Implementation of innovative, high-maturity innovative services at the Zielona Góra Town Hall (Q100257): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The following tasks are necessary to achieve the desired effect: “Implementation of innovative e-services with a high level of maturity in Zielona Góra Town Hall”: 1.Preparation of the project — development of the feasibility study and preparation of tender documentation. 2.Serverowne-infrastructure: The following work will be carried out, inter alia: Preparation of appropriate logical and electrical installations; Small fit-out works; The pur...)
(‎Created claim: summary (P836): In order to achieve the expected effect of “Implementing innovative e-services with a high level of maturity in Zielona Góra City Office” it is necessary to fulfil the following tasks: 1.Project preparation -development of feasibility study and preparation of tender documentation. 2.Server-infrastructure: The following works will be carried out: —preparing the appropriate logical and electrical installation; —small adaptation work; —purchase of...)
Property / summary
 
In order to achieve the expected effect of “Implementing innovative e-services with a high level of maturity in Zielona Góra City Office” it is necessary to fulfil the following tasks: 1.Project preparation -development of feasibility study and preparation of tender documentation. 2.Server-infrastructure: The following works will be carried out: —preparing the appropriate logical and electrical installation; —small adaptation work; —purchase of a telecommunication cabinet; —installation of precision air conditioning. 3.Local network of the City Council Modernisation of the local network will include: —installation of 12 Switch devices, -replacement of power verticals. 4.Equipment server room Purchasing in particular the following server infrastructure: —black: Server housing (1 pieces), -blade: Switch FB (2 pcs), -blade: Switch Ethernet (2 pcs), -blade: Server(4 pcs), -disks 600 GB SAS 2.5" 10k to Mother DX200 (24 pcs.), -additional memory 16 GB R ECC DDR3 1600 MHz (48 pcs), -Disk company (4 pcs.). 5.Backup Purchase of the data buckup server necessary to run the central storage system. 6.Safe power supply A secure power system will be created: — preparation of design documentation for the installation of a generator; —preparation of a generator installation; —preparing the installation of new UPS emergency power supplies. 7.Workstations Purchase of 48 workstations and purchase of 3 large-format plotters. 8.System software acquiring system software and software to manage server environments for purchased servers (4 pieces each) and access licenses. As part of the project, it is also planned to acquire a server of directory services. 9. Mail Acquiring a license and implement a coherent e-mail system throughout the City Office. 10.Software – development of the GIS system with the purchase of maintenance (Maintenance), [...] (English)
Property / summary: In order to achieve the expected effect of “Implementing innovative e-services with a high level of maturity in Zielona Góra City Office” it is necessary to fulfil the following tasks: 1.Project preparation -development of feasibility study and preparation of tender documentation. 2.Server-infrastructure: The following works will be carried out: —preparing the appropriate logical and electrical installation; —small adaptation work; —purchase of a telecommunication cabinet; —installation of precision air conditioning. 3.Local network of the City Council Modernisation of the local network will include: —installation of 12 Switch devices, -replacement of power verticals. 4.Equipment server room Purchasing in particular the following server infrastructure: —black: Server housing (1 pieces), -blade: Switch FB (2 pcs), -blade: Switch Ethernet (2 pcs), -blade: Server(4 pcs), -disks 600 GB SAS 2.5" 10k to Mother DX200 (24 pcs.), -additional memory 16 GB R ECC DDR3 1600 MHz (48 pcs), -Disk company (4 pcs.). 5.Backup Purchase of the data buckup server necessary to run the central storage system. 6.Safe power supply A secure power system will be created: — preparation of design documentation for the installation of a generator; —preparation of a generator installation; —preparing the installation of new UPS emergency power supplies. 7.Workstations Purchase of 48 workstations and purchase of 3 large-format plotters. 8.System software acquiring system software and software to manage server environments for purchased servers (4 pieces each) and access licenses. As part of the project, it is also planned to acquire a server of directory services. 9. Mail Acquiring a license and implement a coherent e-mail system throughout the City Office. 10.Software – development of the GIS system with the purchase of maintenance (Maintenance), [...] (English) / rank
 
Normal rank
Property / summary: In order to achieve the expected effect of “Implementing innovative e-services with a high level of maturity in Zielona Góra City Office” it is necessary to fulfil the following tasks: 1.Project preparation -development of feasibility study and preparation of tender documentation. 2.Server-infrastructure: The following works will be carried out: —preparing the appropriate logical and electrical installation; —small adaptation work; —purchase of a telecommunication cabinet; —installation of precision air conditioning. 3.Local network of the City Council Modernisation of the local network will include: —installation of 12 Switch devices, -replacement of power verticals. 4.Equipment server room Purchasing in particular the following server infrastructure: —black: Server housing (1 pieces), -blade: Switch FB (2 pcs), -blade: Switch Ethernet (2 pcs), -blade: Server(4 pcs), -disks 600 GB SAS 2.5" 10k to Mother DX200 (24 pcs.), -additional memory 16 GB R ECC DDR3 1600 MHz (48 pcs), -Disk company (4 pcs.). 5.Backup Purchase of the data buckup server necessary to run the central storage system. 6.Safe power supply A secure power system will be created: — preparation of design documentation for the installation of a generator; —preparation of a generator installation; —preparing the installation of new UPS emergency power supplies. 7.Workstations Purchase of 48 workstations and purchase of 3 large-format plotters. 8.System software acquiring system software and software to manage server environments for purchased servers (4 pieces each) and access licenses. As part of the project, it is also planned to acquire a server of directory services. 9. Mail Acquiring a license and implement a coherent e-mail system throughout the City Office. 10.Software – development of the GIS system with the purchase of maintenance (Maintenance), [...] (English) / qualifier
 
point in time: 16 October 2020
Timestamp+2020-10-16T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 00:21, 16 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Implementation of innovative, high-maturity innovative services at the Zielona Góra Town Hall
Project in Poland financed by DG Regio

