Improving the quality of medical services through the adaptation of the SP Hospital Building SP ZOZ MSWiA in Opole, for the diagnosis and treatment of musculoskeletal diseases and gynaecology (Q86637): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The investment planned for the implementation of the investment shall fall within the scope of:— reconstruction and superstructure of the v floor of the Hospital Building for a block of operations, the purchase of equipment, medical equipment and operating block equipment, — relocation of branches:general surgery, trauma and orthopaedic surgery and gynaecology, — purchase of medical devices and equipment for branches in replacement of obsolete...) |
(Created claim: summary (P836): The planned investment includes: — reconstruction and overbuilding of the fifth floor of the Hospital building for the operational block, – purchase of equipment, medical equipment and equipment of the operating unit, – reconstruction of branches: general surgery, trauma-orthopaedic surgery and gynecology – purchase of medical devices and equipment for branches as part of the replacement of outdated hardware infrastructure., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The planned investment includes: — reconstruction and overbuilding of the fifth floor of the Hospital building for the operational block, – purchase of equipment, medical equipment and equipment of the operating unit, – reconstruction of branches: general surgery, trauma-orthopaedic surgery and gynecology – purchase of medical devices and equipment for branches as part of the replacement of outdated hardware infrastructure. (English) | |||||||||||||||
Property / summary: The planned investment includes: — reconstruction and overbuilding of the fifth floor of the Hospital building for the operational block, – purchase of equipment, medical equipment and equipment of the operating unit, – reconstruction of branches: general surgery, trauma-orthopaedic surgery and gynecology – purchase of medical devices and equipment for branches as part of the replacement of outdated hardware infrastructure. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The planned investment includes: — reconstruction and overbuilding of the fifth floor of the Hospital building for the operational block, – purchase of equipment, medical equipment and equipment of the operating unit, – reconstruction of branches: general surgery, trauma-orthopaedic surgery and gynecology – purchase of medical devices and equipment for branches as part of the replacement of outdated hardware infrastructure. (English) / qualifier | |||||||||||||||
point in time: 14 October 2020
|
Revision as of 17:04, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Improving the quality of medical services through the adaptation of the SP Hospital Building SP ZOZ MSWiA in Opole, for the diagnosis and treatment of musculoskeletal diseases and gynaecology |
Project in Poland financed by DG Regio |
Statements
16,766,911.81 zloty
0 references
19,725,778.61 zloty
0 references
85.0 percent
0 references
1 January 2014
0 references
30 April 2019
0 references
SAMODZIELNY PUBLICZNY ZAKŁAD OPIEKI ZDROWOTNEJ MINISTERSTWA SPRAW WEWNĘTRZNYCH I ADMINISTRACJI W OPOLU
0 references
Zaplanowana do realizacji inwestycja obejmuje swoim zakresem: - przebudowę i nadbudowę V piętra budynku Szpitala z przeznaczeniem na blok operacyjny, - zakup aparatury, sprzętu medycznego i wyposażenia bloku operacyjnego, - przebudowę oddziałów: chirurgii ogólnej, chirurgii urazowo-ortopedycznej i ginekologii, - zakup wyrobów medycznych oraz wyposażenia na oddziały w ramach wymiany przestarzałej infrastruktury sprzętowej. (Polish)
0 references
The planned investment includes: — reconstruction and overbuilding of the fifth floor of the Hospital building for the operational block, – purchase of equipment, medical equipment and equipment of the operating unit, – reconstruction of branches: general surgery, trauma-orthopaedic surgery and gynecology – purchase of medical devices and equipment for branches as part of the replacement of outdated hardware infrastructure. (English)
14 October 2020
0 references
Identifiers
POIS.09.02.00-00-0071/17
0 references