(‎Removed claim: summary (P836): The project aims at the construction of the A2 motorway on a cac.Warsaw (W. Lubelska-no node) — the beginning of the OBW.Minsk, y/y/y/o/o/o/o/o/o/o14.77 km, which is located on the TEN-T core network, consists of the following tasks which are carried out as separate works contracts within the P & B system:— Activity A:Project and construction of the A2 motorway Warszawa — Kukuryki na lubelska — start of OBW.MIA.Z. section I from the century Lu...)
(‎Created claim: summary (P836): The project aims at the construction of the A2 motorway at pc. Warsaw (W. Lubelska-without a junction) – the beginning of the region. Minsk Maz. d. 14,77 km, located in the TEN-T core network. It consists of the following tasks, carried out as separate works contracts under the P &B system: — Task A: Design and construction of the A2 motorway Warsaw – Kukuryki on the section of W. Lubelska – the beginning of the area. Minsk Maz. section I from L...)
Property / summary
 
The project aims at the construction of the A2 motorway at pc. Warsaw (W. Lubelska-without a junction) – the beginning of the region. Minsk Maz. d. 14,77 km, located in the TEN-T core network. It consists of the following tasks, carried out as separate works contracts under the P &B system: — Task A: Design and construction of the A2 motorway Warsaw – Kukuryki on the section of W. Lubelska – the beginning of the area. Minsk Maz. section I from Lubelska (without a node) to St. Konik (with a knot) with a length of about 5.6 km (detailed picket of the task from km 489 + 325.68 to km 494 + 905.40 gives a length of 5579.72 m) – Task B: Design and construction of the A2 motorway Warsaw – Kukuryki on the section of W. Lubelska – the beginning of the area. Minsk Maz. section II from St. Konik (without a node) to the beginning of the Obw. Minsk Mazowiecki with a length of about 9 km (detailed picket of the task from km 494 + 905.40 to km 504 + 094.76 gives a length of 9189.36 m). (English)
Property / summary: The project aims at the construction of the A2 motorway at pc. Warsaw (W. Lubelska-without a junction) – the beginning of the region. Minsk Maz. d. 14,77 km, located in the TEN-T core network. It consists of the following tasks, carried out as separate works contracts under the P &B system: — Task A: Design and construction of the A2 motorway Warsaw – Kukuryki on the section of W. Lubelska – the beginning of the area. Minsk Maz. section I from Lubelska (without a node) to St. Konik (with a knot) with a length of about 5.6 km (detailed picket of the task from km 489 + 325.68 to km 494 + 905.40 gives a length of 5579.72 m) – Task B: Design and construction of the A2 motorway Warsaw – Kukuryki on the section of W. Lubelska – the beginning of the area. Minsk Maz. section II from St. Konik (without a node) to the beginning of the Obw. Minsk Mazowiecki with a length of about 9 km (detailed picket of the task from km 494 + 905.40 to km 504 + 094.76 gives a length of 9189.36 m). (English) / rank
 
Normal rank
Property / summary: The project aims at the construction of the A2 motorway at pc. Warsaw (W. Lubelska-without a junction) – the beginning of the region. Minsk Maz. d. 14,77 km, located in the TEN-T core network. It consists of the following tasks, carried out as separate works contracts under the P &B system: — Task A: Design and construction of the A2 motorway Warsaw – Kukuryki on the section of W. Lubelska – the beginning of the area. Minsk Maz. section I from Lubelska (without a node) to St. Konik (with a knot) with a length of about 5.6 km (detailed picket of the task from km 489 + 325.68 to km 494 + 905.40 gives a length of 5579.72 m) – Task B: Design and construction of the A2 motorway Warsaw – Kukuryki on the section of W. Lubelska – the beginning of the area. Minsk Maz. section II from St. Konik (without a node) to the beginning of the Obw. Minsk Mazowiecki with a length of about 9 km (detailed picket of the task from km 494 + 905.40 to km 504 + 094.76 gives a length of 9189.36 m). (English) / qualifier
 
point in time: 14 October 2020
Timestamp+2020-10-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:50, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the A2 motorway, odc. Warsaw (Lublin) — Minsk Mazowiecki
Project in Poland financed by DG Regio

    Statements

    0 references
    329,575,563.57 zloty
    0 references
    79,098,135.26 Euro
    13 January 2020
    0 references
    387,735,957.15 zloty
    0 references
    93,056,629.72 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2021
    0 references
    GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD
    0 references
    0 references

    52°9'25.2"N, 21°37'36.5"E
    0 references

    52°4'22.1"N, 21°21'29.9"E
    0 references
    Projekt ma na celu budowę autostrady A2 na odc. Warszawa (w. Lubelska–bez węzła) – początek obw. Mińska Maz. o dł. 14,77 km, zlokalizowanej w sieci bazowej TEN-T. Składa się on z następujących zadań, realizowanych jako osobne kontrakty na roboty budowlane w systemie P&B: - Zadanie A: Projekt i budowa autostrady A2 Warszawa – Kukuryki na odcinku w. Lubelska – początek obw. Mińska Maz. odcinek I od w. Lubelska (bez węzła) do w. Konik (z węzłem) o długości około 5,6 km (szczegółowy pikietaż zadania od km 489+325,68 do km 494+905,40 daje długość 5 579,72 m) - Zadanie B: Projekt i budowa autostrady A2 Warszawa – Kukuryki na odcinku w. Lubelska – początek obw. Mińska Maz. odcinek II od w. Konik (bez węzła) do początku obw. Mińska Mazowieckiego o długości około 9 km (szczegółowy pikietaż zadania od km 494+905,40 do km 504+094,76 daje długość 9 189,36 m). (Polish)
    0 references
    The project aims at the construction of the A2 motorway at pc. Warsaw (W. Lubelska-without a junction) – the beginning of the region. Minsk Maz. d. 14,77 km, located in the TEN-T core network. It consists of the following tasks, carried out as separate works contracts under the P &B system: — Task A: Design and construction of the A2 motorway Warsaw – Kukuryki on the section of W. Lubelska – the beginning of the area. Minsk Maz. section I from Lubelska (without a node) to St. Konik (with a knot) with a length of about 5.6 km (detailed picket of the task from km 489 + 325.68 to km 494 + 905.40 gives a length of 5579.72 m) – Task B: Design and construction of the A2 motorway Warsaw – Kukuryki on the section of W. Lubelska – the beginning of the area. Minsk Maz. section II from St. Konik (without a node) to the beginning of the Obw. Minsk Mazowiecki with a length of about 9 km (detailed picket of the task from km 494 + 905.40 to km 504 + 094.76 gives a length of 9189.36 m). (English)
    14 October 2020
    0 references

    Identifiers

    POIS.03.01.00-00-0043/18
    0 references
    4820