Construction of the A1 motorway, odc. Pyrzowice — Częstochowa (Q85836): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The main part of the project is the construction of the A1 motorway in the section Pyrzowice — the end of the Czestochowa bypass, located on the TEN-T core network, the Baltic-Adriatic corridor, with a total length of 57.70 km.This includes the integration of the A1 motorway into the existing section of national road No 1, which has a motorway section of 0.88 km (total length of 1.03 km, of which 0.15 km have no motorway parameters).As the pro...) |
(Created claim: summary (P836): The main part of the project is the construction of the A1 motorway in the section Pyrzowice – the end of the Częstochowa ring road, located in the TEN-T core network, the Baltic-Adriatic corridor, with a total length of 57.70 km. This includes the inclusion of the A1 motorway into the existing section of national road No 1, which has parameters of the motorway for 0.88 km (the total length of integration is 1.03 km, of which 0.15 km does not ha...) |
||||||||||||||
Property / summary | |||||||||||||||
The main part of the project is the construction of the A1 motorway in the section Pyrzowice – the end of the Częstochowa ring road, located in the TEN-T core network, the Baltic-Adriatic corridor, with a total length of 57.70 km. This includes the inclusion of the A1 motorway into the existing section of national road No 1, which has parameters of the motorway for 0.88 km (the total length of integration is 1.03 km, of which 0.15 km does not have motorway parameters). Since the project is implemented in part in the Design and Building formula, and at present the final design solutions and the permanent traffic organisation project are not yet known, the above-mentioned length of the road to be built must be estimated and can be corrected. The beginning of the investment took place in km 417 + 530,00 (preceded by the incorporation section of DK 1 from km 416 + 500 to km 417+ 530; the section from km 416 + 650 to km 417 + 530 has parameters of the motorway) in front of the Rząsaw junction. The end of the investment was designed in km 474 + 350.00 before the “Pyrzowice” junction in Ożarowice commune. The project at the stage of the preparation of the investment and implementation (contract sections) has been divided into four tasks: • section F w. “Rząsawa” (with a node) – w. “Blachownia” (with node) – implemented in the system Za Projektuj i Buduj, • section G w. “Blachownia” (without a node) – w. “Zawodzie” (without a node) – implemented in the system. As part of the task covering section F, a section of 1.03 km was included in the existing DK 1, which is nominally in section E. (English) | |||||||||||||||
Property / summary: The main part of the project is the construction of the A1 motorway in the section Pyrzowice – the end of the Częstochowa ring road, located in the TEN-T core network, the Baltic-Adriatic corridor, with a total length of 57.70 km. This includes the inclusion of the A1 motorway into the existing section of national road No 1, which has parameters of the motorway for 0.88 km (the total length of integration is 1.03 km, of which 0.15 km does not have motorway parameters). Since the project is implemented in part in the Design and Building formula, and at present the final design solutions and the permanent traffic organisation project are not yet known, the above-mentioned length of the road to be built must be estimated and can be corrected. The beginning of the investment took place in km 417 + 530,00 (preceded by the incorporation section of DK 1 from km 416 + 500 to km 417+ 530; the section from km 416 + 650 to km 417 + 530 has parameters of the motorway) in front of the Rząsaw junction. The end of the investment was designed in km 474 + 350.00 before the “Pyrzowice” junction in Ożarowice commune. The project at the stage of the preparation of the investment and implementation (contract sections) has been divided into four tasks: • section F w. “Rząsawa” (with a node) – w. “Blachownia” (with node) – implemented in the system Za Projektuj i Buduj, • section G w. “Blachownia” (without a node) – w. “Zawodzie” (without a node) – implemented in the system. As part of the task covering section F, a section of 1.03 km was included in the existing DK 1, which is nominally in section E. