Construction of a tram line along the street Kujawski in the section from the roundabout to the bernnardyski roundabout with the development of the road system, the construction of rail transport infrastructure and the purchase of rolling stock in Bydgoszcz. (Q86055): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project involves the construction of a rail infrastructure at ul.Kujawski in the section from the roundabout to the bernardyski roundabout and the reconstruction of the road system, the reconstruction of rail transport infrastructure over the course of ul.The Polish Army, from the Magnuzezewska loop to the traffic hub of the Polish Army — Szpina — Below Sheregów — Belts and the connection of the abovementioned sections to the Transport Sys...)
(‎Created claim: summary (P836): The project includes the construction of rail infrastructure in ul. Kujawska on the section from the Kujawski roundabout to the Bernardyński roundabout along with the reconstruction of the road layout, reconstruction of the rail transport infrastructure within the street. The Polish Army from the Magnuszewska loop to the transport hub of the Polish Army – Szpitalna – Szaryregów – Bełzy and the connection of the above mentioned sections to the Tr...)
Property / summary
 
The project includes the construction of rail infrastructure in ul. Kujawska on the section from the Kujawski roundabout to the Bernardyński roundabout along with the reconstruction of the road layout, reconstruction of the rail transport infrastructure within the street. The Polish Army from the Magnuszewska loop to the transport hub of the Polish Army – Szpitalna – Szaryregów – Bełzy and the connection of the above mentioned sections to the Transport System of the City of Bydgoszcz (ITS), the reconstruction and construction of parking lots and the purchase of modern tram rolling stock. Includes: • construction of rail infrastructure on the section from the Kujawski roundabout to the Bernardyński roundabout with the construction of traction, lighting (including connection of tram traction function with lighting), 8 tram stops, connection to the ITS and reconstruction of the existing two-way road with a separate busband, as well as reconstruction and construction of pavements and pedestrian crossings; • reconstruction of rail transport infrastructure on the section from Magnuszewska loop to the transport hub of the Polish Army – Hospital – Grey ranks – Bełzy; • construction and reconstruction of bus bays; • reconstruction of the infrastructure (including underground) conflicting with the material scope of the project • construction of the Park &Ride car park at the Kujawski roundabout; • redevelopment of parking lots on ul. Ustronie and St. Long and parking places The aim of the project is to improve the public transport system, leading to an increase in the participation of people using public transport. The entire infrastructure task consists of the execution of works – track, road, water supply, energy (lighting and light signalling), drainage, gas, plant robe, together with the city monitoring system, while the task of rolling stock consists of delivering 15 low-floor, modern trams. The tasks will contribute to reducing congestion in the city, improving traffic flow and reducing the negative environmental impact of transport. (English)
Property / summary: The project includes the construction of rail infrastructure in ul. Kujawska on the section from the Kujawski roundabout to the Bernardyński roundabout along with the reconstruction of the road layout, reconstruction of the rail transport infrastructure within the street. The Polish Army from the Magnuszewska loop to the transport hub of the Polish Army – Szpitalna – Szaryregów – Bełzy and the connection of the above mentioned sections to the Transport System of the City of Bydgoszcz (ITS), the reconstruction and construction of parking lots and the purchase of modern tram rolling stock. Includes: • construction of rail infrastructure on the section from the Kujawski roundabout to the Bernardyński roundabout with the construction of traction, lighting (including connection of tram traction function with lighting), 8 tram stops, connection to the ITS and reconstruction of the existing two-way road with a separate busband, as well as reconstruction and construction of pavements and pedestrian crossings; • reconstruction of rail transport infrastructure on the section from Magnuszewska loop to the transport hub of the Polish Army – Hospital – Grey ranks – Bełzy; • construction and reconstruction of bus bays; • reconstruction of the infrastructure (including underground) conflicting with the material scope of the project • construction of the Park &Ride car park at the Kujawski roundabout; • redevelopment of parking lots on ul. Ustronie and St. Long and parking places The aim of the project is to improve the public transport system, leading to an increase in the participation of people using public transport. The entire infrastructure task consists of the execution of works – track, road, water supply, energy (lighting and light signalling), drainage, gas, plant robe, together with the city monitoring system, while the task of rolling stock consists of delivering 15 low-floor, modern trams. The tasks will contribute to reducing congestion in the city, improving traffic flow and reducing the negative environmental impact of transport. (English) / rank
 
Normal rank
Property / summary: The project includes the construction of rail infrastructure in ul. Kujawska on the section from the Kujawski roundabout to the Bernardyński roundabout along with the reconstruction of the road layout, reconstruction of the rail transport infrastructure within the street. The Polish Army from the Magnuszewska loop to the transport hub of the Polish Army – Szpitalna – Szaryregów – Bełzy and the connection of the above mentioned sections to the Transport System of the City of Bydgoszcz (ITS), the reconstruction and construction of parking lots and the purchase of modern tram rolling stock. Includes: • construction of rail infrastructure on the section from the Kujawski roundabout to the Bernardyński roundabout with the construction of traction, lighting (including connection of tram traction function with lighting), 8 tram stops, connection to the ITS and reconstruction of the existing two-way road with a separate busband, as well as reconstruction and construction of pavements and pedestrian crossings; • reconstruction of rail transport infrastructure on the section from Magnuszewska loop to the transport hub of the Polish Army – Hospital – Grey ranks – Bełzy; • construction and reconstruction of bus bays; • reconstruction of the infrastructure (including underground) conflicting with the material scope of the project • construction of the Park &Ride car park at the Kujawski roundabout; • redevelopment of parking lots on ul. Ustronie and St. Long and parking places The aim of the project is to improve the public transport system, leading to an increase in the participation of people using public transport. The entire infrastructure task consists of the execution of works – track, road, water supply, energy (lighting and light signalling), drainage, gas, plant robe, together with the city monitoring system, while the task of rolling stock consists of delivering 15 low-floor, modern trams. The tasks will contribute to reducing congestion in the city, improving traffic flow and reducing the negative environmental impact of transport. (English) / qualifier
 
