Reconstruction of the municipal building for the social housing in Jarama (Q96039): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The project consists of the conversion of an existing apartment building, a degraded and unoccupied former robot hotel to a place. Jaraków (ref. no 362/47 of Jarache (building) and No 362/30 (connections)) for the purpose of adapting it to social housing, and to a room serving a day-care centre. As a result of the periodical inspection of the state of tech, carried out in 01.2017, it was found that in the emergency, i.e. > 60 % of the destruct...)
Property / summary
The project consists of the conversion of an existing apartment building, a degraded and unoccupied former robot hotel to a place. Jaraków (ref. no 362/47 of Jarache (building) and No 362/30 (connections)) for the purpose of adapting it to social housing, and to a room serving a day-care centre. As a result of the periodical inspection of the state of tech, carried out in 01.2017, it was found that in the emergency, i.e. > 60 % of the destruction is the following: 1.Window and door frames, 2.ext. (sub sufitka) above part of the illuminating room, 3.installations: sanitary, water, central heating and electrical sewerage system 4.floor: ceramic, terray, parquet and 41 to -50 % of consumption have shown structural elements: 1. flat top structures, 2. chimneys, 3th construction walls. In spite of this, the building structure fulfils the load-capacity and stability condition of the project and works on: • Preparation of project documentation,• completion of construction and installation works,• equipment purchase,• publicity measures resulting from the conversion of 21 social housing units (with the equipment standard and technical condition laid down in the Act of 21 June 2001 on the protection of tenants’ rights, the housing of the municipality and the change in the Civil Code) and a room which is part of a common building which performs services for social initiatives organised for and by residents. The option was chosen on the basis of strategic analysis and analysis of technological solutions (cost-effectiveness analysis). The project will be carried out by the Municipality of Strzelm. The municipal staff have many years of experience with the implementation of projects co-financed by the national and external means, which ensures that all procedures are carried out smoothly in accordance with the rules. (English)
 
Property / summary: The project consists of the conversion of an existing apartment building, a degraded and unoccupied former robot hotel to a place. Jaraków (ref. no 362/47 of Jarache (building) and No 362/30 (connections)) for the purpose of adapting it to social housing, and to a room serving a day-care centre. As a result of the periodical inspection of the state of tech, carried out in 01.2017, it was found that in the emergency, i.e. > 60 % of the destruction is the following: 1.Window and door frames, 2.ext. (sub sufitka) above part of the illuminating room, 3.installations: sanitary, water, central heating and electrical sewerage system 4.floor: ceramic, terray, parquet and 41 to -50 % of consumption have shown structural elements: 1. flat top structures, 2. chimneys, 3th construction walls. In spite of this, the building structure fulfils the load-capacity and stability condition of the project and works on: • Preparation of project documentation,• completion of construction and installation works,• equipment purchase,• publicity measures resulting from the conversion of 21 social housing units (with the equipment standard and technical condition laid down in the Act of 21 June 2001 on the protection of tenants’ rights, the housing of the municipality and the change in the Civil Code) and a room which is part of a common building which performs services for social initiatives organised for and by residents. The option was chosen on the basis of strategic analysis and analysis of technological solutions (cost-effectiveness analysis). The project will be carried out by the Municipality of Strzelm. The municipal staff have many years of experience with the implementation of projects co-financed by the national and external means, which ensures that all procedures are carried out smoothly in accordance with the rules. (English) / rank
Normal rank
 

Revision as of 17:47, 15 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reconstruction of the municipal building for the social housing in Jarama
Project in Poland financed by DG Regio

    Statements

    0 references
    987,829.65 zloty
    0 references
    237,079.12 Euro
    13 January 2020
    0 references
    1,576,491.62 zloty
    0 references
    378,357.99 Euro
    13 January 2020
    0 references
    62.66 percent
    0 references
    21 July 2016
    0 references
    31 October 2018
    0 references
    GMINA STRZEGOM
    0 references
    Projekt polega na przebudowie istniejącego budynku mieszk.-usług., zdegradowanego i nieużytkowanego byłego hotelu robotniczego w miejsc. Jaroszów (dz. nr 362/47 obręb Jaroszów (budynek) oraz dz. nr 362/30 (przyłącza)) w celu jego adaptacji na mieszkania socjalne, oraz na pomieszczenie pełniące funkcję świetlicy. W wyniku okresowej kontroli stanu tech., przeprowadzonej w 01.2017 r. stwierdzono, że w stanie awaryjnym tj. >60% zniszczenia są następujące elementy wykończeniowe: 1.stolarka okienna i drzwiowa, 2.tynki wewn.(podsufitka)nad częścią sali świetlicowej, 3.instalacje: kanalizacji sanitarnej, wodociągowej, centralnego ogrzewania i elektrycznej 4.posadzki: ceramiczne, lastrykowe, parkietowe, natomiast zły stan techniczny (41-50% zużycia) wykazały elementy konstrukcyjne: 1. stropowe konstrukcje żelbetowe, 2. kominy, 3. wewn. ściany konstrukcyjne. Pomimo tego, konstrukcja budynku spełnia warunek nośności i stateczności W projekcie przewidziano prace w zakresie: • przygotowania dokumentacji projektowej, • wykonania prac budowlanych i instalacyjnych, • zakupu wyposażenia, • zapewnienia działań promocyjnych W wyniku przebudowy powstanie 21 lokali socjalnych (o standardzie wyposażeniu i stanie technicznym określonym w ustawie z dnia 21 czerwca 2001 r. o ochronie praw lokatorów, mieszkaniowym zasobie gminy i zmianie Kodeksu cywilnego) oraz pomieszczenie, będące częścią wspólną budynku pełniące funkcje świetlicy na potrzeby inicjatyw społecznych organizowanych dla oraz przez mieszkańców. Wyboru wariantu dokonano na podst. analizy strategicznej oraz analizy rozwiązań technologicznych (analiza efektywności kosztowej). Projekt realizowany będzie przez Gminę Strzegom. Pracownicy gminy posiadają wieloletnie doświadczenie w realizacji projektów współfinansowanych ze środków zewn. krajowych i zagranicznych, co gwarantuje sprawne przeprowadzenie wszystkich procedur zgodnie z przepisami. (Polish)
    0 references

    Identifiers

    RPDS.06.01.04-02-0006/17
    0 references