Tworóg-Tworzeń pipeline (Q86134): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Removed claim: summary (P836): The project consists of the construction of an ILO 8,4MPa DN1000 pipeline on the section from the designed hub of Tworóg (implemented as part of the Kędzierzyn project):Voivodship śląskie, Polnocnoski District) attached to a containment team — Twordfish (Silesian Region, city of Dąbrowa Górnicza) and infrastructure:5 Systems for the pipeline route, the cathode-ray protection equipment, the communication and control equipment, the optical line,...)
Property / summary
The project consists of the construction of an ILO 8,4MPa DN1000 pipeline on the section from the designed hub of Tworóg (implemented as part of the Kędzierzyn project):Voivodship śląskie, Polnocnoski District) attached to a containment team — Twordfish (Silesian Region, city of Dąbrowa Górnicza) and infrastructure:5 Systems for the pipeline route, the cathode-ray protection equipment, the communication and control equipment, the optical line, energy connections. (English)
 
Property / summary: The project consists of the construction of an ILO 8,4MPa DN1000 pipeline on the section from the designed hub of Tworóg (implemented as part of the Kędzierzyn project):Voivodship śląskie, Polnocnoski District) attached to a containment team — Twordfish (Silesian Region, city of Dąbrowa Górnicza) and infrastructure:5 Systems for the pipeline route, the cathode-ray protection equipment, the communication and control equipment, the optical line, energy connections. (English) / rank
Normal rank
 

Revision as of 15:33, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Tworóg-Tworzeń pipeline
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    218,673,195.0 zloty
    0 references
    52,481,566.8 Euro
    13 January 2020
    0 references
    1 January 2014
    0 references
    30 September 2021
    0 references
    OPERATOR GAZOCIĄGÓW PRZESYŁOWYCH GAZ-SYSTEM S.A.
    0 references
    0 references

    50°26'38.8"N, 19°7'26.8"E
    0 references

    50°28'15.6"N, 19°13'54.8"E
    0 references

    50°22'8.8"N, 19°17'23.6"E
    0 references

    50°29'39.5"N, 18°57'51.1"E
    0 references

    50°27'50.0"N, 19°2'34.1"E
    0 references

    50°27'55.4"N, 18°50'1.0"E
    0 references

    50°31'54.8"N, 18°43'7.3"E
    0 references
    Przedmiotem projektu jest budowa gazociągu DN1000 MOP 8,4MPa o długości 55 km na odcinku od projektowanego węzła Tworóg (realizowanego w ramach projektu Kędzierzyn – Tworóg: województwo śląskie, powiat tarnogórski) do zespołu zaporowo - upustowego Tworzeń (województwo śląskie, miasto Dąbrowa Górnicza) wraz z infrastrukturą: 5 zespołów zaporowo-upustowych na trasie gazociągu, urządzenia ochrony katodowej, system łączności i sterowania – linia światłowodowa, przyłącza energetyczne. (Polish)
    0 references

    Identifiers

    POIS.07.01.00-00-0016/17
    0 references