point in time: 14 October 2020
Timestamp+2020-10-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:14, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a tram line along the street Kujawski in the section from the roundabout to the bernnardyski roundabout with the development of the road system, the construction of rail transport infrastructure and the purchase of rolling stock in Bydgoszcz.
Project in Poland financed by DG Regio

    Statements

    0 references
    168,300,000.0 zloty
    0 references
    40,392,000.0 Euro
    13 January 2020
    0 references
    212,000,099.49 zloty
    0 references
    50,880,023.88 Euro
    13 January 2020
    0 references
    79.39 percent
    0 references
    1 January 2014
    0 references
    31 December 2021
    0 references
    BYDGOSZCZ - MIASTO NA PRAWACH POWIATU
    0 references
    0 references
    0 references

    53°7'46.9"N, 18°1'45.8"E
    0 references
    Projekt obejmuje budowę infrastruktury szynowej w ul. Kujawskiej na odcinku od ronda Kujawskiego do ronda Bernardyńskiego wraz z przebudową układu dróg, przebudowę infrastruktury transportu szynowego w ciągu ul. Wojska Polskiego od pętli Magnuszewska do węzła komunikacyjnego Wojska Polskiego – Szpitalna - Szarych Szeregów – Bełzy oraz przyłączenie wyżej wymienionych odcinków do Systemu Transportowego miasta Bydgoszczy (ITS), przebudowę i budowę parkingów oraz zakup nowoczesnego taboru tramwajowego. Obejmuje: • budowę infrastruktury szynowej na odcinku od ronda Kujawskiego do ronda Bernardyńskiego wraz z budową trakcji, oświetleniem (w tym powiązanie funkcji trakcji tramwajowej z oświetleniem), 8 przystankami tramwajowymi, podłączeniem do ITS oraz przebudową istniejącej i budową nowej drogi dwujezdniowej z wydzielonym BUSPASEM a także przebudową i budową chodników i przejść dla pieszych; • przebudowę infrastruktury transportu szynowego na odcinku od pętli Magnuszewska do węzła komunikacyjnego Wojska Polskiego – Szpitalna – Szarych Szeregów – Bełzy; • budowę i przebudowę zatok autobusowych; • przebudowę infrastruktury (w tym podziemnej) kolidującej z zakresem rzeczowym projektu • budowę parkingu Park&Ride przy rondzie Kujawskim; • przebudowę parkingów na ul. Ustronie i ul. Długiej oraz miejsc postojo Celem przedsięwzięcia jest usprawnienie systemu miejskiej komunikacji zbiorowej, prowadzące do zwiększenia udziału osób korzystających ze środków transportu publicznego. Całość zadań infrastrukturalnych polega na wykonaniu robót - torowych, drogowych, wodociągowych, energetycznych (oświetlenie i sygnalizacja świetlna), odwodnieniowych, gazowych, szaty roślinnej, wraz z systemem monitoringu miejskiego, natomiast zadanie taborowe polega na dostarczeniu 15 szt. niskopodłogowych, nowoczesnych tramwajów. Zadania przyczynią się do zmniejszenia zatłoczenia motoryzacyjnego w mieście, do poprawy płynności ruchu i ograniczenia negatywnego wpływu transportu na środowisko. (Polish)
    0 references
    The project includes the construction of rail infrastructure in ul. Kujawska on the section from the Kujawski roundabout to the Bernardyński roundabout along with the reconstruction of the road layout, reconstruction of the rail transport infrastructure within the street. The Polish Army from the Magnuszewska loop to the transport hub of the Polish Army – Szpitalna – Szaryregów – Bełzy and the connection of the above mentioned sections to the Transport System of the City of Bydgoszcz (ITS), the reconstruction and construction of parking lots and the purchase of modern tram rolling stock. Includes: • construction of rail infrastructure on the section from the Kujawski roundabout to the Bernardyński roundabout with the construction of traction, lighting (including connection of tram traction function with lighting), 8 tram stops, connection to the ITS and reconstruction of the existing two-way road with a separate busband, as well as reconstruction and construction of pavements and pedestrian crossings; • reconstruction of rail transport infrastructure on the section from Magnuszewska loop to the transport hub of the Polish Army – Hospital – Grey ranks – Bełzy; • construction and reconstruction of bus bays; • reconstruction of the infrastructure (including underground) conflicting with the material scope of the project • construction of the Park &Ride car park at the Kujawski roundabout; • redevelopment of parking lots on ul. Ustronie and St. Long and parking places The aim of the project is to improve the public transport system, leading to an increase in the participation of people using public transport. The entire infrastructure task consists of the execution of works – track, road, water supply, energy (lighting and light signalling), drainage, gas, plant robe, together with the city monitoring system, while the task of rolling stock consists of delivering 15 low-floor, modern trams. The tasks will contribute to reducing congestion in the city, improving traffic flow and reducing the negative environmental impact of transport. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.06.01.00-00-0007/16
    0 references