The active protection of bats and the restoration of the habitats of mud habitats in the northern part of the Arc in Mountain in Kampinosim of the National Park (Q85535): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The project area is located in the eastern part of the Kampinos National Park.Occupies the northern arm of the parabolic effect, so calledCity of Góra.It is a non-forest area and the most transformed part of the site (buildings, hala and ventilation units) occupies approximately half the area.In the above mentioned area, the demolition of construction works is planned to be carried out, leaving only the underground part and the bunkers integra...) |
||
Property / summary | |||
Property / summary: The project area is located in the eastern part of the Kampinos National Park.Occupies the northern arm of the parabolic effect, so calledCity of Góra.It is a non-forest area and the most transformed part of the site (buildings, hala and ventilation units) occupies approximately half the area.In the above mentioned area, the demolition of construction works is planned to be carried out, leaving only the underground part and the bunkers integrated into the dunes (cost of PLN 699.824,49).Entry into the bunkering tanker will be opened, access doors and gaps will be inserted to serve the bats and other small animals.The space thus closed will be an excellent location for the bat colonies (cost 34.686,00).However, it is already in the process of being used by a strong human and adverse climatic conditions (in the case of large open entrance, many inlet ports) make the population of bats very low.Throughout the whole field, the rehabilitation measures to restore the optimum conditions for the development of masonry, including the sites of the buildings and the roof of the bunkering tanker, are planned.Once the demolition works have been completed, a major part of the site will be covered with a layer of imported sand, on which, after appropriate preparation of the ground, the silt plants will be seeded and have been planted with various methods (cost 545.382,00).Overall, the project foresees an increase in the colonies of bats and an increase in the surface area of brush- and thermophilic grasslands to about.1.4 ha.The Facility will host a spout route equipped with a footbridge and an information sheet (cost 368.254,62) for the purpose of making walls of overhead mud. (English) / rank | |||
Revision as of 16:46, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | The active protection of bats and the restoration of the habitats of mud habitats in the northern part of the Arc in Mountain in Kampinosim of the National Park |
Project in Poland financed by DG Regio |
Statements
2,079,093.08 zloty
0 references
2,445,991.87 zloty
0 references
85.0 percent
0 references
1 December 2015
0 references
30 June 2020
0 references
KAMPINOSKI PARK NARODOWY
0 references
Obszar przedsięwzięcia zlokalizowany jest we wschodniej części Kampinoskiego Parku Narodowego. Zajmuje północne ramię wydmy parabolicznej, tzw. Łużowej Góry. Jest to obszar bezleśny, a najbardziej przekształcona część terenu (budynki, hala i kominy wentylacyjne) zajmuje ok. połowy powierzchni obszaru. Na wyżej wymienionym obszarze planuje się przeprowadzić rozbiórkę pozostałości obiektów budowlanych pozostawiając jedynie część podziemną oraz bunkier wkomponowany w wydmy (koszt 699.824,49 zł.). Wjazd do bunkra zostanie zamurowany, wstawione zostaną drzwi wejściowe oraz szczeliny, które służyć będą nietoperzom i innym drobnym zwierzętom. Zamknięta w ten sposób przestrzeń stanowić będzie doskonałe miejsce przebywania dla kolonii nietoperzy (koszt 34.686,00). Już obecnie jest ona przez nie użytkowana jednak silna penetracja człowieka i niekorzystne warunki klimatyczne (przewiew - duże otwarte wejście, wiele otworów wlotowych) powodują, że populacja nietoperzy jest dotychczas niewielka. Na całym terenie, wraz z miejscami po wyburzonych budynkach oraz dachem bunkra planujemy przeprowadzić działania rekultywacyjne mające na celu przywrócenie optymalnych warunków rozwoju muraw. Po zakończeniu prac rozbiórkowych większa część terenu zostanie pokryta warstwą przywiezionego, rzecznego piasku, na którym, po odpowiednim przygotowaniu podłoża, wysiewane i nasadzane będą rośliny murawowe z zastosowaniem różnych metod (koszt 545.382,00). W sumie w ramach projektu przewiduje się powiększenie kolonii nietoperzy oraz powiększenie powierzchni muraw szczotlichowych i ciepłolubnych do ok. 1,4 ha. Przez zrenaturyzowany obiekt poprowadzona zostanie ścieżka spacerowa wyposażona w kładkę i tablice informacyjne (koszt 368.254,62) w celu udostępnienia muraw napiaskowych. (Polish)
0 references
Identifiers
POIS.02.04.00-00-0017/16
0 references