Adapting the infrastructure of the School Complex in District School Complex 1 in Trzebnica to the requirements of modern, safe and welcoming disabled people and the education community (Q96471): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The aim of the project is to adapt the infrastructure of the Second National Army of the Polish Army in the District of the Polish Army in the District of the School Complex No 1 in Trzebnica to the requirements of modern, safe and liveable society and the environment of education, including a facility adapted to the needs of people with disabilities. The students and educational staff are the recipients of the results obtained from the projec...)
(‎Created claim: summary (P836): The subject of the project is to adapt the infrastructure of the Second Army High School in the District School Complex No. 1 in Trzebnica to the requirements of a modern, safe and friendly education environment, including an object adapted to the needs of people with disabilities. The recipients of the results obtained as a result of the project are pupils and teaching staff. Currently, the LO teaches 184 K and 127 M (total 311). Number of teac...)
Property / summary
 
The subject of the project is to adapt the infrastructure of the Second Army High School in the District School Complex No. 1 in Trzebnica to the requirements of a modern, safe and friendly education environment, including an object adapted to the needs of people with disabilities. The recipients of the results obtained as a result of the project are pupils and teaching staff. Currently, the LO teaches 184 K and 127 M (total 311). Number of teachers: 43. The deadline for the implementation of the project is: 30.03.2017-31.12.2019. The applicant is the Trzebnicki District. The organizational and technical facilities will be provided by the Trzebnicki District in terms of the necessary equipment (computers from the radius) and staff with responsibility for project management. The technology for carrying out the work results from the options analysed (see IP//). Analysis of options in SW). Objectives of the project: 1. Carrying out adaptation work and retrofitting of the workshop: mat., physic., chem., geographer., English, German, s. multimedia, s. laptop, including ICT equipment, including students with special educational needs. 2. Construction of a vertical platform for a part-motorically enabling all pupils to have equal access to rooms on different levels. 3. Thermal modernisation (exchange of roof areas, warming, metalworking, carpentry exchange, insulation of foundation and cellar walls (approximately 640 m²) to increase energy efficiency and to reduce thermal energy emissions. Output indicators: 1. The potential of supported childcare infrastructure or educational infrastructure -416 persons – 2019. L. facilities adapted to the needs of people with disabilities -1 pcs, 2019 3. L. supported general education infrastructure facilities – 1 pieces, 2019 4. L. supported workshops in educational establishments – 8, 2019. Results indicators: 1. Number of users of education infrastructure supported by the programme (English)
Property / summary: The subject of the project is to adapt the infrastructure of the Second Army High School in the District School Complex No. 1 in Trzebnica to the requirements of a modern, safe and friendly education environment, including an object adapted to the needs of people with disabilities. The recipients of the results obtained as a result of the project are pupils and teaching staff. Currently, the LO teaches 184 K and 127 M (total 311). Number of teachers: 43. The deadline for the implementation of the project is: 30.03.2017-31.12.2019. The applicant is the Trzebnicki District. The organizational and technical facilities will be provided by the Trzebnicki District in terms of the necessary equipment (computers from the radius) and staff with responsibility for project management. The technology for carrying out the work results from the options analysed (see IP//). Analysis of options in SW). Objectives of the project: 1. Carrying out adaptation work and retrofitting of the workshop: mat., physic., chem., geographer., English, German, s. multimedia, s. laptop, including ICT equipment, including students with special educational needs. 2. Construction of a vertical platform for a part-motorically enabling all pupils to have equal access to rooms on different levels. 3. Thermal modernisation (exchange of roof areas, warming, metalworking, carpentry exchange, insulation of foundation and cellar walls (approximately 640 m²) to increase energy efficiency and to reduce thermal energy emissions. Output indicators: 1. The potential of supported childcare infrastructure or educational infrastructure -416 persons – 2019. L. facilities adapted to the needs of people with disabilities -1 pcs, 2019 3. L. supported general education infrastructure facilities – 1 pieces, 2019 4. L. supported workshops in educational establishments – 8, 2019. Results indicators: 1. Number of users of education infrastructure supported by the programme (English) / rank
 
Normal rank
Property / summary: The subject of the project is to adapt the infrastructure of the Second Army High School in the District School Complex No. 1 in Trzebnica to the requirements of a modern, safe and friendly education environment, including an object adapted to the needs of people with disabilities. The recipients of the results obtained as a result of the project are pupils and teaching staff. Currently, the LO teaches 184 K and 127 M (total 311). Number of teachers: 43. The deadline for the implementation of the project is: 30.03.2017-31.12.2019. The applicant is the Trzebnicki District. The organizational and technical facilities will be provided by the Trzebnicki District in terms of the necessary equipment (computers from the radius) and staff with responsibility for project management. The technology for carrying out the work results from the options analysed (see IP//). Analysis of options in SW). Objectives of the project: 1. Carrying out adaptation work and retrofitting of the workshop: mat., physic., chem., geographer., English, German, s. multimedia, s. laptop, including ICT equipment, including students with special educational needs. 2. Construction of a vertical platform for a part-motorically enabling all pupils to have equal access to rooms on different levels. 3. Thermal modernisation (exchange of roof areas, warming, metalworking, carpentry exchange, insulation of foundation and cellar walls (approximately 640 m²) to increase energy efficiency and to reduce thermal energy emissions. Output indicators: 1. The potential of supported childcare infrastructure or educational infrastructure -416 persons – 2019. L. facilities adapted to the needs of people with disabilities -1 pcs, 2019 3. L. supported general education infrastructure facilities – 1 pieces, 2019 4. L. supported workshops in educational establishments – 8, 2019. Results indicators: 1. Number of users of education infrastructure supported by the programme (English) / qualifier
 
point in time: 15 October 2020
Timestamp+2020-10-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 22:11, 15 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Adapting the infrastructure of the School Complex in District School Complex 1 in Trzebnica to the requirements of modern, safe and welcoming disabled people and the education community
Project in Poland financed by DG Regio

