Regeneration of the plate. Market and ul. Kościuszki in Nowogrodziec (Q96108): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project will be based on the refurbishment of a run-down infrastructure of the Nowogrodziec town centre through a comprehensive reconstruction of ul. Market and ul. Kościuszki. The scope of the project activities includes a new market unit and ul. Kościuszki and town and country planning. Market 8-11, ul. Market 13-15 and ul. Kościuszki in the area of defence walls within the framework of the Local Reform Programme of the Nowogrodziec muni...)
(‎Created claim: summary (P836): The project will consist of renewing the degraded infrastructure of the city centre of Novogrodziec through a comprehensive reconstruction of the street. Market and St. Oh, it’s Kosciuszko. The scope of the project activities includes the new device Market and Street. Kosciuszko along with the spatial development of the backyard ul. Marketplace 8-11, ul. Marketplace 13-15 and ul. Kosciuszko within the defensive walls as part of the Local Program...)
Property / summary
 
The project will consist of renewing the degraded infrastructure of the city centre of Novogrodziec through a comprehensive reconstruction of the street. Market and St. Oh, it’s Kosciuszko. The scope of the project activities includes the new device Market and Street. Kosciuszko along with the spatial development of the backyard ul. Marketplace 8-11, ul. Marketplace 13-15 and ul. Kosciuszko within the defensive walls as part of the Local Programme of Revitalisation of Nowogrodziec commune for the years 2016-2023. The project envisages adapting the existing public space infrastructure to the needs and expectations of residents, its structure and optimisation, adapting to the needs of people with disabilities, improving aesthetics and, above all, restoring social, cultural and recreational functions. As part of the actions envisaged in the project, work on: • preparation of project documentation, • execution of works in the field of road works, installation and electrical works, • execution of construction works, installation of small architecture and installation, • assembly of urban monitoring, • supervising works (including archaeological) and project management. • Provide promotional and information activities. The investments covered by this project form part of the broader concept of physical and social revitalisation in Novgorodec. These include infrastructure measures, which will provide a specific backdrop for social action, thus contributing comprehensively to the reduction of crisis situations in the area of support. The option was chosen on the basis of a strategic analysis and an analysis of technological solutions (cost efficiency analysis). The project will be implemented by the Municipality of Novgorodec. The employees of the Municipality of Nowogrodziec have many years of experience in the implementation of projects co-financed by national and foreign external funds, which will ensure that all procedures are carried out smoothly in accordance with the rules. (English)
Property / summary: The project will consist of renewing the degraded infrastructure of the city centre of Novogrodziec through a comprehensive reconstruction of the street. Market and St. Oh, it’s Kosciuszko. The scope of the project activities includes the new device Market and Street. Kosciuszko along with the spatial development of the backyard ul. Marketplace 8-11, ul. Marketplace 13-15 and ul. Kosciuszko within the defensive walls as part of the Local Programme of Revitalisation of Nowogrodziec commune for the years 2016-2023. The project envisages adapting the existing public space infrastructure to the needs and expectations of residents, its structure and optimisation, adapting to the needs of people with disabilities, improving aesthetics and, above all, restoring social, cultural and recreational functions. As part of the actions envisaged in the project, work on: • preparation of project documentation, • execution of works in the field of road works, installation and electrical works, • execution of construction works, installation of small architecture and installation, • assembly of urban monitoring, • supervising works (including archaeological) and project management. • Provide promotional and information activities. The investments covered by this project form part of the broader concept of physical and social revitalisation in Novgorodec. These include infrastructure measures, which will provide a specific backdrop for social action, thus contributing comprehensively to the reduction of crisis situations in the area of support. The option was chosen on the basis of a strategic analysis and an analysis of technological solutions (cost efficiency analysis). The project will be implemented by the Municipality of Novgorodec. The employees of the Municipality of Nowogrodziec have many years of experience in the implementation of projects co-financed by national and foreign external funds, which will ensure that all procedures are carried out smoothly in accordance with the rules. (English) / rank
 
Normal rank
Property / summary: The project will consist of renewing the degraded infrastructure of the city centre of Novogrodziec through a comprehensive reconstruction of the street. Market and St. Oh, it’s Kosciuszko. The scope of the project activities includes the new device Market and Street. Kosciuszko along with the spatial development of the backyard ul. Marketplace 8-11, ul. Marketplace 13-15 and ul. Kosciuszko within the defensive walls as part of the Local Programme of Revitalisation of Nowogrodziec commune for the years 2016-2023. The project envisages adapting the existing public space infrastructure to the needs and expectations of residents, its structure and optimisation, adapting to the needs of people with disabilities, improving aesthetics and, above all, restoring social, cultural and recreational functions. As part of the actions envisaged in the project, work on: • preparation of project documentation, • execution of works in the field of road works, installation and electrical works, • execution of construction works, installation of small architecture and installation, • assembly of urban monitoring, • supervising works (including archaeological) and project management. • Provide promotional and information activities. The investments covered by this project form part of the broader concept of physical and social revitalisation in Novgorodec. These include infrastructure measures, which will provide a specific backdrop for social action, thus contributing comprehensively to the reduction of crisis situations in the area of support. The option was chosen on the basis of a strategic analysis and an analysis of technological solutions (cost efficiency analysis). The project will be implemented by the Municipality of Novgorodec. The employees of the Municipality of Nowogrodziec have many years of experience in the implementation of projects co-financed by national and foreign external funds, which will ensure that all procedures are carried out smoothly in accordance with the rules. (English) / qualifier
 
point in time: 15 October 2020
Timestamp+2020-10-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 23:42, 15 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Regeneration of the plate. Market and ul. Kościuszki in Nowogrodziec
Project in Poland financed by DG Regio

