Construction of the Ostrołęka — Stanisławów line, together with the construction of the station of the Wyszkow station and the expansion of the station within that line line (Q86104): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project consists of the construction of a 400 kV high-voltage double voltage power line of 110 km (220 km of the current network) on the Ostrołęka — Stanisławów line.In this section, one station 400 (220)/110 kV Wyszków and an extended two stations will be built:400/220/110 kV Ostrołęka and 400 kV Stanisławów.The project aims to improve the safety and security of the National Power System in the north-eastern part of Poland, improve the se...)
(‎Created claim: summary (P836): The subject of the project is the construction of a two-track high voltage power line of 400 kV with a length of 110 km (220 km of electricity network) on the Ostrołęka-Stanisławów section. In this section, one station 400 (220)/110 kV Wyszków will be built and two stations will be expanded: 400/220/110 kV Ostrołęka and 400 kV Stanisławów. The aim of the project is to improve the safety and safety of the National Power System in the north-easter...)
Property / summary
 
The subject of the project is the construction of a two-track high voltage power line of 400 kV with a length of 110 km (220 km of electricity network) on the Ostrołęka-Stanisławów section. In this section, one station 400 (220)/110 kV Wyszków will be built and two stations will be expanded: 400/220/110 kV Ostrołęka and 400 kV Stanisławów. The aim of the project is to improve the safety and safety of the National Power System in the north-eastern part of Poland, to improve the power supply of the Warsaw agglomeration and the 110 kV network The indirect objective of the project is: a) creating the conditions for increasing the possibility of electricity exchanges with the Lithuanian electricity system while ensuring the safe operation of this connection (b) creating the conditions for power decommissioning from conventional and renewable energy sources (English)
Property / summary: The subject of the project is the construction of a two-track high voltage power line of 400 kV with a length of 110 km (220 km of electricity network) on the Ostrołęka-Stanisławów section. In this section, one station 400 (220)/110 kV Wyszków will be built and two stations will be expanded: 400/220/110 kV Ostrołęka and 400 kV Stanisławów. The aim of the project is to improve the safety and safety of the National Power System in the north-eastern part of Poland, to improve the power supply of the Warsaw agglomeration and the 110 kV network The indirect objective of the project is: a) creating the conditions for increasing the possibility of electricity exchanges with the Lithuanian electricity system while ensuring the safe operation of this connection (b) creating the conditions for power decommissioning from conventional and renewable energy sources (English) / rank
 
Normal rank
Property / summary: The subject of the project is the construction of a two-track high voltage power line of 400 kV with a length of 110 km (220 km of electricity network) on the Ostrołęka-Stanisławów section. In this section, one station 400 (220)/110 kV Wyszków will be built and two stations will be expanded: 400/220/110 kV Ostrołęka and 400 kV Stanisławów. The aim of the project is to improve the safety and safety of the National Power System in the north-eastern part of Poland, to improve the power supply of the Warsaw agglomeration and the 110 kV network The indirect objective of the project is: a) creating the conditions for increasing the possibility of electricity exchanges with the Lithuanian electricity system while ensuring the safe operation of this connection (b) creating the conditions for power decommissioning from conventional and renewable energy sources (English) / qualifier
 
point in time: 14 October 2020
Timestamp+2020-10-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:32, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the Ostrołęka — Stanisławów line, together with the construction of the station of the Wyszkow station and the expansion of the station within that line line
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    39,870,000.0 zloty
    0 references
    9,568,800.0 Euro
    13 January 2020
    0 references
    134,661,763.77 zloty
    0 references
    32,318,823.3 Euro
    13 January 2020
    0 references
    29.61 percent
    0 references
    1 January 2014
    0 references
    31 December 2023
    0 references
    POLSKIE SIECI ELEKTROENERGETYCZNE S.A
    0 references

    52°9'25.2"N, 21°37'36.5"E
    0 references

    52°56'55.7"N, 21°45'31.3"E
    0 references

    53°4'40.8"N, 21°34'29.6"E
    0 references

    52°47'26.2"N, 19°51'23.0"E
    0 references

    52°29'13.9"N, 21°33'49.7"E
    0 references

    52°36'16.6"N, 21°28'5.9"E
    0 references
    Przedmiotem projektu jest budowa dwutorowej linii elektroenergetycznej wysokiego napięcia 400kV o długości 110 km (220 km sieci prądowej) na odcinku Ostrołęka - Stanisławów. W tym odcinku zostanie wybudowana jedna stacja 400 (220)/110 kV Wyszków i rozbudowane dwie stacje: 400/220/110 kV Ostrołęka oraz 400 kV Stanisławów. Celem Projektu jest poprawa pewności i bezpieczeństwa pracy Krajowego Systemu Elektroenergetycznego w północno-wschodniej części Polski, poprawa pewności zasilania aglomeracji warszawskiej oraz sieci 110 kV Pośrednim celem Projektu jest: a) stworzenie warunków do zwiększenia możliwości wymiany energii elektrycznej z litewskim systemem elektroenergetycznym przy zapewnieniu bezpiecznej pracy tego połączenia b) stworzenie warunków do wyprowadzenia mocy z konwencjonalnych i odnawialnych źródeł energii (Polish)
    0 references
    The subject of the project is the construction of a two-track high voltage power line of 400 kV with a length of 110 km (220 km of electricity network) on the Ostrołęka-Stanisławów section. In this section, one station 400 (220)/110 kV Wyszków will be built and two stations will be expanded: 400/220/110 kV Ostrołęka and 400 kV Stanisławów. The aim of the project is to improve the safety and safety of the National Power System in the north-eastern part of Poland, to improve the power supply of the Warsaw agglomeration and the 110 kV network The indirect objective of the project is: a) creating the conditions for increasing the possibility of electricity exchanges with the Lithuanian electricity system while ensuring the safe operation of this connection (b) creating the conditions for power decommissioning from conventional and renewable energy sources (English)
    14 October 2020
    0 references

    Identifiers

    POIS.07.01.00-00-0002/18
    0 references