Redevelopment and extension of the urban waste water treatment plant (Q85345): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project involves the reconstruction and extension of the existing sewage treatment plant in Chazele.The investment will include the following technologiczne:punkt water catchment, water catchment, a sieve with an averaging tank, a technology building, a WF compartment, a sediment tank, a sediment storage site, a biofilter, a biogas derivative, a biogas compression station, a gas compression station.The project used the stabilisation of sed...)
(‎Created claim: summary (P836): The project involves the reconstruction and expansion of the existing sewage treatment plant in Chorzely. As part of the investment, the following technological facilities will be carried out: waste water catchment point, room with averaging tank, technological building, WKF chamber, sludge tank, sludge storage facility, biofilter, biogas torch, biogas desulphurisation plant, gas compression station. The project uses the stabilisation of sludge...)
Property / summary
 
The project involves the reconstruction and expansion of the existing sewage treatment plant in Chorzely. As part of the investment, the following technological facilities will be carried out: waste water catchment point, room with averaging tank, technological building, WKF chamber, sludge tank, sludge storage facility, biofilter, biogas torch, biogas desulphurisation plant, gas compression station. The project uses the stabilisation of sludge in anaerobic conditions, which allows to reduce the weight of sludge.The problems of wastewater treatment were solved during the automation of the treatment plant. This ensures a high pollution reduction limiting the nuisance of the treatment plant. The project will allow to increase the capacity of the treatment plant.Thanks to this, it will be possible to connect new sewage users, i.e. increasing the degree of scanned mazowieckie voivodship. The aim of the project is to adapt the existing treatment plant to the requirements of Council Directive 91/271/EEC and of 18 November 2014 (OJ 2014, item 1800) on the conditions to be met when sewage is introduced into water or land, and on substances which are particularly harmful to the aquatic environment. The efficiency of the sewage treatment plant in Chorzele will be increased. The current throughput of the treatment plant is 1500 m³/d. (English)
Property / summary: The project involves the reconstruction and expansion of the existing sewage treatment plant in Chorzely. As part of the investment, the following technological facilities will be carried out: waste water catchment point, room with averaging tank, technological building, WKF chamber, sludge tank, sludge storage facility, biofilter, biogas torch, biogas desulphurisation plant, gas compression station. The project uses the stabilisation of sludge in anaerobic conditions, which allows to reduce the weight of sludge.The problems of wastewater treatment were solved during the automation of the treatment plant. This ensures a high pollution reduction limiting the nuisance of the treatment plant. The project will allow to increase the capacity of the treatment plant.Thanks to this, it will be possible to connect new sewage users, i.e. increasing the degree of scanned mazowieckie voivodship. The aim of the project is to adapt the existing treatment plant to the requirements of Council Directive 91/271/EEC and of 18 November 2014 (OJ 2014, item 1800) on the conditions to be met when sewage is introduced into water or land, and on substances which are particularly harmful to the aquatic environment. The efficiency of the sewage treatment plant in Chorzele will be increased. The current throughput of the treatment plant is 1500 m³/d. (English) / rank
 
Normal rank
Property / summary: The project involves the reconstruction and expansion of the existing sewage treatment plant in Chorzely. As part of the investment, the following technological facilities will be carried out: waste water catchment point, room with averaging tank, technological building, WKF chamber, sludge tank, sludge storage facility, biofilter, biogas torch, biogas desulphurisation plant, gas compression station. The project uses the stabilisation of sludge in anaerobic conditions, which allows to reduce the weight of sludge.The problems of wastewater treatment were solved during the automation of the treatment plant. This ensures a high pollution reduction limiting the nuisance of the treatment plant. The project will allow to increase the capacity of the treatment plant.Thanks to this, it will be possible to connect new sewage users, i.e. increasing the degree of scanned mazowieckie voivodship. The aim of the project is to adapt the existing treatment plant to the requirements of Council Directive 91/271/EEC and of 18 November 2014 (OJ 2014, item 1800) on the conditions to be met when sewage is introduced into water or land, and on substances which are particularly harmful to the aquatic environment. The efficiency of the sewage treatment plant in Chorzele will be increased. The current throughput of the treatment plant is 1500 m³/d. (English) / qualifier
 
point in time: 14 October 2020
Timestamp+2020-10-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:36, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Redevelopment and extension of the urban waste water treatment plant
Project in Poland financed by DG Regio

    Statements

    0 references
    9,417,208.65 zloty
    0 references
    2,260,130.08 Euro
    13 January 2020
    0 references
    11,079,069.0 zloty
    0 references
    2,658,976.56 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2020
    0 references
    GMINA CHORZELE
    0 references
    0 references
    Projekt obejmuje przebudowę i rozbudowę istniejącej oczyszczalni ścieków w Chorzelach. W ramach inwestycji wykonane zostaną następujące obiekty technologiczne:punkt zlewny ścieków,sito ze zbiornikiem uśredniającym,budynek technologiczny, komora WKF,zbiornik osadu,plac składowania osadu,biofiltr,pochodnia biogazowa,odsiarczalnia biogazu,stacja sprężania gazu. W projekcie zastosowano stabilizację osadów w warunkach beztlenowych pozwalającą na zmniejszenie masy osadu.Rozwiązano zagadnienia oczyszczania ścieków przy automatyzacji pracy oczyszczalni. Gwarantuje to wysoką redukcję zanieczyszczeń ograniczając uciążliwość oczyszczalni. Projekt pozwoli na zwiększenie przepustowości oczyszczalni.Dzięki temu będzie możliwość podłączenia nowych użytkowników kanalizacji tj. zwiększenie stopnia skanalizowani woj.mazowieckiego. Celem projektu jest dostosowanie istniejącej oczyszczalni do wymogów Dyrektywy Rady91/271/EWG i Rozp. z dnia 18 listopada 2014r.(Dz.U.2014 poz.1800)w sprawie warunków,jakie należy spełnić przy wprowadzaniu ścieków do wód lub ziemi,oraz w sprawie substancji szczególnie szkodliwych dla środowiska wodnego. Zwiększy się wydajność oczyszczalni ścieków w miejscowości Chorzele. Aktualna przepustowość oczyszczalni wynosi 1500m3/d. (Polish)
    0 references
    The project involves the reconstruction and expansion of the existing sewage treatment plant in Chorzely. As part of the investment, the following technological facilities will be carried out: waste water catchment point, room with averaging tank, technological building, WKF chamber, sludge tank, sludge storage facility, biofilter, biogas torch, biogas desulphurisation plant, gas compression station. The project uses the stabilisation of sludge in anaerobic conditions, which allows to reduce the weight of sludge.The problems of wastewater treatment were solved during the automation of the treatment plant. This ensures a high pollution reduction limiting the nuisance of the treatment plant. The project will allow to increase the capacity of the treatment plant.Thanks to this, it will be possible to connect new sewage users, i.e. increasing the degree of scanned mazowieckie voivodship. The aim of the project is to adapt the existing treatment plant to the requirements of Council Directive 91/271/EEC and of 18 November 2014 (OJ 2014, item 1800) on the conditions to be met when sewage is introduced into water or land, and on substances which are particularly harmful to the aquatic environment. The efficiency of the sewage treatment plant in Chorzele will be increased. The current throughput of the treatment plant is 1500 m³/d. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.02.03.00-00-0108/16
    0 references