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The main part of the project is the construction of the A1 motorway in the section Pyrzowice – the end of the Częstochowa ring road, located in the TEN-T core network, the Baltic-Adriatic corridor, with a total length of 57.70 km. This includes the inclusion of the A1 motorway into the existing section of national road No 1, which has parameters of the motorway for 0.88 km (the total length of integration is 1.03 km, of which 0.15 km does not have motorway parameters). Since the project is implemented in part in the Design and Building formula, and at present the final design solutions and the permanent traffic organisation project are not yet known, the above-mentioned length of the road to be built must be estimated and can be corrected. The beginning of the investment took place in km 417 + 530,00 (preceded by the incorporation section of DK 1 from km 416 + 500 to km 417+ 530; the section from km 416 + 650 to km 417 + 530 has parameters of the motorway) in front of the Rząsaw junction. The end of the investment was designed in km 474 + 350.00 before the “Pyrzowice” junction in Ożarowice commune. The project at the stage of the preparation of the investment and implementation (contract sections) has been divided into four tasks: • section F w. “Rząsawa” (with a node) – w. “Blachownia” (with node) – implemented in the system Za Projektuj i Buduj, • section G w. “Blachownia” (without a node) – w. “Zawodzie” (without a node) – implemented in the system. As part of the task covering section F, a section of 1.03 km was included in the existing DK 1, which is nominally in section E. (English) / qualifier | |||||||||||||||
point in time: 14 October 2020
|
Revision as of 14:47, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of the A1 motorway, odc. Pyrzowice — Częstochowa |
Project in Poland financed by DG Regio |
Statements
1,355,184,582.35 zloty
0 references
1,594,334,802.77 zloty
0 references
85.0 percent
0 references
1 January 2014
0 references
31 December 2019
0 references
GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD
0 references
Zasadniczą częścią przedsięwzięcia jest budowa autostrady A1 w odcinek Pyrzowice – koniec obwodnicy Częstochowy, zlokalizowanej w sieci bazowej TEN-T, korytarzu Bałtyk- Adriatyk, o łącznej długości 57,70 km. W zakresie tym zawarte jest włączenie autostrady A1 do istniejącego przekroju drogi krajowej nr 1, które na odcinku 0,88 km posiada parametry autostrady (całkowita długość włączenia wynosi 1,03 km, z czego 0,15 km nie posiada parametrów autostrady). Ponieważ projekt realizowany jest w części w formule Zaprojektuj i Buduj, a w chwili obecnej nie są znane jeszcze ostateczne rozwiązania projektowe oraz projekt stałej organizacji ruchu, wskazaną wyżej długość drogi do wybudowania należy traktować szacunkowo i może ona ulec korekcie. Początek inwestycji przyjęto w km 417+530,00 (poprzedzony odcinkiem włączenia do DK 1 od km 416+500 do km 417+530; przy czym odcinek od km 416+650 do km 417+530 posiada parametry autostrady) przed węzłem Rząsawa. Koniec inwestycji zaprojektowano w km 474+350,00 przed węzłem „Pyrzowice” na terenie gminy Ożarowice. Przedmiotowy Projekt na etapie przygotowania inwestycji oraz realizacji (odcinki kontraktowe) został podzielony na cztery zadania: • odcinek F w. „Rząsawa” (z węzłem) - w. „Blachownia” (z węzłem) – realizowany w systemie Zaprojektuj i Buduj, • odcinek G w. „Blachownia” (bez węzła) - w. „Zawodzie” (z węzłem) – realizowany w systemie Zaprojektuj i Buduj, • odcinek H w. „Zawodzie” (bez węzła) - w. „Woźniki” (z węzłem) – realizowany w systemie Buduj, • odcinek I w. „Woźniki” (bez węzła) - w. „Pyrzowice” (bez węzła) – realizowany w systemie Buduj. W ramach zadania obejmującego odcinek F umieszczono odcinek 1,03 km włączenia do istniejącej DK 1, który nominalnie znajduje się w odcinku E. (Polish)
0 references
The main part of the project is the construction of the A1 motorway in the section Pyrzowice – the end of the Częstochowa ring road, located in the TEN-T core network, the Baltic-Adriatic corridor, with a total length of 57.70 km. This includes the inclusion of the A1 motorway into the existing section of national road No 1, which has parameters of the motorway for 0.88 km (the total length of integration is 1.03 km, of which 0.15 km does not have motorway parameters). Since the project is implemented in part in the Design and Building formula, and at present the final design solutions and the permanent traffic organisation project are not yet known, the above-mentioned length of the road to be built must be estimated and can be corrected. The beginning of the investment took place in km 417 + 530,00 (preceded by the incorporation section of DK 1 from km 416 + 500 to km 417+ 530; the section from km 416 + 650 to km 417 + 530 has parameters of the motorway) in front of the Rząsaw junction. The end of the investment was designed in km 474 + 350.00 before the “Pyrzowice” junction in Ożarowice commune. The project at the stage of the preparation of the investment and implementation (contract sections) has been divided into four tasks: • section F w. “Rząsawa” (with a node) – w. “Blachownia” (with node) – implemented in the system Za Projektuj i Buduj, • section G w. “Blachownia” (without a node) – w. “Zawodzie” (without a node) – implemented in the system. As part of the task covering section F, a section of 1.03 km was included in the existing DK 1, which is nominally in section E. (English)
14 October 2020
0 references
Identifiers
POIS.03.01.00-00-0015/16
0 references
4143