Thermal modernisation of Building No 41, 41A — 41B in m. Koszalin (Q84526): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The main goal of the project is to reduce the level of energy consumption in public buildings, which has so far been inflated in particular during the heating period due to the lack of adequate warming and insulation of buildings, the inertia of the doors and the poor technical condition.Investment will reduce the demand for final energy consumption by 131 GJ/year and reduce greenhouse gas (CO2) emissions by 263,93 tonnes/year.The improvement...) |
(Created claim: summary (P836): The main objective of the project is to reduce the level of energy consumption in public buildings, which so far has been overstated, especially during the heating period due to the lack of adequate insulation and insulation of buildings, leakage of doors and poor technical condition. The investment will reduce final energy consumption by 131 GJ/year and reduce greenhouse gas emissions (CO2) by 263.93 Mg/year. The improvement of buildings will c...) |
||||||||||||||
Property / summary | |||||||||||||||
The main objective of the project is to reduce the level of energy consumption in public buildings, which so far has been overstated, especially during the heating period due to the lack of adequate insulation and insulation of buildings, leakage of doors and poor technical condition. The investment will reduce final energy consumption by 131 GJ/year and reduce greenhouse gas emissions (CO2) by 263.93 Mg/year. The improvement of buildings will consist of work to reduce the demand for final energy delivered to buildings for heating and the preparation of hot water. The thermal insulation of partitions will be adapted to the minimum requirements for energy savings and thermal insulation set out in technical building regulations, which will apply from 2021. Renewable energy sources for hot water will be installed. (English) | |||||||||||||||
Property / summary: The main objective of the project is to reduce the level of energy consumption in public buildings, which so far has been overstated, especially during the heating period due to the lack of adequate insulation and insulation of buildings, leakage of doors and poor technical condition. The investment will reduce final energy consumption by 131 GJ/year and reduce greenhouse gas emissions (CO2) by 263.93 Mg/year. The improvement of buildings will consist of work to reduce the demand for final energy delivered to buildings for heating and the preparation of hot water. The thermal insulation of partitions will be adapted to the minimum requirements for energy savings and thermal insulation set out in technical building regulations, which will apply from 2021. Renewable energy sources for hot water will be installed. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The main objective of the project is to reduce the level of energy consumption in public buildings, which so far has been overstated, especially during the heating period due to the lack of adequate insulation and insulation of buildings, leakage of doors and poor technical condition. The investment will reduce final energy consumption by 131 GJ/year and reduce greenhouse gas emissions (CO2) by 263.93 Mg/year. The improvement of buildings will consist of work to reduce the demand for final energy delivered to buildings for heating and the preparation of hot water. The thermal insulation of partitions will be adapted to the minimum requirements for energy savings and thermal insulation set out in technical building regulations, which will apply from 2021. Renewable energy sources for hot water will be installed. (English) / qualifier | |||||||||||||||
point in time: 14 October 2020
|
Revision as of 13:09, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of Building No 41, 41A — 41B in m. Koszalin |
Project in Poland financed by DG Regio |
Statements
2,070,653.5 zloty
0 references
2,436,062.95 zloty
0 references
85.0 percent
0 references
18 August 2015
0 references
30 November 2017
0 references
CENTRALNY OŚRODEK SZKOLENIA STRAŻY GRANICZNEJ IM. MARSZAŁKA POLSKI JÓZEFA PIŁSUDSKIEGO W KOSZALINIE
0 references
Głównym celem projektu jest obniżenie poziomu zużycia energii w budynkach użyteczności publicznej, który dotychczas jest zawyżony zwłaszcza w okresie grzewczym w związku z brakiem odpowiedniego ocieplenia i izolacji budynków, nieszczelnością drzwi i złym stanem technicznym. Podjęcie inwestycji doprowadzi do zmniejszenia zapotrzebowania na zużycie energii końcowej o 131 GJ/rok oraz pozwoli na zredukowanie emisji gazów cieplarnianych (CO2) o 263,93 Mg/rok. Ulepszenie budynków będzie polegało na przeprowadzeniu prac w wyniku, których następuje zmniejszenie zapotrzebowania na energię końcową dostarczoną do budynków na potrzeby ogrzewania i przygotowania ciepłej wody użytkowej. Izolacyjność cieplna przegród, będzie dostosowana do minimalnych wymagań dotyczących oszczędności energii i izolacyjności cieplnej określonych w przepisach techniczno-budowlanych, które obowiązywać będą od roku 2021. Zostaną zamontowane odnawialne źródła energii na potrzeby ciepłej wody użytkowej. (Polish)
0 references
The main objective of the project is to reduce the level of energy consumption in public buildings, which so far has been overstated, especially during the heating period due to the lack of adequate insulation and insulation of buildings, leakage of doors and poor technical condition. The investment will reduce final energy consumption by 131 GJ/year and reduce greenhouse gas emissions (CO2) by 263.93 Mg/year. The improvement of buildings will consist of work to reduce the demand for final energy delivered to buildings for heating and the preparation of hot water. The thermal insulation of partitions will be adapted to the minimum requirements for energy savings and thermal insulation set out in technical building regulations, which will apply from 2021. Renewable energy sources for hot water will be installed. (English)
14 October 2020
0 references
Identifiers
POIS.01.03.01-00-0047/16
0 references