Thermal modernisation of the channel and air pipes in Gdynia, Rumi and Wejherowo. (Q84851): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The project consists of an exchange of insulation on the heat pipes arranged in the district heating ducts, with diameters of 2dn 100 to 2dn 600, and hot water exchanges on pre-insulated technologies.In the case of warm air pipes, only the insulation shall be replaced.The project will carry out 13 investment tasks, including 3 on district heating and 10 on networks.In total, 4 district heating and around district heating will be modernised as...) |
||
Property / summary | |||
Property / summary: The project consists of an exchange of insulation on the heat pipes arranged in the district heating ducts, with diameters of 2dn 100 to 2dn 600, and hot water exchanges on pre-insulated technologies.In the case of warm air pipes, only the insulation shall be replaced.The project will carry out 13 investment tasks, including 3 on district heating and 10 on networks.In total, 4 district heating and around district heating will be modernised as part of the project.6 169 mb of the net. (English) / rank | |||
Revision as of 14:40, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of the channel and air pipes in Gdynia, Rumi and Wejherowo. |
Project in Poland financed by DG Regio |
Statements
12,302,180.0 zloty
0 references
21,890,000.0 zloty
0 references
56.2 percent
0 references
1 January 2017
0 references
31 December 2021
0 references
OKRĘGOWE PRZEDSIĘBIORSTWO ENERGETYKI CIEPLNEJ SPÓŁKA Z O.O.
0 references
Projekt polega na wymianie izolacji na ciepłociągach ułożonych w kanałach ciepłowniczych, o średnicach od 2DN 100 do 2DN 600 oraz wymianie ciepłociągów na technologie preizolowaną. W przypadku ciepłociągów napowietrznych wymianie będzie podlegać jedynie izolacja. W ramach Projektu zostanie zrealizowanych 13 zadań inwestycyjnych, w tym 3 dotyczące komór ciepłowniczych i 10 dotyczących sieci. Łącznie w ramach Projektu zmodernizowane zostaną 4 komory ciepłownicze i ok. 6 169 mb sieci. (Polish)
0 references
Identifiers
POIS.01.05.00-00-0035/16