Cleaning up the water and sewage water management in the town and municipality of Uzdrowisko Muszyna (Q85300): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): 1.Reconstruction and extension of the wastewater treatment plant in Muszyna 2.Renovation and extension of the water supply “Jańczyk” and “Szczawnik” and the “Jańczyk” 3 water purification plant.Development of water supply network ul.Pozna, ul.4.Renovation/replacement of the existing water supply network together with connections in Muszyna and the village of Złokie, together with the Equalisation reservoir “Malnik” 5.Renovation/replacement of...)
Property / summary
1.Reconstruction and extension of the wastewater treatment plant in Muszyna 2.Renovation and extension of the water supply “Jańczyk” and “Szczawnik” and the “Jańczyk” 3 water purification plant.Development of water supply network ul.Pozna, ul.4.Renovation/replacement of the existing water supply network together with connections in Muszyna and the village of Złokie, together with the Equalisation reservoir “Malnik” 5.Renovation/replacement of the existing sewer network with connections to Muszyna and to the villages of return, Złównik 6.Renovation of the existing sewage pumping station at ul.Livre in Muszyna 7.Car supply:for the carriage of non-purity liquids, for cleaning the sewage system together with the inspection camera, specialised car (English)
 
Property / summary: 1.Reconstruction and extension of the wastewater treatment plant in Muszyna 2.Renovation and extension of the water supply “Jańczyk” and “Szczawnik” and the “Jańczyk” 3 water purification plant.Development of water supply network ul.Pozna, ul.4.Renovation/replacement of the existing water supply network together with connections in Muszyna and the village of Złokie, together with the Equalisation reservoir “Malnik” 5.Renovation/replacement of the existing sewer network with connections to Muszyna and to the villages of return, Złównik 6.Renovation of the existing sewage pumping station at ul.Livre in Muszyna 7.Car supply:for the carriage of non-purity liquids, for cleaning the sewage system together with the inspection camera, specialised car (English) / rank
Normal rank
 

Revision as of 15:35, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Cleaning up the water and sewage water management in the town and municipality of Uzdrowisko Muszyna
Project in Poland financed by DG Regio

    Statements

    0 references
    39,614,038.11 zloty
    0 references
    9,507,369.15 Euro
    13 January 2020
    0 references
    46,604,750.72 zloty
    0 references
    11,185,140.17 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2016
    0 references
    31 December 2020
    0 references
    PRZEDSIĘBIORSTWO GOSPODARKI KOMUNALNEJ SP. Z O.O. W MUSZYNIE
    0 references
    0 references
    0 references
    1. Przebudowa i rozbudowa oczyszczalni ścieków w Muszynie 2. Remont i rozbudowa ujęć wody "Jasieńczyk" i "Szczawnik" oraz stacji uzdatniania wody "Jasieńczyk" 3. Rozbudowa sieci wodociągowej ul. Polnej, ul. Słonecznej w Muszynie 4. Remont/wymiana istniejącej sieci wodociągowej wraz z przyłączeniami w Muszynie oraz miejscowości Złockie wraz ze zbiornikiem wyrównawczym "Malnik" 5. Remont/wymiana istniejącej sieci kanalizacyjnej wraz z przyłączami w Muszynie oraz miejscowościach Powroźnik, Złockie, Szczawnik 6. Remont istniejącej przepompowni ścieków przy ul. Lipowej w Muszynie 7. Dostawa samochodów: do przewozu nieczystości płynnych, samochodu do czyszczenia kanalizacji wraz z kamerą do inspekcji, samochodu specjalistycznego (Polish)
    0 references

    Identifiers

    POIS.02.03.00-00-0081/16
    0 references