Q85403 (Q85403): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The project includes the extension of the sewage treatment plant located in Bodzanów. As a result of the expansion, the throughput of the treatment plant will increase from 1700 RLM to 3780 RLM. The project also plans to build a sanitary sewer system in Bodzanów, Chodkowo and Chodkowo-Działki, with a total length of 15.85 km. 1913 new sanitation users will be connected to the new network., translated_summary) |
(Changed label, description and/or aliases in 1 language: remove_english_label) |
||
label / en | label / en | ||
Revision as of 15:58, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Poland financed by DG Regio |
Statements
8,090,942.61 zloty
0 references
9,518,756.02 zloty
0 references
85.0 percent
0 references
14 April 2016
0 references
30 November 2020
0 references
GMINA BODZANÓW
0 references
Projekt obejmuje rozbudowę oczyszczalni ścieków zlokalizowanej w m. Bodzanów. W wyniku rozbudowy przepustowość oczyszczalni wzrośnie z 1700 RLM do 3780 RLM. W ramach projektu planowana jest też budowa sieci kanalizacji sanitarnej w m. Bodzanów, Chodkowo i Chodkowo-Działki o łącznej długości 15,85 km. Do nowowybudowanej sieci zostanie podłączonych 1913 nowych użytkowników kanalizacji sanitarnej. (Polish)
0 references
The project includes the extension of the sewage treatment plant located in Bodzanów. As a result of the expansion, the throughput of the treatment plant will increase from 1700 RLM to 3780 RLM. The project also plans to build a sanitary sewer system in Bodzanów, Chodkowo and Chodkowo-Działki, with a total length of 15.85 km. 1913 new sanitation users will be connected to the new network. (English)
14 October 2020
0 references
Identifiers
POIS.02.03.00-00-0152/16
0 references