To provide access to broadband internet in the area of a fibre-optic technology in the area of Chodzież district. (Q86895): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project will be implemented in the area of POP01_301161 (Wielkopolskie province, poważieski) where 2114 households have been identified and which do not have access to the NGA Internet.For this area, there is a minimum number of connections to be attached as part of the project at level 1136 and “Number of education establishments and health facilities to be connected to the area of intervention” in a quantity of 1.The maximum amount of th...)
(‎Created claim: summary (P836): The project will be implemented in the area of POPC01_301161 (Wielkopolskie Voivodeship, ob. raneski), which identified 2114 gosp. house., which do not have access to the NGA Internet. For the above area, the number of connections to be made in the project at the level of 1136 units and the “Number of educational establishments and health services to be connected in the intervention area” were defined in the amount of 1 units. The maximum amount...)
Property / summary
 
The project will be implemented in the area of POPC01_301161 (Wielkopolskie Voivodeship, ob. raneski), which identified 2114 gosp. house., which do not have access to the NGA Internet. For the above area, the number of connections to be made in the project at the level of 1136 units and the “Number of educational establishments and health services to be connected in the intervention area” were defined in the amount of 1 units. The maximum amount of the project is PLN 3,537,013.00 and the support intensity – 60 % of the qualifier. As part of the planned investment, the applicant: — will build a network with a length of 55.87 km, – will cover the network coverage of 1356 gosp. house. – will cover the network coverage 1 educational institution/health care facility,- will create 2 nodes access. The project will be implemented for 24 months – from 01.07.2016 to 30.06.2018. The planned work is divided into 7 tasks. Task 1 and 2 will be carried out before the start of the project and will include: — preparation. document. necessary to submit an application for dofin.,- selection of the contractor. By choosing network construction technology, the contractor considered:- performance,- reliability,- scalability and complementarity,- operating costs,- functionality and ease of management.The indicated factors have determined the choice of FTTH technology as a technology to be used to build this network. The project will be carried out in the “design and build” mode – all design, construction and installation works will be commissioned to the contractor selected as part of collecting offers.In order to properly implement the project, a “Project Team” will be created, whose task will be:-Monitors of the implementation of the project in accordance with harmonogr. (English)
Property / summary: The project will be implemented in the area of POPC01_301161 (Wielkopolskie Voivodeship, ob. raneski), which identified 2114 gosp. house., which do not have access to the NGA Internet. For the above area, the number of connections to be made in the project at the level of 1136 units and the “Number of educational establishments and health services to be connected in the intervention area” were defined in the amount of 1 units. The maximum amount of the project is PLN 3,537,013.00 and the support intensity – 60 % of the qualifier. As part of the planned investment, the applicant: — will build a network with a length of 55.87 km, – will cover the network coverage of 1356 gosp. house. – will cover the network coverage 1 educational institution/health care facility,- will create 2 nodes access. The project will be implemented for 24 months – from 01.07.2016 to 30.06.2018. The planned work is divided into 7 tasks. Task 1 and 2 will be carried out before the start of the project and will include: — preparation. document. necessary to submit an application for dofin.,- selection of the contractor. By choosing network construction technology, the contractor considered:- performance,- reliability,- scalability and complementarity,- operating costs,- functionality and ease of management.The indicated factors have determined the choice of FTTH technology as a technology to be used to build this network. The project will be carried out in the “design and build” mode – all design, construction and installation works will be commissioned to the contractor selected as part of collecting offers.In order to properly implement the project, a “Project Team” will be created, whose task will be:-Monitors of the implementation of the project in accordance with harmonogr. (English) / rank
 
Normal rank
Property / summary: The project will be implemented in the area of POPC01_301161 (Wielkopolskie Voivodeship, ob. raneski), which identified 2114 gosp. house., which do not have access to the NGA Internet. For the above area, the number of connections to be made in the project at the level of 1136 units and the “Number of educational establishments and health services to be connected in the intervention area” were defined in the amount of 1 units. The maximum amount of the project is PLN 3,537,013.00 and the support intensity – 60 % of the qualifier. As part of the planned investment, the applicant: — will build a network with a length of 55.87 km, – will cover the network coverage of 1356 gosp. house. – will cover the network coverage 1 educational institution/health care facility,- will create 2 nodes access. The project will be implemented for 24 months – from 01.07.2016 to 30.06.2018. The planned work is divided into 7 tasks. Task 1 and 2 will be carried out before the start of the project and will include: — preparation. document. necessary to submit an application for dofin.,- selection of the contractor. By choosing network construction technology, the contractor considered:- performance,- reliability,- scalability and complementarity,- operating costs,- functionality and ease of management.The indicated factors have determined the choice of FTTH technology as a technology to be used to build this network. The project will be carried out in the “design and build” mode – all design, construction and installation works will be commissioned to the contractor selected as part of collecting offers.In order to properly implement the project, a “Project Team” will be created, whose task will be:-Monitors of the implementation of the project in accordance with harmonogr. (English) / qualifier
 
point in time: 14 October 2020
Timestamp+2020-10-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:27, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
To provide access to broadband internet in the area of a fibre-optic technology in the area of Chodzież district.
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    3,534,529.7 zloty
    0 references
    848,287.13 Euro
    13 January 2020
    0 references
    5,979,580.0 zloty
    0 references
    1,435,099.2 Euro
    13 January 2020
    0 references
    59.11 percent
    0 references
    29 February 2016
    0 references
    30 June 2018
    0 references
    ASTA-NET SPÓŁKA AKCYJNA
    0 references
    0 references

