Construction of DW along the stretch from junction to ul. Podkarpackie, ul. 9 Warnings for the Piechta in Rzeszów (DK 19) to the Rzeszów — South interchange (S 19) (Q88476): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project involves the construction of a section of the provincial road from the boundary of Rzeszów to national road No 19 (ul.Podkarpackie in Rzeszów, a node and the construction of the junction of the junction of the National Road DK 19 with the reconstruction of the existing infrastructure — operated by the Municipality of Rzeszów.The scope of the investment in question consists of:1) Road traffic — construction of the section W within m...)
(‎Created claim: summary (P836): The subject of the project is the construction of a section of the voivodeship road from the Rzeszów border to national road No. 19 (ul. Podkarpacka in Rzeszów, a junction and expanded in connection with the construction of the junction section of the national road DK 19 together with the reconstruction of the existing infrastructure – implemented by the Municipality of Rzeszów. The scope of the investment is: 1) Roadworks – construction of sect...)
Property / summary
 
The subject of the project is the construction of a section of the voivodeship road from the Rzeszów border to national road No. 19 (ul. Podkarpacka in Rzeszów, a junction and expanded in connection with the construction of the junction section of the national road DK 19 together with the reconstruction of the existing infrastructure – implemented by the Municipality of Rzeszów. The scope of the investment is: 1) Roadworks – construction of section DW within the limits of Rzeszów. 1.54 km, – reconstruction of the urban section of DW -0.51 km, – extension of section DK19 length approx. 0.85 km, – construction of a road junction of WC type on the connection DW and DK19 – construction of 4 intersections of scanned intersection, – reconstruction of the intersection of the junction of the roundabout type at the intersection of DW with ul. Industrial, – construction of 15 sections of service roads, – construction of bus bays, – construction of pavements and bicycle paths – execution of public and individual exits, – construction of drainage system elements, 2) Engineering facilities – construction of the building within DK19, construction of road crossings within the municipal road, construction of culverts and crossings for animals 3) Sewerage- construction and reconstruction of the rain and sanitary sewage system, 4) Green – cutting of existing greenery, necessary for us. 5) Environmental protection devices – construction of acoustic screens, passways for animals, construction of road sewage treatment equipment before entry into receivers. 6) Traffic safety devices- elements of vertical and horizontal marking, protective barriers, pedestrian compartments. 7) Lighting- construction and reconstruction of road lighting, 8) Reconstruction of the existing technical infrastructure- power lines, telecommunications and ICT networks. 9) demolition of buildings that interfere with the investment. This project is a continuation of two projects completed in 2011 with funding from the ROP of the POP: “Construction of the voivodship road connecting the national road S19 with national road No. 9 within ul. Podkarpacka in Rzeszów" – stage I and II. (English)
Property / summary: The subject of the project is the construction of a section of the voivodeship road from the Rzeszów border to national road No. 19 (ul. Podkarpacka in Rzeszów, a junction and expanded in connection with the construction of the junction section of the national road DK 19 together with the reconstruction of the existing infrastructure – implemented by the Municipality of Rzeszów. The scope of the investment is: 1) Roadworks – construction of section DW within the limits of Rzeszów. 1.54 km, – reconstruction of the urban section of DW -0.51 km, – extension of section DK19 length approx. 0.85 km, – construction of a road junction of WC type on the connection DW and DK19 – construction of 4 intersections of scanned intersection, – reconstruction of the intersection of the junction of the roundabout type at the intersection of DW with ul. Industrial, – construction of 15 sections of service roads, – construction of bus bays, – construction of pavements and bicycle paths – execution of public and individual exits, – construction of drainage system elements, 2) Engineering facilities – construction of the building within DK19, construction of road crossings within the municipal road, construction of culverts and crossings for animals 3) Sewerage- construction and reconstruction of the rain and sanitary sewage system, 4) Green – cutting of existing greenery, necessary for us. 5) Environmental protection devices – construction of acoustic screens, passways for animals, construction of road sewage treatment equipment before entry into receivers. 6) Traffic safety devices- elements of vertical and horizontal marking, protective barriers, pedestrian compartments. 7) Lighting- construction and reconstruction of road lighting, 8) Reconstruction of the existing technical infrastructure- power lines, telecommunications and ICT networks. 9) demolition of buildings that interfere with the investment. This project is a continuation of two projects completed in 2011 with funding from the ROP of the POP: “Construction of the voivodship road connecting the national road S19 with national road No. 9 within ul. Podkarpacka in Rzeszów" – stage I and II. (English) / rank
 
Normal rank
Property / summary: The subject of the project is the construction of a section of the voivodeship road from the Rzeszów border to national road No. 19 (ul. Podkarpacka in Rzeszów, a junction and expanded in connection with the construction of the junction section of the national road DK 19 together with the reconstruction of the existing infrastructure – implemented by the Municipality of Rzeszów. The scope of the investment is: 1) Roadworks – construction of section DW within the limits of Rzeszów. 1.54 km, – reconstruction of the urban section of DW -0.51 km, – extension of section DK19 length approx. 0.85 km, – construction of a road junction of WC type on the connection DW and DK19 – construction of 4 intersections of scanned intersection, – reconstruction of the intersection of the junction of the roundabout type at the intersection of DW with ul. Industrial, – construction of 15 sections of service roads, – construction of bus bays, – construction of pavements and bicycle paths – execution of public and individual exits, – construction of drainage system elements, 2) Engineering facilities – construction of the building within DK19, construction of road crossings within the municipal road, construction of culverts and crossings for animals 3) Sewerage- construction and reconstruction of the rain and sanitary sewage system, 4) Green – cutting of existing greenery, necessary for us. 5) Environmental protection devices – construction of acoustic screens, passways for animals, construction of road sewage treatment equipment before entry into receivers. 6) Traffic safety devices- elements of vertical and horizontal marking, protective barriers, pedestrian compartments. 7) Lighting- construction and reconstruction of road lighting, 8) Reconstruction of the existing technical infrastructure- power lines, telecommunications and ICT networks. 9) demolition of buildings that interfere with the investment. This project is a continuation of two projects completed in 2011 with funding from the ROP of the POP: “Construction of the voivodship road connecting the national road S19 with national road No. 9 within ul. Podkarpacka in Rzeszów" – stage I and II. (English) / qualifier
 
