Increase in the energy efficiency of the public buildings of the town of Wałbrzych situated at ul. 1 May 103-107, ul. Independence 64, ul. 2A and ul. 1 May 149 (Q95696): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project is the thermo-modernisation of the 4 buildings in pul. Independence 64 insulation of walls and wears, flat roof, flat panel roof and door frames, modernisation of the CWU system from the solar system and the heating of the gas boiler. (thermostat.) and modern condensing boiler, supervision of investment. Zad 3: Term Building — ul. 1 May 149: an ESP 16 cm panel, EPS interface, 14 cm styrop wall; lapter styrop enclosure. EPS 12 cm; w...) |
(Created claim: summary (P836): The subject of the project is the thermal modernisation of 4 buildings used. publ. in the building of Wałbrzych.Scope of the project:Zad 1:Term. of the building of the Primary School No. 17 to heat the walls of the zw, stropodch valves. Independence of the interior and interior walls, ceiling, flat roof over staircase, o. window table and door, modernisation of the CWU system with solar installation and heating with boiler gas. Complex modernisa...) |
||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is the thermal modernisation of 4 buildings used. publ. in the building of Wałbrzych.Scope of the project:Zad 1:Term. of the building of the Primary School No. 17 to heat the walls of the zw, stropodch valves. Independence of the interior and interior walls, ceiling, flat roof over staircase, o. window table and door, modernisation of the CWU system with solar installation and heating with boiler gas. Complex modernisation of the heating system and replacement of the installation on modern windows with stoves.(thermostatic valves) and a modern boiler of condensation. Term. building-ul. 1 May 149:dociepl.Stop with EPS 16 cm, external walls Styrop.EPS gr. 14 cm;dociepl. outdoor walls Styrop ground floor. EPS gr. 12 cm; em. window joinery. and drz.;modernisation of installation. CWU (int. solar, e.g. wires and utensils); modernisation of the heating installation-gas boiler, wires and radiators;investment supervision.Zad 5: Project Management.Zad 6:Promotion of the project.Lok:PSP no. 17 ul. 1 Maja 103-107 Wałbrzych Obręb Sobięcin nr 30 Dz nr 446/3;Bud.ul Niepodległości 64 Wałbrzych Obręb Podgórze No.33 Dz. 04 09 2014 (English) | |||||||||||||||
Property / summary: The subject of the project is the thermal modernisation of 4 buildings used. publ. in the building of Wałbrzych.Scope of the project:Zad 1:Term. of the building of the Primary School No. 17 to heat the walls of the zw, stropodch valves. Independence of the interior and interior walls, ceiling, flat roof over staircase, o. window table and door, modernisation of the CWU system with solar installation and heating with boiler gas. Complex modernisation of the heating system and replacement of the installation on modern windows with stoves.(thermostatic valves) and a modern boiler of condensation. Term. building-ul. 1 May 149:dociepl.Stop with EPS 16 cm, external walls Styrop.EPS gr. 14 cm;dociepl. outdoor walls Styrop ground floor. EPS gr. 12 cm; em. window joinery. and drz.;modernisation of installation. CWU (int. solar, e.g. wires and utensils); modernisation of the heating installation-gas boiler, wires and radiators;investment supervision.Zad 5: Project Management.Zad 6:Promotion of the project.Lok:PSP no. 17 ul. 1 Maja 103-107 Wałbrzych Obręb Sobięcin nr 30 Dz nr 446/3;Bud.ul Niepodległości 64 Wałbrzych Obręb Podgórze No.33 Dz. 04 09 2014 (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is the thermal modernisation of 4 buildings used. publ. in the building of Wałbrzych.Scope of the project:Zad 1:Term. of the building of the Primary School No. 17 to heat the walls of the zw, stropodch valves. Independence of the interior and interior walls, ceiling, flat roof over staircase, o. window table and door, modernisation of the CWU system with solar installation and heating with boiler gas. Complex modernisation of the heating system and replacement of the installation on modern windows with stoves.(thermostatic valves) and a modern boiler of condensation. Term. building-ul. 1 May 149:dociepl.Stop with EPS 16 cm, external walls Styrop.EPS gr. 14 cm;dociepl. outdoor walls Styrop ground floor. EPS gr. 12 cm; em. window joinery. and drz.;modernisation of installation. CWU (int. solar, e.g. wires and utensils); modernisation of the heating installation-gas boiler, wires and radiators;investment supervision.Zad 5: Project Management.Zad 6:Promotion of the project.Lok:PSP no. 17 ul. 1 Maja 103-107 Wałbrzych Obręb Sobięcin nr 30 Dz nr 446/3;Bud.ul Niepodległości 64 Wałbrzych Obręb Podgórze No.33 Dz. 04 09 2014 (English) / qualifier | |||||||||||||||