    Statements

    0 references
    6,209,532.83 zloty
    0 references
    1,490,287.88 Euro
    13 January 2020
    0 references
    7,305,332.85 zloty
    0 references
    1,753,279.88 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    18 August 2015
    0 references
    30 September 2020
    0 references
    MIASTO ZIELONA GÓRA
    0 references
    0 references

    51°55'39.7"N, 15°32'56.4"E
    0 references
    Do osiągnięcia zakładanego efektu jakim jest „Wdrożenie innowacyjnych e-usług o wysokim poziomie dojrzałości w Urzędzie Miasta Zielona Góra” niezbędne jest zrealizowanie następujących zadań: 1.Przygotowanie projektu -opracowanie studium wykonalności oraz opracowanie dokumentacji przetargowej. 2.Serwerownia-infrastruktura: Wykonane zostaną m.in. następujące prace: -przygotowanie odpowiedniej instalacji logicznej oraz elektrycznej; -drobne prace adaptacyjne; -zakup szafy teletechniczej; -zainstalowanie klimatyzacji precyzyjnej. 3.Sieć lokalna Urzędu Miasta Modernizacja sieci lokalnej obejmie m.in.: -zainstalowanie 12 urządzeń Switch, -wymianę pionów zasilania. 4.Serwerownia wyposażenie Zakupiona zostanie w szczególności następująca infrastruktura serwerowa: -blade: Obudowa Serwera (1 szt.), -blade: Switch FB (2 szt.), -blade: Switch Ethernet (2 szt.), -blade: Serwer(4 szt.), -dyski 600GB SAS 2.5" 10k do Macierzy DX200 (24 szt.), -dodatkowa pamięć 16GB R ECC DDR3 1600MHz (48 szt.), -półka dyskowa (4 szt.). 5.Backup Zakup serwera buckup'u danych niezbędnego do uruchomienia systemu centralnego przechowywania danych. 6.Bezpieczne zasilanie Utworzony zostanie system bezpiecznego zasilania: -przygotowanie dokumentacji projektowej dla instalacji agregatu prądotwórczego; -przygotowanie instalacji agregatu prądotwórczego; -przygotowanie instalacji nowych zasilaczy awaryjnych UPS. 7.Stacje robocze Zakup 48 stacji roboczych oraz zakup 3 ploterów wielkoformatowych. 8.Oprogramowanie systemowe pozyskanie oprogramowania systemowego i oprogramowania do zarządzania środowiskami serwerowymi na zakupione serwery (po 4 szt.) oraz licencji dostępowych. W ramach projektu planowany jest także pozyskanie serwera usług katalogowych. 9.Poczta Pozyskanie licencji i wdrożenie w całym Urzędzie Miasta spójnego systemu poczty elektronicznej. 10.Oprogramowanie -rozbudowy systemu GIS wraz z zakupem utrzymania (Maintenance), [...] (Polish)
    0 references
    In order to achieve the expected effect of “Implementing innovative e-services with a high level of maturity in Zielona Góra City Office” it is necessary to fulfil the following tasks: 1.Project preparation -development of feasibility study and preparation of tender documentation. 2.Server-infrastructure: The following works will be carried out: —preparing the appropriate logical and electrical installation; —small adaptation work; —purchase of a telecommunication cabinet; —installation of precision air conditioning. 3.Local network of the City Council Modernisation of the local network will include: —installation of 12 Switch devices, -replacement of power verticals. 4.Equipment server room Purchasing in particular the following server infrastructure: —black: Server housing (1 pieces), -blade: Switch FB (2 pcs), -blade: Switch Ethernet (2 pcs), -blade: Server(4 pcs), -disks 600 GB SAS 2.5" 10k to Mother DX200 (24 pcs.), -additional memory 16 GB R ECC DDR3 1600 MHz (48 pcs), -Disk company (4 pcs.). 5.Backup Purchase of the data buckup server necessary to run the central storage system. 6.Safe power supply A secure power system will be created: — preparation of design documentation for the installation of a generator; —preparation of a generator installation; —preparing the installation of new UPS emergency power supplies. 7.Workstations Purchase of 48 workstations and purchase of 3 large-format plotters. 8.System software acquiring system software and software to manage server environments for purchased servers (4 pieces each) and access licenses. As part of the project, it is also planned to acquire a server of directory services. 9. Mail Acquiring a license and implement a coherent e-mail system throughout the City Office. 10.Software – development of the GIS system with the purchase of maintenance (Maintenance), [...] (English)
    16 October 2020
    0 references

    Identifiers

    RPLB.02.01.01-08-0004/15
    0 references