point in time: 14 October 2020
Timestamp+2020-10-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:43, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of DW along the stretch from junction to ul. Podkarpackie, ul. 9 Warnings for the Piechta in Rzeszów (DK 19) to the Rzeszów — South interchange (S 19)
Project in Poland financed by DG Regio

    Statements

    0 references
    45,903,591.9 zloty
    0 references
    11,016,862.06 Euro
    13 January 2020
    0 references
    54,004,225.77 zloty
    0 references
    12,961,014.18 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    2 January 2014
    0 references
    28 July 2018
    0 references
    GMINA MIASTO RZESZÓW
    0 references
    0 references
    Przedmiotem projektu jest budowa odcinka drogi wojewódzkiej od granicy Rzeszowa do drogi krajowej nr 19 (ul. Podkarpacka w Rzeszowie, węzeł oraz rozbudowywany w związku z budową węzła odcinek drogi krajowej DK 19 wraz z przebudową istniejącej infrastruktury- realizowany przez Gminę Miasto Rzeszów. Zakres przedmiotowej inwestycji obejmuje: 1) Roboty drogowe - budowa odcinka DW w granicach m. Rzeszowa o dł. 1,54 km, - przebudowa odcinka miejskiego DW -0,51 km, - rozbudowa odcinka DK19 dł. ok. 0.85 km, - budowa węzła drogowego typu WC na połączeniu DW oraz DK19 - budowa 4 skrzyżowań skanalizowanych, - przebudowa skrzyżowania na skrzyżowanie typu rondo na przecięciu DW z ul. Przemysłową, - budowa 15 odcinków dróg serwisowych, - budowa zatoki autobusowej, - budowa chodników oraz ścieżek rowerowych - wykonanie zjazdów publicznych i indywidualnych, - budowa elementów systemu odwodnienia, 2) Obiekty inżynierskie- budowa obiektu w ciągu DK19, budowa przejazdu drogowego w ciągu drogi gminnej, budowa przepustów i przejść dla zwierząt 3) Kanalizacja- budowa i przebudowa sieci kanalizacji deszczowej i sanitarnej, 4) Zieleń - wycinka istniejącej zieleni w niezbędnym zakresie, - nasadzenia. 5) Urządzenia ochrony środowiska- budowa ekranów akustycznych, przejść dla zwierząt, zabudowa urządzeń oczyszczających ścieki drogowe przed wprowadzeniem do odbiorników. 6) Urządzenia bezpieczeństwa ruchu-elementy oznakowania pionowego i poziomego, bariery ochronne, wygrodzenia dla pieszych. 7) Oświetlenie- budowa i przebudowa oświetlenia drogowego, 8) Przebudowa istniejącej infrastruktury technicznej- linie elektroenergetyczne, sieci teletechniczne i teleinformatyczne. 9) Rozbiórki budynków kolidujących z inwestycją. Przedmiotowy projekt jest kontynuacją zakończonych w 2011r. dwóch projektów realizowanych z dofinansowaniem ze środków RPO WP: „Budowa drogi wojewódzkiej łączącej drogę krajową S19 z drogą krajową nr 9 w ciągu ul. Podkarpackiej w Rzeszowie" – etap I i II. (Polish)
    0 references
    The subject of the project is the construction of a section of the voivodeship road from the Rzeszów border to national road No. 19 (ul. Podkarpacka in Rzeszów, a junction and expanded in connection with the construction of the junction section of the national road DK 19 together with the reconstruction of the existing infrastructure – implemented by the Municipality of Rzeszów. The scope of the investment is: 1) Roadworks – construction of section DW within the limits of Rzeszów. 1.54 km, – reconstruction of the urban section of DW -0.51 km, – extension of section DK19 length approx. 0.85 km, – construction of a road junction of WC type on the connection DW and DK19 – construction of 4 intersections of scanned intersection, – reconstruction of the intersection of the junction of the roundabout type at the intersection of DW with ul. Industrial, – construction of 15 sections of service roads, – construction of bus bays, – construction of pavements and bicycle paths – execution of public and individual exits, – construction of drainage system elements, 2) Engineering facilities – construction of the building within DK19, construction of road crossings within the municipal road, construction of culverts and crossings for animals 3) Sewerage- construction and reconstruction of the rain and sanitary sewage system, 4) Green – cutting of existing greenery, necessary for us. 5) Environmental protection devices – construction of acoustic screens, passways for animals, construction of road sewage treatment equipment before entry into receivers. 6) Traffic safety devices- elements of vertical and horizontal marking, protective barriers, pedestrian compartments. 7) Lighting- construction and reconstruction of road lighting, 8) Reconstruction of the existing technical infrastructure- power lines, telecommunications and ICT networks. 9) demolition of buildings that interfere with the investment. This project is a continuation of two projects completed in 2011 with funding from the ROP of the POP: “Construction of the voivodship road connecting the national road S19 with national road No. 9 within ul. Podkarpacka in Rzeszów" – stage I and II. (English)
    14 October 2020
    0 references

    Identifiers

    POPW.02.02.00-18-0004/16
    0 references