Construction of the S7 expressway, odc. Kraków’s Igołomska century — Mr Christo Botewa. (Q85829): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): Construction of the S7 expressway, odc.Kraków’s Igołomska century — Mr Christo Botewa in length 4,47, remove_old_english_translation) |
||
Property / summary | |||
Property / summary: Construction of the S7 expressway, odc.Kraków’s Igołomska century — Mr Christo Botewa in length 4,47 (English) / rank | |||
Revision as of 14:47, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of the S7 expressway, odc. Kraków’s Igołomska century — Mr Christo Botewa. |
Project in Poland financed by DG Regio |
Statements
318,439,702.07 zloty
0 references
374,634,943.62 zloty
0 references
85.0 percent
0 references
1 January 2014
0 references
31 December 2017
0 references
GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD
0 references
Budowa drogi ekspresowej S7, odc. Kraków w. Igołomska – w. Christo Botewa o długości 4,47 (Polish)
0 references
Identifiers
POIS.03.01.00-00-0008/15
0 references