RES installations in the municipality of Zawonia and in the municipality of Trzebnica (Q95375): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project is the installation of a micro-installation for renewable micro-installations (on-grid, with the possibility to put surplus energy to the grid) and a heat pump. In the case of each grant, de minimis aid will be provided at the level of the recipient, which will be analysed in the context of the possibilities and scope for obtaining de minimis aid by potential grant recipients. The material scope is micro-solar installations connect...) |
(Created claim: summary (P836): The subject of the project is the assembly of RES micro-installations including photovoltaic micro-installations (on-grid, with the possibility of releasing surplus energy into the grid) and heat pump. For each grant, there will be de minimis aid at grantee level, which will be analysed in the context of the possibility and extent of de minimis aid from potential grant recipients. The material scope are photovoltaic micro-installations connected...) |
||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is the assembly of RES micro-installations including photovoltaic micro-installations (on-grid, with the possibility of releasing surplus energy into the grid) and heat pump. For each grant, there will be de minimis aid at grantee level, which will be analysed in the context of the possibility and extent of de minimis aid from potential grant recipients. The material scope are photovoltaic micro-installations connected to the grid and air heat pumps – water for the preparation of hot water and central heating. The implementation of the project provides for the assembly of: the Municipality of Zavonia: number of installations PV 101 number of heat pumps 26 total power PV 388 kWe total heat pump power 65 kWt b) Municipality of Trzebnica: number of installations PV 60 number of heat pumps 30 total power PV 267.80 kWe total heat pump power 170.00 kWt The recipients of the project are residents of single-family houses of the municipality of Zawonia and the municipality of Trzebnica. The project will result in increasing the power of RES installations, increasing the production of energy from RES and reducing greenhouse gas emissions and low emissions by using heat pumps. Emission reduction in the project Annual production of electricity net 456,32 MWhe Annual heat production net 204,76 MWht Annual production of energy from RES 661.08 Mwhe+t avoided CO2 emissions – en. el.KSE 371 Mg/year avoided CO2 emissions – CO2 and CWU 72 Mg/year Total 442.41 Mg/year (English) | |||||||||||||||
Property / summary: The subject of the project is the assembly of RES micro-installations including photovoltaic micro-installations (on-grid, with the possibility of releasing surplus energy into the grid) and heat pump. For each grant, there will be de minimis aid at grantee level, which will be analysed in the context of the possibility and extent of de minimis aid from potential grant recipients. The material scope are photovoltaic micro-installations connected to the grid and air heat pumps – water for the preparation of hot water and central heating. The implementation of the project provides for the assembly of: the Municipality of Zavonia: number of installations PV 101 number of heat pumps 26 total power PV 388 kWe total heat pump power 65 kWt b) Municipality of Trzebnica: number of installations PV 60 number of heat pumps 30 total power PV 267.80 kWe total heat pump power 170.00 kWt The recipients of the project are residents of single-family houses of the municipality of Zawonia and the municipality of Trzebnica. The project will result in increasing the power of RES installations, increasing the production of energy from RES and reducing greenhouse gas emissions and low emissions by using heat pumps. Emission reduction in the project Annual production of electricity net 456,32 MWhe Annual heat production net 204,76 MWht Annual production of energy from RES 661.08 Mwhe+t avoided CO2 emissions – en. el.KSE 371 Mg/year avoided CO2 emissions – CO2 and CWU 72 Mg/year Total 442.41 Mg/year (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is the assembly of RES micro-installations including photovoltaic micro-installations (on-grid, with the possibility of releasing surplus energy into the grid) and heat pump. For each grant, there will be de minimis aid at grantee level, which will be analysed in the context of the possibility and extent of de minimis aid from potential grant recipients. The material scope are photovoltaic