Q85866 (Q85866): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The main part of the project is the construction of the S7 expressway on a section starting near the “Airport” junction to the Grójec ring road, located in the TEN-T comprehensive network with a total length of 29.16 km., translated_summary) |
(Changed label, description and/or aliases in 1 language: remove_english_label) |
||
label / en | label / en | ||
Revision as of 14:50, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Poland financed by DG Regio |
Statements
542,448,242.42 zloty
0 references
638,174,402.85 zloty
0 references
85.0 percent
0 references
1 January 2014
0 references
30 June 2022
0 references
GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD
0 references
Zasadniczą częścią przedsięwzięcia jest budowa drogi ekspresowej S7 na odcinku mającym początek w okolicach węzła „Lotnisko” do obwodnicy Grójca, zlokalizowanej w sieci kompleksowej TEN-T o łącznej długości 29,16 km. (Polish)
0 references
The main part of the project is the construction of the S7 expressway on a section starting near the “Airport” junction to the Grójec ring road, located in the TEN-T comprehensive network with a total length of 29.16 km. (English)
14 October 2020
0 references
Identifiers
POIS.03.01.00-00-0045/18
0 references
4888
0 references