Improving the energy efficiency of public buildings in the municipality of Papowo Biofuels II — Primary school building in Zegartowice (Q98164): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The main objective of the project is to increase energy efficiency and to lower the energy intensity of the building of the Primary School in Zegartowice. the project concerns a comprehensive thermal renovation of a school building consisting of: — insulation of external walls, underground walls and roof, — replacement of the internal walls into an energy efficient building aim to lead to the reduction of heat losses in different areas of the...) |
(Created claim: summary (P836): The main purpose of the project is to increase energy efficiency and to reduce the energy intensity of the building of the Primary School of Clocktowice. The project concerns a comprehensive thermomodernisation of the school building comprising:- warming of the outer walls, underground and roof,- the exchange of internal lighting to energy efficiencyThe above is aimed at achieving the space to bring about the improvement of the energy requiremen...) |
||||||||||||||
Property / summary | |||||||||||||||
The main purpose of the project is to increase energy efficiency and to reduce the energy intensity of the building of the Primary School of Clocktowice. The project concerns a comprehensive thermomodernisation of the school building comprising:- warming of the outer walls, underground and roof,- the exchange of internal lighting to energy efficiencyThe above is aimed at achieving the space to bring about the improvement of the energy requirements of the:• reduction of heat loss in the various areas of the existing building (waves, ceilings), • liquidation of the refrigeration type and leakage of walls, etc. U. 2010 No. 213 item. 1397 as amended) and are not considered to have a potentially significant impact on the environment and its implementation does not require a decision on environmental conditions. (English) | |||||||||||||||
Property / summary: The main purpose of the project is to increase energy efficiency and to reduce the energy intensity of the building of the Primary School of Clocktowice. The project concerns a comprehensive thermomodernisation of the school building comprising:- warming of the outer walls, underground and roof,- the exchange of internal lighting to energy efficiencyThe above is aimed at achieving the space to bring about the improvement of the energy requirements of the:• reduction of heat loss in the various areas of the existing building (waves, ceilings), • liquidation of the refrigeration type and leakage of walls, etc. U. 2010 No. 213 item. 1397 as amended) and are not considered to have a potentially significant impact on the environment and its implementation does not require a decision on environmental conditions. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The main purpose of the project is to increase energy efficiency and to reduce the energy intensity of the building of the Primary School of Clocktowice. The project concerns a comprehensive thermomodernisation of the school building comprising:- warming of the outer walls, underground and roof,- the exchange of internal lighting to energy efficiencyThe above is aimed at achieving the space to bring about the improvement of the energy requirements of the:• reduction of heat loss in the various areas of the existing building (waves, ceilings), • liquidation of the refrigeration type and leakage of walls, etc. U. 2010 No. 213 item. 1397 as amended) and are not considered to have a potentially significant impact on the environment and its implementation does not require a decision on environmental conditions. (English) / qualifier | |||||||||||||||
point in time: 15 October 2020
|
Revision as of 22:56, 15 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Improving the energy efficiency of public buildings in the municipality of Papowo Biofuels II — Primary school building in Zegartowice |
Project in Poland financed by DG Regio |
Statements
272,326.22 zloty
0 references
368,008.41 zloty
0 references
74.0 percent
0 references
1 August 2017
0 references
31 December 2019
0 references
GMINA PAPOWO BISKUPIE
0 references
Q2520053 (Deleted Item)
0 references
Celem głównym projektu jest zwiększenie efektywności energetycznej oraz obniżenie energochłonności budynku Szkoły Podstawowej Zegartowicach Projekt dotyczy kompleksowej termomodernizacji budynku szkoły obejmującej:- ocieplenie ścian zewnętrznych, podziemia i dachu,- wymianę oswietlenia wewnętrznego na energooszczędnePowyższe ma na celu doprowadzenie do:• ograniczenia strat ciepła w różnych strefach istniejącego budynku (ściany, stropy), • likwidacji wad typu przemarzanie oraz przecieki ścian, przemarzanie stropu, • dostosowania obiektu do obowiązujących przepisów dotyczących izolacyjności cieplnej przegród zewnętrznych (co jednocześnie zmniejszy zużycie energii cieplnej potrzebnej do użytkowania budynku zgodnie z jego przeznaczeniem) oraz poprawę stanu technicznego i estetyki obiektu,• zmniejszenia szkodliwych emisji i poprawy jakości powietrzaPlanowane roboty modernizacyjne nie naruszają istniejącego układu konstrukcyjnego budynku.Obiekt będący przedmiotem niniejszego projektu wskazany został w SORSG powiatu chełmińskiego jako jeden z najważniejszych obiektów użyteczności publicznej obszaru wymagający modernizacji energetycznej.Planowana inwestycja nie stanowi rodzaju przedsięwzięcia wymienionego w rozporządzeniu Rady Ministrów z dnia 9 listopada 2010 r. w sprawie przedsięwzięć mogących znacząco oddziaływać na środowisko (Dz. U. 2010 nr 213 poz. 1397 z późn. zm.) i nie zalicza się do przedsięwzięć mogących potencjalnie znacząco oddziaływać na środowisko a jego realizacja nie wymaga uzyskania decyzji o środowiskowych uwarunkowaniach. (Polish)
0 references
The main purpose of the project is to increase energy efficiency and to reduce the energy intensity of the building of the Primary School of Clocktowice. The project concerns a comprehensive thermomodernisation of the school building comprising:- warming of the outer walls, underground and roof,- the exchange of internal lighting to energy efficiencyThe above is aimed at achieving the space to bring about the improvement of the energy requirements of the:• reduction of heat loss in the various areas of the existing building (waves, ceilings), • liquidation of the refrigeration type and leakage of walls, etc. U. 2010 No. 213 item. 1397 as amended) and are not considered to have a potentially significant impact on the environment and its implementation does not require a decision on environmental conditions. (English)
15 October 2020
0 references
Identifiers
RPKP.03.03.00-04-0015/17
0 references