“Modernisation of the settlement economy and stage” (Q98506): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project entitled: “Modernisation of the settlement economy Stage I” includes equipping the existing two halls of the solar dryer for the reversal of the sludge, together with the ventilation system. The scope of the investment will be to include: electrical installations (including in which the internal lighting of the drying rooms and the exterior lighting of halogen lamps are also included) Purchase and installation in hall 1 and hall No...)
(‎Created claim: summary (P836): Project BC: ‘Modernisation of sedimentary economy Stage I’ includes equipping the existing two solar drying halls with sediment switches with their ventilation system. The scope of the investment will include:Electrical installations (including internal lighting of drying halls and external halogen lighting) Purchase and installation in hall No. 1 and No. 2 of the nave switch,Production of road tracks in hall No. 1 and No.2,Performance of ventil...)
Property / summary
 
Project BC: ‘Modernisation of sedimentary economy Stage I’ includes equipping the existing two solar drying halls with sediment switches with their ventilation system. The scope of the investment will include:Electrical installations (including internal lighting of drying halls and external halogen lighting) Purchase and installation in hall No. 1 and No. 2 of the nave switch,Production of road tracks in hall No. 1 and No.2,Performance of ventilation system in hall no. 1 and no.2Promotion of the project,Investor supervision. As a result of the project, the drying process of produced sewage sludge will be improved, which will contribute to a more efficient operation of the sewage treatment plant in Kowalewo Pomorskie (English)
Property / summary: Project BC: ‘Modernisation of sedimentary economy Stage I’ includes equipping the existing two solar drying halls with sediment switches with their ventilation system. The scope of the investment will include:Electrical installations (including internal lighting of drying halls and external halogen lighting) Purchase and installation in hall No. 1 and No. 2 of the nave switch,Production of road tracks in hall No. 1 and No.2,Performance of ventilation system in hall no. 1 and no.2Promotion of the project,Investor supervision. As a result of the project, the drying process of produced sewage sludge will be improved, which will contribute to a more efficient operation of the sewage treatment plant in Kowalewo Pomorskie (English) / rank
 
Normal rank
Property / summary: Project BC: ‘Modernisation of sedimentary economy Stage I’ includes equipping the existing two solar drying halls with sediment switches with their ventilation system. The scope of the investment will include:Electrical installations (including internal lighting of drying halls and external halogen lighting) Purchase and installation in hall No. 1 and No. 2 of the nave switch,Production of road tracks in hall No. 1 and No.2,Performance of ventilation system in hall no. 1 and no.2Promotion of the project,Investor supervision. As a result of the project, the drying process of produced sewage sludge will be improved, which will contribute to a more efficient operation of the sewage treatment plant in Kowalewo Pomorskie (English) / qualifier
 
point in time: 15 October 2020
Timestamp+2020-10-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 23:58, 15 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
“Modernisation of the settlement economy and stage”
Project in Poland financed by DG Regio

    Statements

    0 references
    608,627.37 zloty
    0 references
    146,070.57 Euro
    13 January 2020
    0 references
    716,032.2 zloty
    0 references
    171,847.73 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 December 2017
    0 references
    31 July 2019
    0 references
    GMINA KOWALEWO POMORSKIE
    0 references
    Projekt pn.: „Modernizacja gospodarki osadowej etap I” obejmuje wyposażenie istniejących dwóch hal suszarni słonecznej w przerzucarki nawowe osadów wraz z systemem ich wentylacji. Zakres inwestycji będzie obejmował:Instalacje elektryczne ( w skład których wchodzi również oświetlenie wewnętrzne hal suszarnych oraz zewnętrzne oświetlenie halogenowe)Zakup i instalacja w hali nr 1 i nr 2 przerzucarki nawowej,Wykonanie torów jezdnych w hali nr 1 i nr 2,Wykonanie systemu wentylacji w hali nr 1 i nr 2,Promocja projektu,Nadzór inwestorski. W wyniku realizacji Projektu ulegnie poprawie proces suszenia wytwarzanych osadów ściekowych, co przyczyni się do bardziej efektywnej pracy oczyszczalni ścieków w Kowalewie Pomorskim (Polish)
    0 references
    Project BC: ‘Modernisation of sedimentary economy Stage I’ includes equipping the existing two solar drying halls with sediment switches with their ventilation system. The scope of the investment will include:Electrical installations (including internal lighting of drying halls and external halogen lighting) Purchase and installation in hall No. 1 and No. 2 of the nave switch,Production of road tracks in hall No. 1 and No.2,Performance of ventilation system in hall no. 1 and no.2Promotion of the project,Investor supervision. As a result of the project, the drying process of produced sewage sludge will be improved, which will contribute to a more efficient operation of the sewage treatment plant in Kowalewo Pomorskie (English)
    15 October 2020
    0 references

    Identifiers

    RPKP.04.06.01-04-0007/17
    0 references