point in time: 15 October 2020
|
Revision as of 22:38, 15 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Increase in the energy efficiency of the public buildings of the town of Wałbrzych situated at ul. 1 May 103-107, ul. Independence 64, ul. 2A and ul. 1 May 149 |
Project in Poland financed by DG Regio |
Statements
3,373,875.2 zloty
0 references
3,969,264.94 zloty
0 references
85.0 percent
0 references
4 September 2014
0 references
30 April 2018
0 references
GMINA WAŁBRZYCH
0 references
Przedmiotem projektu jest termomodernizacja 4 budynków użyt. publ. w gm. Wałbrzych.Zakres projektu:Zad 1:Term. budynku Publicznej Szkoły Podstawowej nr 17 dociepl. ścian zew, stropodachu wentyl.wymiana stolarki okiennej i drzwiowej,wym.stolarki drzwiowej stalowej,wym.instalacji CO(grzejniki konwekcyjne, zawory termost.) wykonanie nowej instalacji CWU z pojemn. oraz przepływ. elektr.podgrzewaczy wody nadzór inwest.Zad 2:Term. budynku Domu Dziecka–ul. Niepodległości 64 docieplenie ścian zew. i wew.,stropu, dachu płaskiego nad klatką schodową,wym.stolarki okiennej i drzwiowej,modernizacja systemu CWU z wyk.instalacji solarnej oraz dogrzewaniem z kotła gaz.kompleksowa modernizacja systemu grzewczego–wymiana instalacji na nowoczesną z grzejnikami konwek.(zawory termostat.) oraz nowoczesnym kotłem kondensacyj.,regulatorem temp. wew. oraz automatyką pogodową,wymiana instalacji i opraw oświetl.na LED,nadzór inwest.Zad 3:Term. budynku–ul.Ogrodowa 2A:docieplenie ścian zew.stropodachu,wentyl. posadzki na gruncie styrop, wełną min, wym. stolarki okiennej i drzwiowej,wym. instalacji CWU na nową z cyrkulacją,wyk. wentylacji mechan. naw-wyw z odzyskiem ciepła w pom. kuchni,wym. instalacji CO wraz z wymianą grzejników oraz montaż zaworów termostat,wym. instalacji i opraw oświetl. na nowe LED,nadzór inwest.Zad 4: Term. budynku–ul. 1 Maja 149:dociepl.dachu płytą z EPS 16 cm, ścian zewn. styrop.EPS gr. 14 cm;dociepl. ścian zewn. parter styrop. EPS gr. 12cm;wym. stolarki okien. i drz.;modernizacja instal. CWU (inst. solarna, wym. przewodów i przyborów);modernizacja instal. grzewczej–kotła gazowego, przewodów i grzejników;nadzór inwest.Zad 5: Zarządz. projektem.Zad 6:Promocja projektu.Lok:PSP nr 17 ul 1 Maja 103-107 Wałbrzych Obręb Sobięcin nr 30 Dz nr 446/3;Bud.ul Niepodległości 64 Wałbrzych Obręb Podgórze nr 33 Dz nr 628/3;Bud.ul Ogrodowa 2a Wałbrzych Obręb Szczawienko nr 4 Dz nr 177/17;Bud.ul 1 Maja 149 Wałbrzych Obręb Sobięcin nr 30 Dz nr 296/3 Rozp.realizacji projektu: 04 09 2014 (Polish)
0 references
The subject of the project is the thermal modernisation of 4 buildings used. publ. in the building of Wałbrzych.Scope of the project:Zad 1:Term. of the building of the Primary School No. 17 to heat the walls of the zw, stropodch valves. Independence of the interior and interior walls, ceiling, flat roof over staircase, o. window table and door, modernisation of the CWU system with solar installation and heating with boiler gas. Complex modernisation of the heating system and replacement of the installation on modern windows with stoves.(thermostatic valves) and a modern boiler of condensation. Term. building-ul. 1 May 149:dociepl.Stop with EPS 16 cm, external walls Styrop.EPS gr. 14 cm;dociepl. outdoor walls Styrop ground floor. EPS gr. 12 cm; em. window joinery. and drz.;modernisation of installation. CWU (int. solar, e.g. wires and utensils); modernisation of the heating installation-gas boiler, wires and radiators;investment supervision.Zad 5: Project Management.Zad 6:Promotion of the project.Lok:PSP no. 17 ul. 1 Maja 103-107 Wałbrzych Obręb Sobięcin nr 30 Dz nr 446/3;Bud.ul Niepodległości 64 Wałbrzych Obręb Podgórze No.33 Dz. 04 09 2014 (English)
15 October 2020
0 references
Identifiers
RPDS.03.03.04-02-0023/16
0 references