Construction and reconstruction of the main rainwater collectors in the city of the municipality (Q85049): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The investment project concerns the conversion of old and new primary storm-water collecting systems for the purpose of operating built-up areas and intended for construction on the territory of the city of Melągova.To this end, an existing DN500mm outlet will be dismantled into the Juno lake and a new concrete fill out of DN1200mm shall be deployed in its place.The height of the excess water outlet shall be the waived rate fitted at the outle...) |
(Created claim: summary (P836): The investment project concerns the reconstruction of old and new collectors of the main rainwater drainage system, for the purpose of servicing built-up areas and intended for construction in the city of Mrągow. For this purpose, the existing DN500 mm outlet to Lake Juno will be dismantled and replaced by a new concrete outlet, prefabricated with DN1200mm diameter. An element regulating the outflow of excess water will be the tilting valve moun...) |
||||||||||||||
Property / summary | |||||||||||||||
The investment project concerns the reconstruction of old and new collectors of the main rainwater drainage system, for the purpose of servicing built-up areas and intended for construction in the city of Mrągow. For this purpose, the existing DN500 mm outlet to Lake Juno will be dismantled and replaced by a new concrete outlet, prefabricated with DN1200mm diameter. An element regulating the outflow of excess water will be the tilting valve mounted in the outlet. Before draining the rainwaters and meltwaters to Lake Juno, the rainwaters will be cleaned in centrifugal settlers and oil-derived separators. In addition, the project assumes the construction of a retention tank on a manifold run from wasps. Mazurski towards the drainage ditch at the city market. The designed storage tank is designed to stop rainwater and reduce the flow of water to the main rain manifold from Lake Magistracki to Juno, using a flow regulator. (English) | |||||||||||||||
Property / summary: The investment project concerns the reconstruction of old and new collectors of the main rainwater drainage system, for the purpose of servicing built-up areas and intended for construction in the city of Mrągow. For this purpose, the existing DN500 mm outlet to Lake Juno will be dismantled and replaced by a new concrete outlet, prefabricated with DN1200mm diameter. An element regulating the outflow of excess water will be the tilting valve mounted in the outlet. Before draining the rainwaters and meltwaters to Lake Juno, the rainwaters will be cleaned in centrifugal settlers and oil-derived separators. In addition, the project assumes the construction of a retention tank on a manifold run from wasps. Mazurski towards the drainage ditch at the city market. The designed storage tank is designed to stop rainwater and reduce the flow of water to the main rain manifold from Lake Magistracki to Juno, using a flow regulator. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The investment project concerns the reconstruction of old and new collectors of the main rainwater drainage system, for the purpose of servicing built-up areas and intended for construction in the city of Mrągow. For this purpose, the existing DN500 mm outlet to Lake Juno will be dismantled and replaced by a new concrete outlet, prefabricated with DN1200mm diameter. An element regulating the outflow of excess water will be the tilting valve mounted in the outlet. Before draining the rainwaters and meltwaters to Lake Juno, the rainwaters will be cleaned in centrifugal settlers and oil-derived separators. In addition, the project assumes the construction of a retention tank on a manifold run from wasps. Mazurski towards the drainage ditch at the city market. The designed storage tank is designed to stop rainwater and reduce the flow of water to the main rain manifold from Lake Magistracki to Juno, using a flow regulator. (English) / qualifier | |||||||||||||||
point in time: 14 October 2020
|
Revision as of 14:53, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction and reconstruction of the main rainwater collectors in the city of the municipality |
Project in Poland financed by DG Regio |
Statements
16,616,243.76 zloty
0 references
19,548,522.08 zloty
0 references
85.0 percent
0 references
26 November 2015
0 references
30 September 2021
0 references
GMINA MIASTO MRĄGOWO
0 references
Przedsięwzięcie inwestycyjne dotyczy przebudowy starych i budowy nowych kolektorów głównych kanalizacji deszczowej, na potrzeby obsługi terenów zabudowanych i przeznaczonych pod zabudowę na terenie miasta Mrągowa. W tym celu zostanie zdemontowany istniejący wylot DN500mm do jeziora Juno, a w jego miejsce wykonany nowy wylot betonowy, prefabrykowany o średnicy DN1200mm. Elementem regulującym wielkość odpływu wód nadmiarowych będzie zastawka uchylna zamontowana w wylocie. Przed odprowadzeniem wód opadowych i roztopowych do jeziora Juno, wody opadowe zostaną podczyszczone w osadnikach wirowych i separatorze substancji ropopochodnych. Dodatkowo projekt zakłada budowę zbiornika retencyjnego na kolektorze prowadzonym od os. Mazurskiego w stronę rowu melioracyjnego na terenie targowiska miejskiego. Projektowany zbiornik retencyjny ma za zadanie zatrzymanie wód opadowych i ograniczenie dopływu ilości wód do głównego kolektora deszczowego od Jeziorka Magistrackiego do jez. Juno, poprzez zastosowanie regulatora przepływu. (Polish)
0 references
The investment project concerns the reconstruction of old and new collectors of the main rainwater drainage system, for the purpose of servicing built-up areas and intended for construction in the city of Mrągow. For this purpose, the existing DN500 mm outlet to Lake Juno will be dismantled and replaced by a new concrete outlet, prefabricated with DN1200mm diameter. An element regulating the outflow of excess water will be the tilting valve mounted in the outlet. Before draining the rainwaters and meltwaters to Lake Juno, the rainwaters will be cleaned in centrifugal settlers and oil-derived separators. In addition, the project assumes the construction of a retention tank on a manifold run from wasps. Mazurski towards the drainage ditch at the city market. The designed storage tank is designed to stop rainwater and reduce the flow of water to the main rain manifold from Lake Magistracki to Juno, using a flow regulator. (English)
14 October 2020
0 references
Identifiers
POIS.02.01.00-00-0005/18
0 references