(‎Removed claim: summary (P836): The project consists of reconverting district heating networks with thermal insulated heat and affected by the corrosion of district heating to a non-ducted district heating network from advanced pre-insulated pipes and the construction of 29 individual high efficiency heat exchanger units.The project consists of three tasks., remove_old_english_translation)
(‎Created claim: summary (P836): The project consists of the conversion of channel heating networks with degraded thermal insulation and damaged by corrosion with heating pipes into a channelless heating network from modern pre-insulated pipes and the construction of 29 individual high-efficiency heat exchangers. The project consists of three tasks., translated_summary)
Property / summary
 
The project consists of the conversion of channel heating networks with degraded thermal insulation and damaged by corrosion with heating pipes into a channelless heating network from modern pre-insulated pipes and the construction of 29 individual high-efficiency heat exchangers. The project consists of three tasks. (English)
Property / summary: The project consists of the conversion of channel heating networks with degraded thermal insulation and damaged by corrosion with heating pipes into a channelless heating network from modern pre-insulated pipes and the construction of 29 individual high-efficiency heat exchangers. The project consists of three tasks. (English) / rank
 
Normal rank
Property / summary: The project consists of the conversion of channel heating networks with degraded thermal insulation and damaged by corrosion with heating pipes into a channelless heating network from modern pre-insulated pipes and the construction of 29 individual high-efficiency heat exchangers. The project consists of three tasks. (English) / qualifier
 
point in time: 14 October 2020
Timestamp+2020-10-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:52, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Removal of the group thermal substations in Łaziska Górne.
Project in Poland financed by DG Regio

    Statements

    0 references
    2,190,815.0 zloty
    0 references
    525,795.6 Euro
    13 January 2020
    0 references
    3,847,340.0 zloty
    0 references
    923,361.6 Euro
    13 January 2020
    0 references
    56.94 percent
    0 references
    23 December 2016
    0 references
    28 February 2022
    0 references
    PRZEDSIĘBIORSTWO ENERGETYKI CIEPLNEJ SP. Z O.O.
    0 references
    0 references
    0 references
    Projekt polega na przebudowie kanałowych sieci ciepłowniczych ze zdegradowaną izolacją termiczną i naruszonymi przez korozję rurami ciepłowniczymi na bezkanałową sieć ciepłowniczą z nowoczesnych rur preizolowanych oraz budowę 29 sztuk indywidualnych wysokosprawnych wymiennikowni ciepła. Na projekt składają się trzy zadania. (Polish)
    0 references
    The project consists of the conversion of channel heating networks with degraded thermal insulation and damaged by corrosion with heating pipes into a channelless heating network from modern pre-insulated pipes and the construction of 29 individual high-efficiency heat exchangers. The project consists of three tasks. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.01.07.02-00-0007/16
    0 references