    Statements

    0 references
    3,354,316.77 zloty
    0 references
    805,036.02 Euro
    13 January 2020
    0 references
    5,241,119.98 zloty
    0 references
    1,257,868.8 Euro
    13 January 2020
    0 references
    64.0 percent
    0 references
    19 September 2014
    0 references
    31 July 2019
    0 references
    GMINA NOWOGRODZIEC
    0 references
    0 references
    Projekt będzie polegał na odnowieniu zdegradowanej infrastruktury ścisłego centrum miasta Nowogrodziec poprzez kompleksową przebudowę ul. Rynek i ul. Kościuszki. Zakres działań projektowych obejmuje nowe urządzenie Rynku i ul. Kościuszki wraz z zagospodarowaniem przestrzennym zaplecza ul. Rynek 8-11, ul. Rynek 13-15 oraz ul. Kościuszki w obrębie murów obronnych w ramach zadań Lokalnego Programu Rewitalizacji Gminy Nowogrodziec na lata 2016-2023. W ramach projektu przewiduje się dostosowanie istniejącej infrastruktury przestrzeni publicznych do potrzeb i oczekiwań mieszkańców, jej uporządkowanie i zoptymalizowanie, dostosowanie do potrzeb osób niepełnosprawnych, poprawę estetyki a przede wszystkim przywrócenie funkcji społecznych, kulturalnych i rekreacyjnych. W ramach działań przewidzianych w projekcie przewidziano prace w zakresie: • przygotowania dokumentacji projektowej, • wykonania prac w zakresie robót drogowych, robót instalacyjnych i elektrycznych, • wykonanie robót budowlanych, montażu małej architektury i wykonanie nasadzeń, • montaż monitoringu miejskiego, • pełnienia nadzoru nad pracami (w tym archeologicznego) oraz zarządzania projektem. • zapewnienie działań promocyjnych i informacyjnych. Inwestycje objęte niniejszym projektem stanowią element szerszej koncepcji związanej z rewitalizacją fizyczną i społeczną w Nowogrodźcu. Obejmują bowiem działania infrastrukturalne, które stanowić będą swoiste tło dla działań społecznych – tym samym kompleksowo przyczynią się do ograniczenia sytuacji kryzysowych na obszarze wsparcia. Wyboru wariantu dokonano na podstawie analizy strategicznej oraz analizy rozwiązań technologicznych (analiza efektywności kosztowej). Projekt realizowany będzie przez Gminę Nowogrodziec. Pracownicy Gminy Nowogrodziec posiadają wieloletnie doświadczenie w realizacji projektów współfinansowanych ze środków zewnętrznych krajowych i zagranicznych, co zagwarantuje sprawne przeprowadzenie wszystkich procedur zgodnie z przepisami. (Polish)
    0 references
    The project will consist of renewing the degraded infrastructure of the city centre of Novogrodziec through a comprehensive reconstruction of the street. Market and St. Oh, it’s Kosciuszko. The scope of the project activities includes the new device Market and Street. Kosciuszko along with the spatial development of the backyard ul. Marketplace 8-11, ul. Marketplace 13-15 and ul. Kosciuszko within the defensive walls as part of the Local Programme of Revitalisation of Nowogrodziec commune for the years 2016-2023. The project envisages adapting the existing public space infrastructure to the needs and expectations of residents, its structure and optimisation, adapting to the needs of people with disabilities, improving aesthetics and, above all, restoring social, cultural and recreational functions. As part of the actions envisaged in the project, work on: • preparation of project documentation, • execution of works in the field of road works, installation and electrical works, • execution of construction works, installation of small architecture and installation, • assembly of urban monitoring, • supervising works (including archaeological) and project management. • Provide promotional and information activities. The investments covered by this project form part of the broader concept of physical and social revitalisation in Novgorodec. These include infrastructure measures, which will provide a specific backdrop for social action, thus contributing comprehensively to the reduction of crisis situations in the area of support. The option was chosen on the basis of a strategic analysis and an analysis of technological solutions (cost efficiency analysis). The project will be implemented by the Municipality of Novgorodec. The employees of the Municipality of Nowogrodziec have many years of experience in the implementation of projects co-financed by national and foreign external funds, which will ensure that all procedures are carried out smoothly in accordance with the rules. (English)
    15 October 2020
    0 references

    Identifiers

    RPDS.06.03.01-02-0018/17
    0 references