Extension of the Emergency Post Office in Częstochowa City Hospital (Q86309): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project involves the extension of the existing B Pavilion B in northern and southern directions in the ground floor level.The purpose of the extension is to adapt the function based on the ground floor of the Emergency Post’s Pavilion to the requirements of the Act on the National Emergency Medical Service providing a breakdown of the areas required by law.The eligible costs of the project shall be:A. preparation of the project:PLN 210.478...)
(‎Created claim: summary (P836): The project envisages the expansion of the existing pavilion B in the north and south directions at ground level. The aim of the expansion is to adapt the function of the Hospital Rescue Department located on the ground floor to the requirements of the Act on State Medical Rescue, which ensures division into the areas required by the Act. The eligible costs of the project shall be: a. preparation of the project: PLN 210,478,00 gross b. construct...)
Property / summary
 
The project envisages the expansion of the existing pavilion B in the north and south directions at ground level. The aim of the expansion is to adapt the function of the Hospital Rescue Department located on the ground floor to the requirements of the Act on State Medical Rescue, which ensures division into the areas required by the Act. The eligible costs of the project shall be: a. preparation of the project: PLN 210,478,00 gross b. construction work: PLN 3.786.533,59 gross c. promotion of the project: Gross PLN 2.988.41 PLN Ineligible expenditure of PLN 2 million (e.g. purchase of medical equipment) has been shown within the framework of the project. The main objective of the project is to improve the functioning of the medical rescue system and ensure compliance with the conditions of the State Medical Rescue Act of 8 September 2006 through the extension of the SOR. Products and results of the project: a. number of medicinal entities supported: 1 b. Number of facilities adapted to the needs of people with disabilities: 1 As a result of the project, the number of patients treated in the medical entity supported will increase in 2018 to 27,375 people/year. (English)
Property / summary: The project envisages the expansion of the existing pavilion B in the north and south directions at ground level. The aim of the expansion is to adapt the function of the Hospital Rescue Department located on the ground floor to the requirements of the Act on State Medical Rescue, which ensures division into the areas required by the Act. The eligible costs of the project shall be: a. preparation of the project: PLN 210,478,00 gross b. construction work: PLN 3.786.533,59 gross c. promotion of the project: Gross PLN 2.988.41 PLN Ineligible expenditure of PLN 2 million (e.g. purchase of medical equipment) has been shown within the framework of the project. The main objective of the project is to improve the functioning of the medical rescue system and ensure compliance with the conditions of the State Medical Rescue Act of 8 September 2006 through the extension of the SOR. Products and results of the project: a. number of medicinal entities supported: 1 b. Number of facilities adapted to the needs of people with disabilities: 1 As a result of the project, the number of patients treated in the medical entity supported will increase in 2018 to 27,375 people/year. (English) / rank
 
Normal rank
Property / summary: The project envisages the expansion of the existing pavilion B in the north and south directions at ground level. The aim of the expansion is to adapt the function of the Hospital Rescue Department located on the ground floor to the requirements of the Act on State Medical Rescue, which ensures division into the areas required by the Act. The eligible costs of the project shall be: a. preparation of the project: PLN 210,478,00 gross b. construction work: PLN 3.786.533,59 gross c. promotion of the project: Gross PLN 2.988.41 PLN Ineligible expenditure of PLN 2 million (e.g. purchase of medical equipment) has been shown within the framework of the project. The main objective of the project is to improve the functioning of the medical rescue system and ensure compliance with the conditions of the State Medical Rescue Act of 8 September 2006 through the extension of the SOR. Products and results of the project: a. number of medicinal entities supported: 1 b. Number of facilities adapted to the needs of people with disabilities: 1 As a result of the project, the number of patients treated in the medical entity supported will increase in 2018 to 27,375 people/year. (English) / qualifier
 
point in time: 15 October 2020
Timestamp+2020-10-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:39, 15 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Extension of the Emergency Post Office in Częstochowa City Hospital
Project in Poland financed by DG Regio

    Statements

    0 references
    3,390,916.63 zloty
    0 references
    813,819.99 Euro
    13 January 2020
    0 references
    3,989,313.69 zloty
    0 references
    957,435.29 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    30 June 2018
    0 references
    SAMODZIELNY PUBLICZNY ZAKŁAD OPIEKI ZDROWOTNEJ MIEJSKI SZPITAL ZESPOLONY W CZĘSTOCHOWIE
    0 references
    0 references

    50°48'32.4"N, 19°7'27.8"E
    0 references
    Projekt zakłada rozbudowę istniejącego pawilonu B w kierunku północnym oraz południowym w poziomie parteru. Celem rozbudowy jest dostosowanie funkcji zlokalizowanego w parterze pawilonu Szpitalnego Oddziału Ratunkowego do wymagań ustawy o Państwowym Ratownictwie Medycznym zapewniającej podział na wymagane ustawą obszary. Kosztami kwalifikowalnymi projektu są: a. przygotowanie projektu: 210.478,00 PLN brutto b. roboty budowlane: 3.786.533,59 PLN brutto c. promocja projektu: 2.988,41 PLN brutto W ramach projektu zostały wykazane wydatki niekwalifikowalne w wysokości 2 mln PLN (m.in. zakup sprzętu medycznego). Głównym celem projektu jest poprawa funkcjonowania systemu ratownictwa medycznego i zapewnienie spełnienia warunków ustawy o Państwowym Ratownictwie Medycznym z dnia 8 września 2006 r. poprzez rozbudowę SOR. Produkty i rezultaty projektu: a. liczba wspartych podmiotów leczniczych: 1 b. liczba obiektów dostosowanych do potrzeb osób z niepełnosprawnością: 1 W wyniku realizacji projektu liczba leczonych w podmiocie leczniczym objętym wsparciem wzrośnie w 2018 r. do 27 375 osób/rok. (Polish)
    0 references
    The project envisages the expansion of the existing pavilion B in the north and south directions at ground level. The aim of the expansion is to adapt the function of the Hospital Rescue Department located on the ground floor to the requirements of the Act on State Medical Rescue, which ensures division into the areas required by the Act. The eligible costs of the project shall be: a. preparation of the project: PLN 210,478,00 gross b. construction work: PLN 3.786.533,59 gross c. promotion of the project: Gross PLN 2.988.41 PLN Ineligible expenditure of PLN 2 million (e.g. purchase of medical equipment) has been shown within the framework of the project. The main objective of the project is to improve the functioning of the medical rescue system and ensure compliance with the conditions of the State Medical Rescue Act of 8 September 2006 through the extension of the SOR. Products and results of the project: a. number of medicinal entities supported: 1 b. Number of facilities adapted to the needs of people with disabilities: 1 As a result of the project, the number of patients treated in the medical entity supported will increase in 2018 to 27,375 people/year. (English)
    15 October 2020
    0 references

    Identifiers

    POIS.09.01.00-00-0021/16
    0 references