, • in the town of Justynów with a length of 4271.60 m. The planned project will be equipped with monitoring and visualisation systems. It is also planned to expand the water treatment plant in Justynów, serving the same users as the investment in sanitary sewage. Under ineligible costs, side ducts will be built (PVC. 160 mm and 200 mm) – 3384.20 m. The project also includes project management, including investor supervision, information and promotional activities and costs of staff involved in the project implementation process. The final beneficiaries are residents of the municipality of Andrespol, but in the context of environmental protection, also residents of the Łódzkie-East county and the Łódź Voivodeship. The implementation of the investment is planned for the years 2017-2020 and is fully ready for implementation. The project is of a lasting nature. The municipality will remain in the lifetime of the project owner of the modernised infrastructure. The total investment outlays on the implementation of the project amount to PLN 16 769 417.69, of which eligible expenditure after income is PLN 8 464 423,97. (English) / qualifier | |||||||||||||||
point in time: 16 October 2020
|
Revision as of 00:23, 16 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | WATER AND WASTEWATER MANAGEMENT IN THE MUNICIPALITY OF ANDREPOL |
Project in Poland financed by DG Regio |
Statements
7,194,760.35 zloty
0 references
8,464,423.97 zloty
0 references
85.0 percent
0 references
22 December 2017
0 references
30 September 2020
0 references
GMINA ANDRESPOL
0 references
Celem bezpośrednim projektu jest ograniczenie skażenia wód gruntowych i powierzchniowych ściekami powstającymi na terenie Aglomeracji Andrespol poprzez podniesienie poziomu wyposażenia obszaru aglomeracji w podstawową infrastrukturę techniczną i poprawę dostępu mieszkańców do tej infrastruktury. W wyniku realizacji projektu zostanie wybudowane łącznie 13,41 km sieci kanalizacyjnej, co pozwoli na dostęp do ulepszonego oczyszczania ścieków 1 612 odbiorcom: • w miejscowości Wiśniowa Góra o długości 9 144,80 m, • w miejscowości Justynów o długości 4 271,60 m. Przewidziane projektem pompownie ścieków wyposażone będą w systemy monitoringu i wizualizacji. Zakłada się również rozbudowę stacji uzdatniania wody w Justynowie obsługującą tych samych użytkowników, których obejmuje inwestycja z zakresu kanalizacji sanitarnej. W ramach kosztów niekwalifikowalnych wybudowane zostaną kanały boczne (PVC śr. 160mm i 200 mm) - 3 384,20 m. Projekt obejmuje również zarządzanie projektem, w którego skład wchodzi nadzór inwestorski, działania informacyjno - promocyjne oraz koszty personelu zaangażowanego w proces realizacji projektu. Beneficjentami ostatecznymi są mieszkańcy Gminy Andrespol, ale w kontekście ochrony środowiska, również mieszkańcy powiatu łódzkiego-wschodniego oraz województwa łódzkiego. Realizację inwestycji zaplanowano lata 2017 - 2020 i jest w pełni gotowa do realizacji. Projekt ma trwały charakter. Gmina pozostanie w okresie trwałości projektu właścicielem zmodernizowanej infrastruktury. Całkowite nakłady inwestycyjne na realizacje projektu wynoszą 16 769 417,69 PLN, w tym wydatki kwalifikowalne po uwzględnieniem dochodu wynoszą 8 464 423,97 PLN. (Polish)
0 references
The direct objective of the project is to reduce the contamination of groundwater and surface water by effluents in the Andrespol Agglomeration by increasing the level of equipment of the agglomeration area with basic technical infrastructure and improving residents’ access to this infrastructure. As a result of the project, a total of 13.41 km of sewage network will be built, which will allow access to improved sewage treatment for 1 612 customers: • In the town of Wiśniowa Góra with a length of 9144.80 m, • in the town of Justynów with a length of 4271.60 m. The planned project will be equipped with monitoring and visualisation systems. It is also planned to expand the water treatment plant in Justynów, serving the same users as the investment in sanitary sewage. Under ineligible costs, side ducts will be built (PVC. 160 mm and 200 mm) – 3384.20 m. The project also includes project management, including investor supervision, information and promotional activities and costs of staff involved in the project implementation process. The final beneficiaries are residents of the municipality of Andrespol, but in the context of environmental protection, also residents of the Łódzkie-East county and the Łódź Voivodeship. The implementation of the investment is planned for the years 2017-2020 and is fully ready for implementation. The project is of a lasting nature. The municipality will remain in the lifetime of the project owner of the modernised infrastructure. The total investment outlays on the implementation of the project amount to PLN 16 769 417.69, of which eligible expenditure after income is PLN 8 464 423,97. (English)
16 October 2020
0 references
Identifiers
RPLD.05.03.01-10-0001/18
0 references