Construction of school as part of a school/kindergarten assembly in Dobrzykowice in the municipality of Czernica (Q96418): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project concerns the launch of a new primary school, which will be created within the framework of a School and Pre-School Team. It covers the construction of a school, its equipment and its management. The facility, fully adapted to the needs of persons with disabilities, will be located in Dobrzykowice, at ul. Rail, in the municipality of Czernica. The total area of the building is 4 139.68 m², whereas the floor area is 2 861.32 m². The...) |
(Created claim: summary (P836): The subject of the project is the launch of a new primary school, which will be built within the framework of the school-pre-school group being built. It includes the construction of the school, its equipment and land development. The above-mentioned facility, fully adapted to the needs of people with disabilities, will be located in Dobrzykowice, on ul. The railroad, in the Chernica Commune. The total area of the building is 4139.68 m², while t...) |
||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is the launch of a new primary school, which will be built within the framework of the school-pre-school group being built. It includes the construction of the school, its equipment and land development. The above-mentioned facility, fully adapted to the needs of people with disabilities, will be located in Dobrzykowice, on ul. The railroad, in the Chernica Commune. The total area of the building is 4139.68 m², while the usable area is 2861.32 m². The realisation of the investment will allow to launch 18 classes of 25 pupils, thus creating a total of 450 school places (including approx. 170 for the needs of the transferred SP in Dobrzykowice). The construction of the Team will be carried out under a single public contract, the school and kindergarten work will begin simultaneously, but the contract with the contractor will specify separate final dates for their execution (earlier for the kindergarten and later for the school). As part of the construction of a kindergarten (the subject of a separate application for funding), there will be, among others, kitchen facilities, boiler room, external infrastructure elements, also intended for the needs of the school, as well as elements of land development, in the scope of obtaining the right to use the above mentioned facility. This project covers the construction of the school building in other areas (e.g. classrooms, offices and workshops of classes I – III with facilities, classrooms, classrooms and workshops of classes IV – VI with facilities, administrative and office part of the school, nurse’s office, speech therapist, cafeteria with catering facilities, library, reading room, small gym, common room, sanitary, restroom, infrastructure for the interior of the school), An important element of the project is also to equip the school with modern teaching aids, including digital, mathematical, natural and linguistic workshops, as well as for children with special educational needs. (English) | |||||||||||||||
Property / summary: The subject of the project is the launch of a new primary school, which will be built within the framework of the school-pre-school group being built. It includes the construction of the school, its equipment and land development. The above-mentioned facility, fully adapted to the needs of people with disabilities, will be located in Dobrzykowice, on ul. The railroad, in the Chernica Commune. The total area of the building is 4139.68 m², while the usable area is 2861.32 m². The realisation of the investment will allow to launch 18 classes of 25 pupils, thus creating a total of 450 school places (including approx. 170 for the needs of the transferred SP in Dobrzykowice). The construction of the Team will be carried out under a single public contract, the school and kindergarten work will begin simultaneously, but the contract with the contractor will specify separate final dates for their execution (earlier for the kindergarten and later for the school). As part of the construction of a kindergarten (the subject of a separate application for funding), there will be, among others, kitchen facilities, boiler room, external infrastructure elements, also intended for the needs of the school, as well as elements of land development, in the scope of obtaining the right to use the above mentioned facility. This project covers the construction of the school building in other areas (e.g. classrooms, offices and workshops of classes I – III with facilities, classrooms, classrooms and workshops of classes IV – VI with facilities, administrative and office part of the school, nurse’s office, speech therapist, cafeteria with catering facilities, library, reading room, small gym, common room, sanitary, restroom, infrastructure for the interior of the school), An important element of the project is also to equip the school with modern teaching aids, including digital, mathematical, natural and linguistic workshops, as well as for children with special educational needs. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is the launch of a new primary school, which will be built within the framework of the school-pre-school group being built. It includes the construction of the school, its equipment and land development. The above-mentioned facility, fully adapted to the needs of people with disabilities, will be located in Dobrzykowice, on ul. The railroad, in the Chernica Commune. The total area of the building is 4139.68 m², while the usable area is 2861.32 m². The realisation of the investment will allow to launch 18 classes of 25 pupils, thus creating a total of 450 school places (including approx. 