Improving the rain water management system in the municipality of Rawicz (Q85042): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The main objective of the project is to increase the amount of water retained in the territory of Rawicz by building a retention tank located in the area.The construction of a storm water network at ul.Kadeck Street and ul.Mr Jarosław Dabrowski, in the city of Rawicz.The following tasks are planned under this project:Task 1:Construction of an underground storage reservoir for the existing rainwater drainage system with the construction and rec...)
(‎Created claim: summary (P836): The main objective of the project is to increase the amount of water retention in the Rawicz commune by building a reservoir located in the area of ul. Cadet and construction of rainwater drainage network at ul. Cadet and street. Jaroslaw Dąbrowski’s Walls in the town of Rawicz. The following task is planned under this project: Task 1: Construction of an underground reservoir on the existing rainwater drainage system, including the construction...)
Property / summary
 
The main objective of the project is to increase the amount of water retention in the Rawicz commune by building a reservoir located in the area of ul. Cadet and construction of rainwater drainage network at ul. Cadet and street. Jaroslaw Dąbrowski’s Walls in the town of Rawicz. The following task is planned under this project: Task 1: Construction of an underground reservoir on the existing rainwater drainage system, including the construction and reconstruction of a section of the rainwater drainage system. As part of this task, preparatory work will be carried out, construction and reconstruction of a section of the rainwater drainage system, an underground concrete reservoir in the area of ul. Cadet with a capacity of 550 m³ rainwater; power cables and pipes will be arranged, as well as the surface of the asphalt road and paving block and the fence. (English)
Property / summary: The main objective of the project is to increase the amount of water retention in the Rawicz commune by building a reservoir located in the area of ul. Cadet and construction of rainwater drainage network at ul. Cadet and street. Jaroslaw Dąbrowski’s Walls in the town of Rawicz. The following task is planned under this project: Task 1: Construction of an underground reservoir on the existing rainwater drainage system, including the construction and reconstruction of a section of the rainwater drainage system. As part of this task, preparatory work will be carried out, construction and reconstruction of a section of the rainwater drainage system, an underground concrete reservoir in the area of ul. Cadet with a capacity of 550 m³ rainwater; power cables and pipes will be arranged, as well as the surface of the asphalt road and paving block and the fence. (English) / rank
 
Normal rank
Property / summary: The main objective of the project is to increase the amount of water retention in the Rawicz commune by building a reservoir located in the area of ul. Cadet and construction of rainwater drainage network at ul. Cadet and street. Jaroslaw Dąbrowski’s Walls in the town of Rawicz. The following task is planned under this project: Task 1: Construction of an underground reservoir on the existing rainwater drainage system, including the construction and reconstruction of a section of the rainwater drainage system. As part of this task, preparatory work will be carried out, construction and reconstruction of a section of the rainwater drainage system, an underground concrete reservoir in the area of ul. Cadet with a capacity of 550 m³ rainwater; power cables and pipes will be arranged, as well as the surface of the asphalt road and paving block and the fence. (English) / qualifier
 
point in time: 14 October 2020
Timestamp+2020-10-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:52, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Improving the rain water management system in the municipality of Rawicz
Project in Poland financed by DG Regio

    Statements

    0 references
    1,645,035.6 zloty
    0 references
    394,808.54 Euro
    13 January 2020
    0 references
    1,935,336.01 zloty
    0 references
    464,480.64 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 August 2018
    0 references
    31 December 2019
    0 references
    GMINA RAWICZ
    0 references
    0 references
    0 references
    Głównym celem projektu jest zwiększenie ilości retencjonowanej wody na terenie Gminy Rawicz poprzez budowę zbiornika retencyjnego zlokalizowanego w rejonie ul. Kadeckiej oraz budowę sieci kanalizacji deszczowej przy ul. Kadeckiej i ul. Wały Jarosława Dąbrowskiego w mieście Rawicz. W ramach niniejszego projektu zaplanowano następujące zadanie: Zadanie 1: Budowa podziemnego zbiornika retencyjnego na istniejącym systemie kanalizacji deszczowej wraz z budową i przebudową odcinka sieci kanalizacji deszczowej. W ramach niniejszego zadania przeprowadzone zostaną prace przygotowawcze, wybudowany i przebudowany zostanie odcinek sieci kanalizacji deszczowej, wybudowany zostanie podziemny żelbetonowy zbiornik w rejonie ul. Kadeckiej o pojemności 550 m3 wody opadowej; ułożone zostaną kable zasilające i rury a także odtworzona zostanie nawierzchnia drogi asfaltowej i z kostki brukowej oraz ogrodzenie. (Polish)
    0 references
    The main objective of the project is to increase the amount of water retention in the Rawicz commune by building a reservoir located in the area of ul. Cadet and construction of rainwater drainage network at ul. Cadet and street. Jaroslaw Dąbrowski’s Walls in the town of Rawicz. The following task is planned under this project: Task 1: Construction of an underground reservoir on the existing rainwater drainage system, including the construction and reconstruction of a section of the rainwater drainage system. As part of this task, preparatory work will be carried out, construction and reconstruction of a section of the rainwater drainage system, an underground concrete reservoir in the area of ul. Cadet with a capacity of 550 m³ rainwater; power cables and pipes will be arranged, as well as the surface of the asphalt road and paving block and the fence. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.02.01.00-00-0003/18
    0 references