Improving the energy efficiency of the Urban School Group in Rypin (Q98146): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): Energy efficiency (EE) is at the heart of Europe’s energy policy and is one of the headline targets of the Europe 2020 strategy. it aims to reduce primary energy consumption by 20 % by 2020. as energy emissions represent almost 80 % of the total GHG emissions, energy efficiency can make a significant contribution to achieving the goal of a low-carbon economy and combating climate change. Buildings are responsible for around 40 % of final energ...) |
||
Property / summary | |||
Property / summary: Energy efficiency (EE) is at the heart of Europe’s energy policy and is one of the headline targets of the Europe 2020 strategy. it aims to reduce primary energy consumption by 20 % by 2020. as energy emissions represent almost 80 % of the total GHG emissions, energy efficiency can make a significant contribution to achieving the goal of a low-carbon economy and combating climate change. Buildings are responsible for around 40 % of final energy consumption. Investing in energy efficiency in buildings can deliver significant energy savings while supporting economic growth, sustainable development and job creation. The aim of the project is to increase the energy efficiency of the Urban School Group in Rypin. The project will carry out an energy upgrade of the site on the basis of an audit carried out in order to achieve the best ratio of the public funding to the energy output achieved. The implementation of the project will contribute to the rationalisation of consumption and reduction of energy losses, which will contribute to reducing energy demand. Improving energy efficiency will also reduce the so-called low emissions and will also reduce the cost of maintaining the facility. The Assembly of the City Schools (Gymnasium and High School) consists of a main building and a gym with a hyphen. A surface area of 2 296.60 m², the usable surface area of 5 370.00 m², a volume of 24 289.00 m³.In the project is planned, the following activities are planned: insulation of the outer walls (with the basement of the basement), insulation of the ventilation unit, replacement of the door’s door joinery, modification of external elements -replacement of an internal installation. (English) / rank | |||
Revision as of 22:56, 15 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Improving the energy efficiency of the Urban School Group in Rypin |
Project in Poland financed by DG Regio |
Statements
994,734.92 zloty
0 references
2,439,869.81 zloty
0 references
40.77 percent
0 references
30 April 2015
0 references
30 November 2017
0 references
GMINA MIASTA RYPIN
0 references
Efektywność energetyczna (EE) leży u podstaw europejskiej polityki energetycznej i jest jednym z głównych celów strategii „Europa 2020” Zawiera ona cel w postaci redukcji zużycia energii pierwotnej o 20% do 2020 r. Z racji tego, iż emisje związane z energią stanowią niemal 80% całkowitej emisji gazów cieplarnianych (GC), efektywne zużycie energii może znacząco przyczynić się do osiągnięcia celu w postaci gospodarki niskoemisyjnej i walki ze zmianami klimatycznymi. Budynki są odpowiedzialne za około 40% finalnego zużycia energii. Inwestowanie w działania na rzecz efektywności energetycznej w budynkach może przynosić znaczne oszczędności energii, jednocześnie wspierając wzrost gospodarczy, zrównoważony rozwój i tworzenie miejsc pracy. Celem projektu jest zwiększenie efektywności energetycznej Zespołu Szkół Miejskich w Rypinie. W ramach projektu przeprowadzona będzie modernizacja energetyczna obiektu na podstawie przeprowadzonego audytu w celu osiągnięcia najlepszego stosunku wielkości środków publicznych do uzyskanych efektów energetycznych. Realizacja projektu przyczyni się do racjonalizacja zużycia i ograniczenie strat energii co wpłynie zmniejszenie zapotrzebowania na energię . Poprawa efektywności energetycznej wpłynie również na obniżenie tzw. niskiej emisji, a także zmniejszy koszty utrzymania obiektu. Zespół Szkół Miejskich (gimnazjum i liceum plastyczne) składa się z budynku głównego i sali gimnastycznej z łącznikiem). Powierzchnia zabudowy 2 296, 60 m2, powierzchnia użytkowa 5 370,00 m2, kubatura 24 289,00 m3.W ramach projektu planowane są następujące działania: docieplenie ścian zewnętrznych (wraz z kondygnacją piwnic), docieplenie stropodachów wentylowych, wymiana części stolarki drzwiowej zewnętrznej, przebudowa elementów zewnętrznych -wymiana wewnętrznej instalacji. (Polish)
0 references
Identifiers
RPKP.03.03.00-04-0006/16
0 references