170 for the needs of the transferred SP in Dobrzykowice). The construction of the Team will be carried out under a single public contract, the school and kindergarten work will begin simultaneously, but the contract with the contractor will specify separate final dates for their execution (earlier for the kindergarten and later for the school). As part of the construction of a kindergarten (the subject of a separate application for funding), there will be, among others, kitchen facilities, boiler room, external infrastructure elements, also intended for the needs of the school, as well as elements of land development, in the scope of obtaining the right to use the above mentioned facility. This project covers the construction of the school building in other areas (e.g. classrooms, offices and workshops of classes I – III with facilities, classrooms, classrooms and workshops of classes IV – VI with facilities, administrative and office part of the school, nurse’s office, speech therapist, cafeteria with catering facilities, library, reading room, small gym, common room, sanitary, restroom, infrastructure for the interior of the school), An important element of the project is also to equip the school with modern teaching aids, including digital, mathematical, natural and linguistic workshops, as well as for children with special educational needs. (English) / qualifier | |||||||||||||||
point in time: 15 October 2020
|
Revision as of 22:09, 15 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of school as part of a school/kindergarten assembly in Dobrzykowice in the municipality of Czernica |
Project in Poland financed by DG Regio |
Statements
1,316,985.48 zloty
0 references
10,535,883.81 zloty
0 references
12.5 percent
0 references
15 June 2016
0 references
30 November 2018
0 references
GMINA CZERNICA
0 references
Przedmiotem projektu jest uruchomienie nowej szkoły podstawowej, która powstanie w ramach budowanego Zespołu Szkolno-Przedszkolnego. Obejmuje swoim zakresem budowę szkoły, jej wyposażenie oraz zagospodarowanie terenu. Ww. placówka, w pełni dostosowana do potrzeb osób niepełnosprawnych, zlokalizowana będzie w miejscowości Dobrzykowice, przy ul. Kolejowej, w Gminie Czernica. Łączna powierzchnia jej zabudowy to 4 139,68 m2, natomiast powierzchnia użytkowa to 2 861,32 m2. Realizacja inwestycji pozwoli uruchomić docelowo 18 klas po 25 uczniów, tym samym powstanie łącznie 450 miejsc szkolnych (w tym ok. 170 na potrzeby przenoszonej SP w Dobrzykowicach). Budowa Zespołu będzie realizowana w ramach jednego zamówienia publicznego, prace dot. szkoły i przedszkola rozpoczną się równolegle, jednakże w umowie z wykonawcą zostaną wskazane odrębne końcowe terminy ich wykonania (wcześniejszy dla przedszkola oraz późniejszy dla szkoły). W ramach budowy przedszkola (przedmiot odrębnego wniosku o dofinansowanie) powstanie m. in. zaplecze kuchenne, kotłownia, elementy infrastruktury zewnętrznej, przeznaczone także na potrzeby szkoły, oraz elementy zagospodarowania terenu, w zakresie umożliwiającym uzyskanie prawa do użytkowania ww. obiektu. Niniejszy projekt obejmuje budowę budynku szkoły w pozostałym zakresie (m. in. klasy, gabinety i pracownie klas I – III wraz z zapleczem, klasy, gabinety i pracownie klas IV – VI wraz z zapleczem, część administracyjno-biurową szkoły, gabinet pielęgniarki, logopedy, stołówkę z zapleczem cateringowym, bibliotekę, czytelnię, małą salę gimnastyczną, świetlicę, sanitariaty, portiernię, hol), jak również pozostałą infrastrukturę zewnętrzną szkoły i zagospodarowanie terenu przewidziane w projekcie budowlanym. Istotnym elementem przedsięwzięcia jest również wyposażenie szkoły w nowoczesne pomoce dydaktyczne, w tym do pracowni cyfrowej, matematycznej, przyrodniczej i językowej oraz dla dzieci ze specjalnymi potrzebami edukacyjnymi. (Polish)
0 references
The subject of the project is the launch of a new primary school, which will be built within the framework of the school-pre-school group being built. It includes the construction of the school, its equipment and land development. The above-mentioned facility, fully adapted to the needs of people with disabilities, will be located in Dobrzykowice, on ul. The railroad, in the Chernica Commune. The total area of the building is 4139.68 m², while the usable area is 2861.32 m². The realisation of the investment will allow to launch 18 classes of 25 pupils, thus creating a total of 450 school places (including approx. 170 for the needs of the transferred SP in Dobrzykowice). The construction of the Team will be carried out under a single public contract, the school and kindergarten work will begin simultaneously, but the contract with the contractor will specify separate final dates for their execution (earlier for the kindergarten and later for the school). As part of the construction of a kindergarten (the subject of a separate application for funding), there will be, among others, kitchen facilities, boiler room, external infrastructure elements, also intended for the needs of the school, as well as elements of land development, in the scope of obtaining the right to use the above mentioned facility. This project covers the construction of the school building in other areas (e.g. classrooms, offices and workshops of classes I – III with facilities, classrooms, classrooms and workshops of classes IV – VI with facilities, administrative and office part of the school, nurse’s office, speech therapist, cafeteria with catering facilities, library, reading room, small gym, common room, sanitary, restroom, infrastructure for the interior of the school), An important element of the project is also to equip the school with modern teaching aids, including digital, mathematical, natural and linguistic workshops, as well as for children with special educational needs. (English)
15 October 2020
0 references
Identifiers
RPDS.07.01.02-02-0022/16
0 references