Development of the rainwater management system in Gdynia — Part II (Q85070): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The project included 4 investment projects in catchments with a total area of 69.74 ha, including:Zad.1.Reconstruction of the drainage system in the Witomino district in Gdynia and the construction of the reservoir (area).60.00 ha);Zad.2.Management of storm water within a group of educational facilities, including sports and access areas, in Chwarzno-Wiślino in Gdynia.5.79 ha);Zad.3.Building a storm-water management system in the Mexico settle...) |
||
Property / summary | |||
Property / summary: The project included 4 investment projects in catchments with a total area of 69.74 ha, including:Zad.1.Reconstruction of the drainage system in the Witomino district in Gdynia and the construction of the reservoir (area).60.00 ha);Zad.2.Management of storm water within a group of educational facilities, including sports and access areas, in Chwarzno-Wiślino in Gdynia.5.79 ha);Zad.3.Building a storm-water management system in the Mexico settlement area in Gdynia.3.61 ha);Zad.4.Upgrading of sites to be sealed on the streets:Tatrzańska, Witomska and Wladislav IV Gdynia0.34 ha).On the surface of 69.74 ha covered by the project, it will be built/rehabilitated gravity sewers with a length of length6.23 km with 7 cleaning devices and 22 storm water management equipment:2 retention basins open (both outside water) and 6 compartment cabinets and opening boxes with a total capacity of 3 579.80 m³, 8 vegetable passages, 1 mulda, 2 drainage ditches, 3 green roofs, pitch and tread drainage and removal of sealed surfaces and their replacement with permeable pavement, with a total coating area.3 464.00 m². (English) / rank | |||
Revision as of 15:01, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Development of the rainwater management system in Gdynia — Part II |
Project in Poland financed by DG Regio |
Statements
27,633,427.34 zloty
0 references
32,509,914.52 zloty
0 references
85.0 percent
0 references
26 March 2018
0 references
31 December 2021
0 references
GMINA MIASTA GDYNI
0 references
Projektem objęto 4 zadania inwestycyjne położone w zlewniach o łącznej powierzchni 69,74ha, w tym: Zad.1.Przebudowa układu odwodnienia na terenie dzielnicy Witomino w Gdyni wraz z budową zbiornika retencyjnego (pow. 60,00ha); Zad.2.Zagospodarowanie wód opadowych na terenie zespołu obiektów oświatowych wraz z terenami sportowymi i dojazdowym układem drogowym w dzielnicy Chwarzno-Wiczlino w Gdyni (pow. 5,79ha); Zad.3.Budowa systemu gospodarowania wodami opadowymi na terenie osiedla Meksyk w Gdyni (pow. 3,61ha); Zad.4.Przebudowa terenów uszczelnionych przy ulicach: Tatrzańskiej, Witomińskiej i Władysława IV w Gdyni (pow. 0,34ha). Na powierzchni 69,74ha objętej projektem, zostanie wybudowana/przebudowana kanalizacja deszczowa grawitacyjna o dł. 6,23 km wraz z 7 szt. urządzeń podczyszczających oraz 22 urządzenia służące gospodarowaniu wodami opadowymi: 2 zbiorniki retencyjne otwarte (oba poza ciekami wodnymi) i 6 zespołów komór i skrzynek rozsączających, o łącznej pojemności 3579,80m3, 8 pasaży roślinnych, 1 mulda, 2 rowy odwadniające, 3 dachy zielone, drenaż boisk i bieżni oraz likwidacja powierzchni uszczelnionych i zastąpienie ich nawierzchnią przepuszczalną, o łącznej pow. 3.464,00m2. (Polish)
0 references
Identifiers
POIS.02.01.00-00-0013/18
0 references