Construction of the S7 Radom (Jedlińsk) — Jędrzejów, (Q85825): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project will be carried out in the area of Kielce and jędrzejowski districts (Świętokrzyskie Province) and includes:Construction of an expressway with a cross section of 2x2 and a length of 21.553 km;Construction of three road nodes (‘Tokarnia’, ‘Brzegi’, ‘Mniów’), two junction areas (‘Smyks’, ‘Podlesie’) and ‘heathers’ areas;— the necessary construction and conversion of engineering structures, roads, road/road corridors, noise barriers,...)
(‎Created claim: summary (P836): The project will be carried out in the areas of Kielce and jjrzejowski districts (Świętokrzyskie voivodeship) and includes: — construction of an expressway with a cross section of 2x2 and a length of 21,553 km; — construction of three road junctions (“Tokarnia”, “Brzegi” “Mnichów”), two Travel Service Facilities (“Smyków”, “Podlesie”) and Vehicle Control Sites “Wrzosy”; — the necessary construction and reconstruction of engineering facilities, r...)
Property / summary
 
The project will be carried out in the areas of Kielce and jjrzejowski districts (Świętokrzyskie voivodeship) and includes: — construction of an expressway with a cross section of 2x2 and a length of 21,553 km; — construction of three road junctions (“Tokarnia”, “Brzegi” “Mnichów”), two Travel Service Facilities (“Smyków”, “Podlesie”) and Vehicle Control Sites “Wrzosy”; — the necessary construction and reconstruction of engineering facilities, roads, walking and roadways, acoustic screens, animal crossings, road culverts, rainwater drainage system, lighting, conflicting equipment, BRD equipment; — demolition and demolition of buildings and buildings, – planting greenery. (English)
Property / summary: The project will be carried out in the areas of Kielce and jjrzejowski districts (Świętokrzyskie voivodeship) and includes: — construction of an expressway with a cross section of 2x2 and a length of 21,553 km; — construction of three road junctions (“Tokarnia”, “Brzegi” “Mnichów”), two Travel Service Facilities (“Smyków”, “Podlesie”) and Vehicle Control Sites “Wrzosy”; — the necessary construction and reconstruction of engineering facilities, roads, walking and roadways, acoustic screens, animal crossings, road culverts, rainwater drainage system, lighting, conflicting equipment, BRD equipment; — demolition and demolition of buildings and buildings, – planting greenery. (English) / rank
 
Normal rank
Property / summary: The project will be carried out in the areas of Kielce and jjrzejowski districts (Świętokrzyskie voivodeship) and includes: — construction of an expressway with a cross section of 2x2 and a length of 21,553 km; — construction of three road junctions (“Tokarnia”, “Brzegi” “Mnichów”), two Travel Service Facilities (“Smyków”, “Podlesie”) and Vehicle Control Sites “Wrzosy”; — the necessary construction and reconstruction of engineering facilities, roads, walking and roadways, acoustic screens, animal crossings, road culverts, rainwater drainage system, lighting, conflicting equipment, BRD equipment; — demolition and demolition of buildings and buildings, – planting greenery. (English) / qualifier
 
point in time: 14 October 2020
Timestamp+2020-10-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:47, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the S7 Radom (Jedlińsk) — Jędrzejów,
Project in Poland financed by DG Regio

    Statements

    0 references
    387,422,101.1 zloty
    0 references
    92,981,304.26 Euro
    13 January 2020
    0 references
    455,790,707.18 zloty
    0 references
    109,389,769.72 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2019
    0 references
    GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD
    0 references
    0 references

    50°39'25.9"N, 20°17'47.4"E
    0 references

    50°48'6.8"N, 20°52'54.1"E
    0 references
    Projekt będzie realizowany na obszarze powiatów kieleckiego i jędrzejowskiego (woj. świętokrzyskie) i obejmuje: - budowę drogi ekspresowej o przekroju poprzecznym 2x2 i długości 21,553 km; - budowę trzech węzłów drogowych („Tokarnia”, „Brzegi” „Mnichów”), dwóch Miejsc Obsługi Podróżnych („Smyków”, „Podlesie”) oraz Miejsca Kontroli Pojazdów „Wrzosy”; - niezbędną budowę i przebudowę obiektów inżynierskich, dróg, ciągów pieszo-jezdnych, ekranów akustycznych, przejść dla zwierząt, przepustów drogowych, systemu odprowadzania wód deszczowych, oświetlenia, kolidującego uzbrojenia terenu, urządzeń BRD; - wyburzenia i rozbiórki budynków i budowli, - nasadzenia zieleni. (Polish)
    0 references
    The project will be carried out in the areas of Kielce and jjrzejowski districts (Świętokrzyskie voivodeship) and includes: — construction of an expressway with a cross section of 2x2 and a length of 21,553 km; — construction of three road junctions (“Tokarnia”, “Brzegi” “Mnichów”), two Travel Service Facilities (“Smyków”, “Podlesie”) and Vehicle Control Sites “Wrzosy”; — the necessary construction and reconstruction of engineering facilities, roads, walking and roadways, acoustic screens, animal crossings, road culverts, rainwater drainage system, lighting, conflicting equipment, BRD equipment; — demolition and demolition of buildings and buildings, – planting greenery. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.03.01.00-00-0004/15
    0 references