Sustainable urban transport system in Gorzów Wlkp. — tramway rolling stock and technical infrastructure (Q86075): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
(‎Changed label, description and/or aliases in 1 language: translated_label)
label / enlabel / en
 
Sustainable urban transport system in Gorzów Wlkp. — tramway rolling stock and technical infrastructure

Revision as of 15:31, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Sustainable urban transport system in Gorzów Wlkp. — tramway rolling stock and technical infrastructure
Project in Poland financed by DG Regio

    Statements

    0 references
    74,623,730.78 zloty
    0 references
    17,909,695.39 Euro
    13 January 2020
    0 references
    100,131,196.96 zloty
    0 references
    24,031,487.27 Euro
    13 January 2020
    0 references
    74.53 percent
    0 references
    26 February 2016
    0 references
    31 December 2019
    0 references
    MIEJSKI ZAKŁAD KOMUNIKACJI W GORZOWIE WIELKOPOLSKIM SP. Z O.O.
    0 references
    0 references
    0 references

    52°43'50.2"N, 15°12'38.9"E
    0 references
    Projekt obejmuje m.in.: 1. Zakup 14 nowych wagonów tramwajowych, Zadanie obejmuje zakup 14 fabrycznie nowych, dwukierunkowych wagonów tramwajowych o długości od 23 do 26 m. Wagony będą trójczłonowe, niskopodłogowe napędzane silnikami prądu przemiennego ze sterowaniem elektronicznym. 2. Modernizację hali tramwajowej i stacji obsługi, system monitoringu torów odstawczych, ? Zakres rzeczowy zadania przewiduje: ? myjnia do mycia ciśnieniowego części i podzespołów tramwajowych, ? myjnia do mycia podzespołów tramwajowych wielkogabarytowych, ? myjnia mechaniczna do mycia tramwajów, ? instalacja zapiaszczania, ? pomost do przeglądów i napraw aparatury na dachach tramwajów, ? urządzenie dźwigowe do przenoszenia aparatury i urządzeń montowanych/demontowanych na dachach wagonów, ? pomost do przeglądów i napraw aparatury na dachach tramwajów. ? urządzenie dźwigowe do przenoszenia aparatury i urządzeń montowanych/demontowanych na dachach wagonów. ? system ochrony obwodowej i monitoringu placu tramwajowego. ? ocieplenie ścian zewnętrznych wraz z remontem stropu i ścian wewnętrznych. (Polish)
    0 references
    The project includes, among others: 1. Purchase of 14 new tram wagons, The task includes the purchase of 14 brand-new two-way tram wagons with a length of 23 to 26 m. Wagons will be three-piece, low floor driven by AC motors with electronic control. 2. Modernisation of the tram hall and service stations, the system of monitoring of stairways? The material scope of the task is to: Washing of pressure parts and tram components, washing of large tram components, washing machine for tram washing, installation of sanding, bridge for maintenance and repair of equipment on the roofs of trams, lifting equipment for carrying equipment and equipment installed/reassembled on the roofs of trams, platform for maintenance and repair of equipment on the roofs of trams. Lifting device for carrying apparatus and equipment mounted/reassembled on the roofs of wagons. System of perimeter protection and monitoring of tram square. Warming of the outer walls together with renovation of the ceiling and interior walls. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.06.01.00-00-0028/16
    0 references