micro-installations connected to the grid and air heat pumps – water for the preparation of hot water and central heating. The implementation of the project provides for the assembly of: the Municipality of Zavonia: number of installations PV 101 number of heat pumps 26 total power PV 388 kWe total heat pump power 65 kWt b) Municipality of Trzebnica: number of installations PV 60 number of heat pumps 30 total power PV 267.80 kWe total heat pump power 170.00 kWt The recipients of the project are residents of single-family houses of the municipality of Zawonia and the municipality of Trzebnica. The project will result in increasing the power of RES installations, increasing the production of energy from RES and reducing greenhouse gas emissions and low emissions by using heat pumps. Emission reduction in the project Annual production of electricity net 456,32 MWhe Annual heat production net 204,76 MWht Annual production of energy from RES 661.08 Mwhe+t avoided CO2 emissions – en. el.KSE 371 Mg/year avoided CO2 emissions – CO2 and CWU 72 Mg/year Total 442.41 Mg/year (English) / qualifier | |||||||||||||||
point in time: 15 October 2020
|
Revision as of 17:58, 15 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | RES installations in the municipality of Zawonia and in the municipality of Trzebnica |
Project in Poland financed by DG Regio |
Statements
3,181,594.46 zloty
0 references
3,751,266.1 zloty
0 references
84.81 percent
0 references
1 January 2017
0 references
31 August 2019
0 references
GMINA ZAWONIA
0 references
Przedmiotem projektu jest montaż mikroinstalacji OZE obejmujących mikroinstalacje fotowoltaiczne (on-grid, z możliwością oddawania nadwyżek energii do sieci) oraz pompy ciepła. W przypadku każdego grantu wystąpi pomoc de minimis na poziomie Grantobiorcy, co będzie przedmiotem analizy w kontekście możliwości oraz zakresu uzyskania pomocy de minimis przez potencjalnych Grantobiorców. Zakres rzeczowy to mikroinstalacje fotowoltaiczne przyłączone do sieci oraz pompy ciepła powietrze - woda do przygotowania ciepłej wody użytkowej oraz centralnego ogrzewania. W ramach realizacji przedsięwzięcia przewiduje się montaż: a) Gmina Zawonia: liczba instalacji PV 101 liczba pomp ciepła 26 sumaryczna moc instalacji PV 388 kWe sumaryczna moc pomp ciepła 65 kWt b) Gmina Trzebnica: liczba instalacji PV 60 liczba pomp ciepła 30 sumaryczna moc instalacji PV 267,80 kWe sumaryczna moc pomp ciepła 170,00 kWt Odbiorcami projektu są mieszkańcy domów jednorodzinnych gminy Zawonia oraz Gminy Trzebnica. Efektami projektu będzie zwiększenie mocy instalacji OZE, zwiększenie produkcji energii z OZE oraz redukcja emisji gazów cieplarnianych oraz niskiej emisji przez wykorzystanie pomp ciepła. Redukcja emisji w projekcie Roczna produkcja energii elektrycznej netto 456,32 MWhe Roczna produkcja energii cieplnej netto 204,76 MWht Roczna produkcja energii z OZE 661,08 Mwhe+t Uniknięta emisja CO2 - en. el.KSE 371 Mg / rok Uniknięta emisja CO2 - CO i CWU 72 Mg / rok Suma 442,41 Mg / rok (Polish)
0 references
The subject of the project is the assembly of RES micro-installations including photovoltaic micro-installations (on-grid, with the possibility of releasing surplus energy into the grid) and heat pump. For each grant, there will be de minimis aid at grantee level, which will be analysed in the context of the possibility and extent of de minimis aid from potential grant recipients. The material scope are photovoltaic micro-installations connected to the grid and air heat pumps – water for the preparation of hot water and central heating. The implementation of the project provides for the assembly of: the Municipality of Zavonia: number of installations PV 101 number of heat pumps 26 total power PV 388 kWe total heat pump power 65 kWt b) Municipality of Trzebnica: number of installations PV 60 number of heat pumps 30 total power PV 267.80 kWe total heat pump power 170.00 kWt The recipients of the project are residents of single-family houses of the municipality of Zawonia and the municipality of Trzebnica. The project will result in increasing the power of RES installations, increasing the production of energy from RES and reducing greenhouse gas emissions and low emissions by using heat pumps. Emission reduction in the project Annual production of electricity net 456,32 MWhe Annual heat production net 204,76 MWht Annual production of energy from RES 661.08 Mwhe+t avoided CO2 emissions – en. el.KSE 371 Mg/year avoided CO2 emissions – CO2 and CWU 72 Mg/year Total 442.41 Mg/year (English)
15 October 2020
0 references
Identifiers
RPDS.03.01.00-02-0018/17
0 references