(‎Removed claim: summary (P836): The project will consist of the construction of a fibre optic network and the provision of broadband internet with guaranteed speeds of at least 30 Mbps in the areas that are digitally excluded in the intervening area — PILSKIM.The project will be carried out in terrestrial technology. the project will be arranged in teletechnical sewerage.The duration of the project is foreseen for 36 months.As part of the project, a fibre network infrastruct...)
(‎Created claim: summary (P836): The project will consist of building a fibre network and providing access to broadband Internet with guaranteed capacity of at least 30 Mbps in areas excluded digitally in the Intervention Area – PILSKI.The project will be made in ground technology – the cables will be arranged in telecommunication sewerage. The implementation period of the project is planned for 36 months. As part of the project, infrastructure will be built in the form of fibr...)
Property / summary
 
The project will consist of building a fibre network and providing access to broadband Internet with guaranteed capacity of at least 30 Mbps in areas excluded digitally in the Intervention Area – PILSKI.The project will be made in ground technology – the cables will be arranged in telecommunication sewerage. The implementation period of the project is planned for 36 months. As part of the project, infrastructure will be built in the form of fibre optic networks, together with all necessary equipment, in accordance with NGA network technology. The network will be built according to the assumptions of the technical concept.The planned works are divided into 7 tasks. Implementation of the investment in the established form will allow for realisation of the objectives of the Operational Programme Digital Poland, action1.1. The aim of this action is to eliminate territorial gaps in high-speed broadband opportunities. The project will result in a broadband network, allowing the provision of high-speed services in areas that have been demonstrated as an intervention area, i.e. digitally excluded. The intervention areas have been identified as a result of an inventory carried out by the President of the Office for Electronic Communications.As part of the planned investment, the applicant:• will build a broadband network with a total length of 806.69 km,• will cover the network coverage of 17 205 households,• connect to the network 112 educational units,• create 15 network access nodes. (English)
Property / summary: The project will consist of building a fibre network and providing access to broadband Internet with guaranteed capacity of at least 30 Mbps in areas excluded digitally in the Intervention Area – PILSKI.The project will be made in ground technology – the cables will be arranged in telecommunication sewerage. The implementation period of the project is planned for 36 months. As part of the project, infrastructure will be built in the form of fibre optic networks, together with all necessary equipment, in accordance with NGA network technology. The network will be built according to the assumptions of the technical concept.The planned works are divided into 7 tasks. Implementation of the investment in the established form will allow for realisation of the objectives of the Operational Programme Digital Poland, action1.1. The aim of this action is to eliminate territorial gaps in high-speed broadband opportunities. The project will result in a broadband network, allowing the provision of high-speed services in areas that have been demonstrated as an intervention area, i.e. digitally excluded. The intervention areas have been identified as a result of an inventory carried out by the President of the Office for Electronic Communications.As part of the planned investment, the applicant:• will build a broadband network with a total length of 806.69 km,• will cover the network coverage of 17 205 households,• connect to the network 112 educational units,• create 15 network access nodes. (English) / rank
 
Normal rank
Property / summary: The project will consist of building a fibre network and providing access to broadband Internet with guaranteed capacity of at least 30 Mbps in areas excluded digitally in the Intervention Area – PILSKI.The project will be made in ground technology – the cables will be arranged in telecommunication sewerage. The implementation period of the project is planned for 36 months. As part of the project, infrastructure will be built in the form of fibre optic networks, together with all necessary equipment, in accordance with NGA network technology. The network will be built according to the assumptions of the technical concept.The planned works are divided into 7 tasks. Implementation of the investment in the established form will allow for realisation of the objectives of the Operational Programme Digital Poland, action1.1. The aim of this action is to eliminate territorial gaps in high-speed broadband opportunities. The project will result in a broadband network, allowing the provision of high-speed services in areas that have been demonstrated as an intervention area, i.e. digitally excluded. The intervention areas have been identified as a result of an inventory carried out by the President of the Office for Electronic Communications.As part of the planned investment, the applicant:• will build a broadband network with a total length of 806.69 km,• will cover the network coverage of 17 205 households,• connect to the network 112 educational units,• create 15 network access nodes. (English) / qualifier
 
point in time: 14 October 2020
Timestamp+2020-10-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:27, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Providing access to broadband Internet technology in the North Wielkopolski area
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    27,229,437.78 zloty
    0 references
    6,535,065.07 Euro
    13 January 2020
    0 references
    32,034,632.71 zloty
    0 references
    7,688,311.85 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 October 2017
    0 references
    30 September 2020
    0 references
    ASTA-NET SPÓŁKA AKCYJNA
    0 references
    0 references

