The protection of Lake Omani is supported by the extension of the sanitary sewerage network in the village of Nowy Dwór, Perzin and Strzyżewo (Q85509): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project covers the extension of the sewerage network in the municipality of Zbązyń by building a sewerage network in Nowy Dwór, Perzin and Strzyżewo and installing a photovoltaic installation on the site of the wastewater treatment plant.The total length of the sewerage network to be constructed, as part of the project, according to the Programme for Operation Cycle (PFU) is 17 867 m including (gravity sewer — 9 632 m, pressure sewer — 8 2...) |
(Created claim: summary (P836): The project covers the extension of the sanitary sewage system in the Zbąszyń commune by building a sanitary sewer system in Nowy Dwór, Perzyna and Strzyżewo and assembling a photovoltaic installation in the sewage treatment plant. The total length of the sewage network planned to be built within the project, according to the Functional and Used Programme (PFU) is 17867 m, including (gravity canalisation – 9632 m, press drain – 8235 m), while th...) |
||||||||||||||
Property / summary | |||||||||||||||
The project covers the extension of the sanitary sewage system in the Zbąszyń commune by building a sanitary sewer system in Nowy Dwór, Perzyna and Strzyżewo and assembling a photovoltaic installation in the sewage treatment plant. The total length of the sewage network planned to be built within the project, according to the Functional and Used Programme (PFU) is 17867 m, including (gravity canalisation – 9632 m, press drain – 8235 m), while the number of pumping stations planned for construction is 12 units. (English) | |||||||||||||||
Property / summary: The project covers the extension of the sanitary sewage system in the Zbąszyń commune by building a sanitary sewer system in Nowy Dwór, Perzyna and Strzyżewo and assembling a photovoltaic installation in the sewage treatment plant. The total length of the sewage network planned to be built within the project, according to the Functional and Used Programme (PFU) is 17867 m, including (gravity canalisation – 9632 m, press drain – 8235 m), while the number of pumping stations planned for construction is 12 units. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project covers the extension of the sanitary sewage system in the Zbąszyń commune by building a sanitary sewer system in Nowy Dwór, Perzyna and Strzyżewo and assembling a photovoltaic installation in the sewage treatment plant. The total length of the sewage network planned to be built within the project, according to the Functional and Used Programme (PFU) is 17867 m, including (gravity canalisation – 9632 m, press drain – 8235 m), while the number of pumping stations planned for construction is 12 units. (English) / qualifier | |||||||||||||||
point in time: 14 October 2020
|
Revision as of 16:45, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | The protection of Lake Omani is supported by the extension of the sanitary sewerage network in the village of Nowy Dwór, Perzin and Strzyżewo |
Project in Poland financed by DG Regio |
Statements
8,942,148.74 zloty
0 references
10,520,174.99 zloty
0 references
85.0 percent
0 references
1 January 2017
0 references
31 December 2020
0 references
GMINA ZBĄSZYŃ
0 references
Przedmiotowe przedsięwzięcie obejmuje swoim zakresem rozbudowę sieci kanalizacji sanitarnej na terenie gminy Zbąszyń poprzez budowę sieci kanalizacji sanitarnej w miejscowościach Nowy Dwór, Perzyny i Strzyżewo oraz montaż instalacji fotowoltaicznej na terenie Oczyszczalni ścieków. Łączna długość sieci kanalizacyjnej planowana do budowy,w ramach projektu, według Programu Funkcjonalno- Użytkowego (PFU) wynosi 17 867 m, w tym (kanalizacja grawitacyjna – 9 632 m, kanalizacja tłoczna – 8 235 m), natomiast liczba przepompowni planowana do budowy to 12 sztuk. (Polish)
0 references
The project covers the extension of the sanitary sewage system in the Zbąszyń commune by building a sanitary sewer system in Nowy Dwór, Perzyna and Strzyżewo and assembling a photovoltaic installation in the sewage treatment plant. The total length of the sewage network planned to be built within the project, according to the Functional and Used Programme (PFU) is 17867 m, including (gravity canalisation – 9632 m, press drain – 8235 m), while the number of pumping stations planned for construction is 12 units. (English)
14 October 2020
0 references
Identifiers
POIS.02.03.00-00-0393/17
0 references