    Statements

    0 references
    1,678,225.62 zloty
    0 references
    402,774.15 Euro
    13 January 2020
    0 references
    1,974,383.09 zloty
    0 references
    473,851.94 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    30 March 2017
    0 references
    30 June 2021
    0 references
    POWIAT TRZEBNICKI
    0 references
    Przedmiotem projektu jest dostosowanie infrastruktury Liceum Ogólnokształcącego im. II Armii Wojska Polskiego w Powiatowym Zespole Szkół nr 1 w Trzebnicy do wymogów nowoczesnej, bezpiecznej i przyjaznej społeczeństwu i środowisku edukacji, w tym obiektu dostosowanego do potrzeb osób niepełnosprawnych. Odbiorcami efektów uzyskanych w wyniku realizacji projektu są uczniowie i kadra nauczycielska. Obecnie w LO uczy się 184 K i 127 M (ogółem 311). Liczba nauczycieli: 43. Termin realizacji projektu to: 30.03.2017 - 31.12.2019 r. Wnioskodawcą jest Powiat Trzebnicki. Zaplecze organizacyjno- techniczne zapewni Powiat Trzebnicki w zakresie niezbędnego sprzętu (komputery z oprogr.) oraz kadry posiadającej dośw. w zakresie zarządzania projektem. Technologia wykonania prac wynika z przeanalizowanych wariantów (zob. Analiza opcji w SW). Cele projektu: 1. Przeprowadzenie prac adaptacyjnych i doposażenie pracowni: mat., fiz., chem., geograf., j. angielski, j. niemiecki, s. multimedialnej, s. laptopowej, w tym w sprzęt TIK, z uwzględnieniem uczniów ze specjalnymi potrzebami edukacyjnymi. 2. Wykonanie platformy pionowej dla niepeł. ruchowo umożliwiającej wszystkim uczniom równy dostęp do pomieszczeń znajdujących się na różnych poziomach. 3. Przeprowadzenie termomodernizacji (wymiana połaci dachu,docieplenie, obróbki blacharskie,wymiana stolarki, izolacja ścian fundamentowych i piwnicznych (ok 640m2) zapewniających zwiększenie efektywności energetycznej oraz zapewniających zmniejszenie emisji energii cieplnej. Wskaźniki produktu: 1. Potencjał objętej wsparciem infrastruktury w zakresie opieki nad dziećmi lub infrastruktury edukacyjnej -416 osób – 2019 r. 2. L. obiektów dostosowanych do potrzeb osób z niepełnosprawnościami -1 szt., 2019 r. 3. L. wspartych obiektów infrastruktury edukacji ogólnej - 1 szt., 2019 r. 4. L. wspartych pracowni w placówkach edukacyjnych - 8, 2019 r. Wskaźniki rezultatu: 1. Liczba użytkowników infrastruktury edukacyjnej wspartej w programie (Polish)
    0 references
    The subject of the project is to adapt the infrastructure of the Second Army High School in the District School Complex No. 1 in Trzebnica to the requirements of a modern, safe and friendly education environment, including an object adapted to the needs of people with disabilities. The recipients of the results obtained as a result of the project are pupils and teaching staff. Currently, the LO teaches 184 K and 127 M (total 311). Number of teachers: 43. The deadline for the implementation of the project is: 30.03.2017-31.12.2019. The applicant is the Trzebnicki District. The organizational and technical facilities will be provided by the Trzebnicki District in terms of the necessary equipment (computers from the radius) and staff with responsibility for project management. The technology for carrying out the work results from the options analysed (see IP//). Analysis of options in SW). Objectives of the project: 1. Carrying out adaptation work and retrofitting of the workshop: mat., physic., chem., geographer., English, German, s. multimedia, s. laptop, including ICT equipment, including students with special educational needs. 2. Construction of a vertical platform for a part-motorically enabling all pupils to have equal access to rooms on different levels. 3. Thermal modernisation (exchange of roof areas, warming, metalworking, carpentry exchange, insulation of foundation and cellar walls (approximately 640 m²) to increase energy efficiency and to reduce thermal energy emissions. Output indicators: 1. The potential of supported childcare infrastructure or educational infrastructure -416 persons – 2019. L. facilities adapted to the needs of people with disabilities -1 pcs, 2019 3. L. supported general education infrastructure facilities – 1 pieces, 2019 4. L. supported workshops in educational establishments – 8, 2019. Results indicators: 1. Number of users of education infrastructure supported by the programme (English)
    15 October 2020
    0 references

    Identifiers

    RPDS.07.02.02-02-0004/18
    0 references