    52°53'27.2"N, 16°59'1.0"E
    0 references

    52°59'42.0"N, 16°55'11.6"E
    0 references

    53°2'39.5"N, 16°47'26.2"E
    0 references

    52°58'23.9"N, 17°5'41.6"E
    0 references

    53°1'46.2"N, 17°7'23.9"E
    0 references
    Projekt będzie realizowany na obszarze POPC01_301161 (woj. wielkopolskie, pow. chodzieski), na którym zidentyfikowano 2114 gosp. dom., które nie posiadają dostępu do Internetu NGA. Dla powyższego obszaru wyznaczono min. liczbę przyłączy jakie należy wykonać w ramach projektu na poziomie 1136 szt. oraz „Liczbę placówek eduk. i placówek służby zdrowia do podłączenia na obszarze interwencji” w ilości 1 szt. Maksymalna kwota dofi. projektu wynosi 3.537.013,00 zł, a intensywność wsparcia - 60% wyd. kwalifik. W ramach planowanej inwestycji Wnioskodawca: - wybuduje sieć o długości 55,87 km, - obejmie zasięgiem sieci 1356 gosp. dom., - obejmie zasięgiem sieci 1 placówkę edukacyjną / placówkę służby zdrowia,- utworzy 2 węzły dostęp. sieci. Projekt będzie realizowany przez 24 miesiące – od 01.07.2016 r. do 30.06.2018 r. Zaplanowane prace podzielono na 7 zadań. Zadanie 1 i 2 będą realizowane przed rozpoczęciem projektu i obejmą: - przygot. dokument. niezbędnej do złożenia wniosku o dofin.,- wybór wykonawcy. Dobierając technologię budowy sieci, wykonawca brał pod uwagę:- wydajność,- niezawodność,- skalowalność i komplementarność,- koszty eksploatacji,- funkcjonalność i łatwość zarządzania.Wskazane czynniki zadecydowały o wyborze technologii FTTH, jako technologii, która zostanie wykorzystana do budowy przedmiotowej sieci. Projekt będzie realizowany w trybie „zaprojektuj i wybuduj” - wszystkie prace projektowe, budowlane i instalacyjne zostaną zlecone wyłonionemu w ramach zbierania ofert wykonawcy.W celu prawidłowej realizacji projektu powstanie „Zespół projektowy”, którego zadaniem będzie:-monit. przebiegu realizacji inwestycji zgodnie z harmonogr.,- dokonywanie odbiorów prac,-rozliczanie projektu.W skład zespołu projektowego wejdą pracownicy:- Wnioskodawcy - 4 os.- firmy ARVADO Consulting – 1 os. (Polish)
    0 references
    The project will be implemented in the area of POPC01_301161 (Wielkopolskie Voivodeship, ob. raneski), which identified 2114 gosp. house., which do not have access to the NGA Internet. For the above area, the number of connections to be made in the project at the level of 1136 units and the “Number of educational establishments and health services to be connected in the intervention area” were defined in the amount of 1 units. The maximum amount of the project is PLN 3,537,013.00 and the support intensity – 60 % of the qualifier. As part of the planned investment, the applicant: — will build a network with a length of 55.87 km, – will cover the network coverage of 1356 gosp. house. – will cover the network coverage 1 educational institution/health care facility,- will create 2 nodes access. The project will be implemented for 24 months – from 01.07.2016 to 30.06.2018. The planned work is divided into 7 tasks. Task 1 and 2 will be carried out before the start of the project and will include: — preparation. document. necessary to submit an application for dofin.,- selection of the contractor. By choosing network construction technology, the contractor considered:- performance,- reliability,- scalability and complementarity,- operating costs,- functionality and ease of management.The indicated factors have determined the choice of FTTH technology as a technology to be used to build this network. The project will be carried out in the “design and build” mode – all design, construction and installation works will be commissioned to the contractor selected as part of collecting offers.In order to properly implement the project, a “Project Team” will be created, whose task will be:-Monitors of the implementation of the project in accordance with harmonogr. (English)
    14 October 2020
    0 references

    Identifiers

    POPC.01.01.00-30-0275/16
    0 references