Construction of the S61 express road. Ostrów Mazowiecka — Szczuczyn (Q85873): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project aims at the construction of the S61 express road.Ostrów Mazowiecka-Szczuczyn with a length of inactivity91 km.The investment is located in the north-eastern part of Poland and passes through the area of the Mazowieckie and Podlaskie provinces.The proposed road follows partly on the new incident mainly on the western side of the existing dk No 63 and partly within the existing segment dk No 61.The entire length of the investment in...)
(‎Created claim: summary (P836): The project aims to build the S61 expressway. Ostrów Mazowiecka-Szczuczyn o dł. It’s 91 miles. The investment is located in the north-eastern part of Poland and runs through the Mazowieckie and Podlaskie voivodeships. The projected road runs partly on a new footprint mainly on the western side of existing Dk No 63 and partly within the existing section 61. A two-way cross-section with two lanes and an emergency lane, adapted to the forecast traf...)
Property / summary
 
The project aims to build the S61 expressway. Ostrów Mazowiecka-Szczuczyn o dł. It’s 91 miles. The investment is located in the north-eastern part of Poland and runs through the Mazowieckie and Podlaskie voivodeships. The projected road runs partly on a new footprint mainly on the western side of existing Dk No 63 and partly within the existing section 61. A two-way cross-section with two lanes and an emergency lane, adapted to the forecast traffic level, is provided throughout the investment. (English)
Property / summary: The project aims to build the S61 expressway. Ostrów Mazowiecka-Szczuczyn o dł. It’s 91 miles. The investment is located in the north-eastern part of Poland and runs through the Mazowieckie and Podlaskie voivodeships. The projected road runs partly on a new footprint mainly on the western side of existing Dk No 63 and partly within the existing section 61. A two-way cross-section with two lanes and an emergency lane, adapted to the forecast traffic level, is provided throughout the investment. (English) / rank
 
Normal rank
Property / summary: The project aims to build the S61 expressway. Ostrów Mazowiecka-Szczuczyn o dł. It’s 91 miles. The investment is located in the north-eastern part of Poland and runs through the Mazowieckie and Podlaskie voivodeships. The projected road runs partly on a new footprint mainly on the western side of existing Dk No 63 and partly within the existing section 61. A two-way cross-section with two lanes and an emergency lane, adapted to the forecast traffic level, is provided throughout the investment. (English) / qualifier
 
point in time: 14 October 2020
Timestamp+2020-10-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:53, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the S61 express road. Ostrów Mazowiecka — Szczuczyn
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    1,636,870,479.79 zloty
    0 references
    392,848,915.15 Euro
    13 January 2020
    0 references
    1,925,729,976.23 zloty
    0 references
    462,175,194.3 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2023
    0 references
    GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD
    0 references
    0 references

    52°56'55.7"N, 21°45'31.3"E
    0 references

    52°47'26.2"N, 19°51'23.0"E
    0 references

    53°33'18.4"N, 22°25'8.0"E
    0 references

    53°23'31.9"N, 21°57'31.7"E
    0 references

    53°12'29.9"N, 22°16'39.4"E
    0 references

    53°1'21.7"N, 22°14'52.8"E
    0 references
    Projekt ma na celu budowę drogi ekspresowej S61 odc. Ostrów Mazowiecka–Szczuczyn o dł. 91 km. Inwestycja położona jest w północno-wschodniej części Polski i przebiega przez obszar woj. mazowieckiego i podlaskiego. Projektowana droga przebiega częściowo po nowym śladzie głównie po zachodniej stronie istniejącej dk nr 63 oraz częściowo w ciągu istniejącego odcinka dk nr 61. Na całym odcinku przedmiotowej inwestycji przewidziano przekrój dwujezdniowy z dwoma pasami ruchu oraz pasem awaryjnym, dostosowany do prognozowanego poziomu ruchu. (Polish)
    0 references
    The project aims to build the S61 expressway. Ostrów Mazowiecka-Szczuczyn o dł. It’s 91 miles. The investment is located in the north-eastern part of Poland and runs through the Mazowieckie and Podlaskie voivodeships. The projected road runs partly on a new footprint mainly on the western side of existing Dk No 63 and partly within the existing section 61. A two-way cross-section with two lanes and an emergency lane, adapted to the forecast traffic level, is provided throughout the investment. (English)