Improving the efficiency of the transmission and distribution of heat and the development of a residential district heating network in Kędzierzyn-Koźle (Q84817): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The main objective of the project is to improve air quality by reducing the so-called ‘air quality’.“low emission” and reducing energy losses generated by the distribution of energy and heat.Achieving the target will be achieved through the extension of the network and the connection of new customers, as well as the modernisation of the old heat grid.The project consists of modernising and extending the network to the three sites of Kędzierzyn...)
Property / summary
The main objective of the project is to improve air quality by reducing the so-called ‘air quality’.“low emission” and reducing energy losses generated by the distribution of energy and heat.Achieving the target will be achieved through the extension of the network and the connection of new customers, as well as the modernisation of the old heat grid.The project consists of modernising and extending the network to the three sites of Kędzierzyn-Koźle, in the area of modernisation through a thorough replacement of the existing heat network made in traditional technology into a new preinsulated.The construction works identified 5 tasks, which are 3 steps for the modernisation of the thermal network and 2 stages of the expansion of the thermal network. (English)
 
Property / summary: The main objective of the project is to improve air quality by reducing the so-called ‘air quality’.“low emission” and reducing energy losses generated by the distribution of energy and heat.Achieving the target will be achieved through the extension of the network and the connection of new customers, as well as the modernisation of the old heat grid.The project consists of modernising and extending the network to the three sites of Kędzierzyn-Koźle, in the area of modernisation through a thorough replacement of the existing heat network made in traditional technology into a new preinsulated.The construction works identified 5 tasks, which are 3 steps for the modernisation of the thermal network and 2 stages of the expansion of the thermal network. (English) / rank
Normal rank
 

Revision as of 14:39, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Improving the efficiency of the transmission and distribution of heat and the development of a residential district heating network in Kędzierzyn-Koźle
Project in Poland financed by DG Regio

    Statements

    0 references
    7,242,610.04 zloty
    0 references
    1,738,226.41 Euro
    13 January 2020
    0 references
    13,459,939.0 zloty
    0 references
    3,230,385.36 Euro
    13 January 2020
    0 references
    53.81 percent
    0 references
    28 April 2017
    0 references
    31 December 2020
    0 references
    MIEJSKI ZAKŁAD ENERGETYKI CIEPLNEJ SP. Z O.O.
    0 references
    0 references
    0 references
    Celem głównym projektu jest poprawa jakości powietrza poprzez zmniejszenie tzw. „niskiej emisji” oraz ograniczenie strat energii powstających w procesie dystrybucji energii i ciepła. Realizacja celu nastąpi poprzez rozbudowę sieci oraz przyłączenie nowych odbiorców, a także modernizację starej sieci cieplnej. Projekt zakłada zmodernizowanie i rozbudowę sieci na trzech osiedlach Kędzierzyna-Koźla, w zakresie modernizacji poprzez gruntowną wymianę istniejącej sieci cieplnej wykonanej w technologii tradycyjnej na nową preizolowaną. W ramach robót budowlano montażowych wyodrębniono 5 zadań, które stanowią 3 etapy modernizacji sieci cieplnej oraz 2 etapy rozbudowy sieci cieplnej. (Polish)