    52°53'27.2"N, 16°59'1.0"E
    0 references

    52°59'42.0"N, 16°55'11.6"E
    0 references

    53°2'39.5"N, 16°47'26.2"E
    0 references

    52°58'23.9"N, 17°5'41.6"E
    0 references

    52°54'4.0"N, 16°34'21.4"E
    0 references

    52°53'19.7"N, 16°35'24.4"E
    0 references

    52°51'15.8"N, 16°1'49.1"E
    0 references

    52°52'46.6"N, 16°0'51.1"E
    0 references

    52°50'53.5"N, 16°31'27.5"E
    0 references

    52°47'58.9"N, 16°44'3.1"E
    0 references

    53°2'30.5"N, 16°27'40.0"E
    0 references

    52°53'39.5"N, 16°10'16.7"E
    0 references

    53°5'59.6"N, 17°7'22.1"E
    0 references

    53°6'7.9"N, 16°52'56.3"E
    0 references

    53°15'37.1"N, 17°15'17.3"E
    0 references

    53°5'48.5"N, 17°0'23.4"E
    0 references

    53°8'4.9"N, 16°45'9.7"E
    0 references

    53°9'45.4"N, 16°36'43.2"E
    0 references

    53°3'11.5"N, 16°43'56.6"E
    0 references

    53°9'25.2"N, 17°15'45.7"E
    0 references

    53°10'58.4"N, 17°4'46.9"E
    0 references

    52°50'23.6"N, 17°29'58.2"E
    0 references

    52°56'35.5"N, 17°18'0.0"E
    0 references

    52°44'37.3"N, 17°19'46.2"E
    0 references

    52°40'21.4"N, 17°9'11.2"E
    0 references

    52°54'40.3"N, 17°28'19.2"E
    0 references

    52°48'43.9"N, 17°12'6.8"E
    0 references

    52°49'14.9"N, 17°25'4.1"E
    0 references

    53°25'13.4"N, 16°48'59.4"E
    0 references

    53°17'49.6"N, 16°59'27.6"E
    0 references

    53°29'44.9"N, 17°15'0.7"E
    0 references

    53°32'5.3"N, 16°51'5.8"E
    0 references

    53°20'30.1"N, 16°50'52.1"E
    0 references

    53°24'46.4"N, 17°8'43.1"E
    0 references

    53°21'33.1"N, 17°2'37.7"E
    0 references
    Projekt będzie polegał na wybudowaniu sieci światłowodowej oraz zapewnieniu dostępu do szerokopasmowego Internetu o gwarantowanej przepustowości min. 30 Mb/s na obszarach wykluczonych cyfrowo na Obszarze Interwencyjnym – PILSKIM.Projekt wykonany będzie w technologii doziemnej– kable zostaną ułożone w kanalizacji teletechnicznej. Okres realizacji projektu przewidziany jest na 36 miesięcy. W ramach realizacji projektu zostanie wybudowana infrastruktura w postaci sieci światłowodowej wraz ze wszystkimi niezbędnymi urządzeniami,zgodnie z technologią sieci NGA. Sieć zostanie wybudowana zgodnie z założeniami koncepcji technicznej.Zaplanowane prace podzielono na 7 zadań. Realizacja inwestycji w założonym kształcie pozwoli na zrealizowanie założeń Programu Operacyjnego Polska Cyfrowa, działanie1.1. Działanie to ma na celu wyeliminowanie terytorialnych różnic w możliwości dostępu do szerokopasmowego Internetu o wysokich przepustowościach. Wynikiem realizacji projektu będzie sieć szerokopasmowa, pozwalająca na świadczenie usług z dużymi prędkościami, na terenach,które zostały wykazane jako obszar interwencyjny, czyli wykluczony cyfrowo. Obszary interwencyjne zostały zidentyfikowane w wyniku inwentaryzacji przeprowadzonej przez Prezesa Urzędu Komunikacji Elektronicznej.W ramach planowanej inwestycji Wnioskodawca:• wybuduje sieć Internetu szerokopasmowego o łącznej długości 806,69 km,• obejmie zasięgiem sieci 17 205 gospodarstw domowych,• podłączy do sieci 112 jednostek edukacyjnych,• utworzy 15 węzły dostępowe sieci. (Polish)
    0 references
    The project will consist of building a fibre network and providing access to broadband Internet with guaranteed capacity of at least 30 Mbps in areas excluded digitally in the Intervention Area – PILSKI.The project will be made in ground technology – the cables will be arranged in telecommunication sewerage. The implementation period of the project is planned for 36 months. As part of the project, infrastructure will be built in the form of fibre optic networks, together with all necessary equipment, in accordance with NGA network technology. The network will be built according to the assumptions of the technical concept.The planned works are divided into 7 tasks. Implementation of the investment in the established form will allow for realisation of the objectives of the Operational Programme Digital Poland, action1.1. The aim of this action is to eliminate territorial gaps in high-speed broadband opportunities. The project will result in a broadband network, allowing the provision of high-speed services in areas that have been demonstrated as an intervention area, i.e. digitally excluded. The intervention areas have been identified as a result of an inventory carried out by the President of the Office for Electronic Communications.As part of the planned investment, the applicant:• will build a broadband network with a total length of 806.69 km,• will cover the network coverage of 17 205 households,• connect to the network 112 educational units,• create 15 network access nodes. (English)
    14 October 2020
    0 references

    Identifiers

    POPC.01.01.00-30-0068/17
    0 references